Uh oh!
There was an error while loading. Please reload this page.
Tests #13
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
tests.yml
on: schedule
Matrix: test
Lint with pre-commit
9s
Build package
0s
Annotations
8 errors
Lint with pre-commit Process completed with exit code 1. |
Test on Python 3.10 Process completed with exit code 4. |
Test on Python 3.9 Process completed with exit code 4. |
Test on Python 3.9 The strategy configuration was canceled because "test._3_10" failed |
Test on Python 3.12 Process completed with exit code 4. |
Test on Python 3.12 The strategy configuration was canceled because "test._3_10" failed |
Test on Python 3.11 The operation was canceled. |
Test on Python 3.11 The strategy configuration was canceled because "test._3_10" failed |