Uh oh!
There was an error while loading. Please reload this page.
Tests #15
tests.yml
on: schedule
Matrix: test
Lint with pre-commit
11s
Build package
0s
Annotations
8 errors
Lint with pre-commit Process completed with exit code 1. |
Test on Python 3.11 Process completed with exit code 4. |
Test on Python 3.12 The operation was canceled. |
Test on Python 3.12 The strategy configuration was canceled because "test._3_11" failed |
Test on Python 3.10 The operation was canceled. |
Test on Python 3.10 The strategy configuration was canceled because "test._3_11" failed |
Test on Python 3.9 The operation was canceled. |
Test on Python 3.9 The strategy configuration was canceled because "test._3_11" failed |