❗ Possible math error in some scheduling models #605

Description

@jpn--

There may be a hidden math error in some scheduling models: generally, any model where the is a shift term that is the square of a time period value (start time, end time, duration).

Trip and tour start and end times are stored as int8 in the various tables where they appear. By extension, durations also may be int8. This seems superficially fine, as the most ambitious model probably won't have less than 15 minute time periods, so the max number of periods in a day would by 96, less than the max int8 value of 127.

BUT: If you write an expression in a spec file doing math with time periods, AND if that expression might overflow the int8 e.g. by squaring, AND if you don't explicitly upcast the to a more appropriate dtype, THEN the math can overflow and wrap around. We observe this if we take the square of an int8 array of time period values:

>>> pd.Series(np.arange(24), dtype=np.int8) ** 2
0 0
1 1
2 4
3 9
4 16
5 25
6 36
7 49
8 64
9 81
10 100
11 121
12 -112
13 -87
14 -60
15 -31
16 0
17 33
18 68
19 105
20 -112
21 -71
22 -28
23 17
dtype: int8

The consequences of this math error may wash out if associated coefficients are zero, or if the squared values are always 11 or less by construction or coincidence, or potentially for other reasons. Some study will be required to determine if that is the case, but my preliminary guess is that it does not wash out at least sometimes, based on discovering this through anomalies between sharrow-with-time-windows and legacy code on the prototype MWCOG model.

Based on a cursory review of model spec files in our repository, I observe that scheduling for joint and non-mandatory tours may be affected in these models:

  • ARC
  • MWCOG
  • SEMCOG
  • anyone using one of these models as a donor (probably CMAP, Met Council)

cc: @guyrousseau@JilanChen@mmoran3@ray-ngo@jfdman@i-am-sijia

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      , 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Add copy buttons to all
       blocks\n(function() {\n function addCopyButtons() {\n document.querySelectorAll('pre code').forEach(function(codeBlock) {\n if (codeBlock.parentElement.hasAttribute('data-copy-added')) return;\n codeBlock.parentElement.setAttribute('data-copy-added', 'true');\n \n var btn = document.createElement('button');\n btn.textContent = 'Copy';\n btn.style.cssText = 'position:absolute;top:4px;right:4px;padding:2px 8px;font-size:11px;background:#4ecdc4;border:none;border-radius:4px;color:#1a1a2e;cursor:pointer;opacity:0.7;transition:opacity 0.2s;';\n btn.onmouseover = function() { this.style.opacity = '1'; };\n btn.onmouseout = function() { this.style.opacity = '0.7'; };\n btn.onclick = function() {\n navigator.clipboard.writeText(codeBlock.textContent).then(function() {\n btn.textContent = 'Copied!';\n setTimeout(function() { btn.textContent = 'Copy'; }, 1500);\n });\n };\n codeBlock.parentElement.style.position = 'relative';\n codeBlock.parentElement.appendChild(btn);\n });\n }\n \n addCopyButtons();\n \n // Re-run on dynamic content\n var observer = new MutationObserver(addCopyButtons);\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "Add Copy Buttons to Code Blocks");
      }
      } catch(__e) { console.warn('[Userscript:Add Copy Buttons to Code Blocks]', __e); }
      })();
      (function(){
      try {
      var __m = "github.com";
      var __re = new RegExp('^' + "github\\.com" + '
      
      Skip to content

      ❗ Possible math error in some scheduling models #605

      Description

      @jpn--

      There may be a hidden math error in some scheduling models: generally, any model where the is a shift term that is the square of a time period value (start time, end time, duration).

      Trip and tour start and end times are stored as int8 in the various tables where they appear. By extension, durations also may be int8. This seems superficially fine, as the most ambitious model probably won't have less than 15 minute time periods, so the max number of periods in a day would by 96, less than the max int8 value of 127.

      BUT: If you write an expression in a spec file doing math with time periods, AND if that expression might overflow the int8 e.g. by squaring, AND if you don't explicitly upcast the to a more appropriate dtype, THEN the math can overflow and wrap around. We observe this if we take the square of an int8 array of time period values:

      >>> pd.Series(np.arange(24), dtype=np.int8) ** 2
      0 0
      1 1
      2 4
      3 9
      4 16
      5 25
      6 36
      7 49
      8 64
      9 81
      10 100
      11 121
      12 -112
      13 -87
      14 -60
      15 -31
      16 0
      17 33
      18 68
      19 105
      20 -112
      21 -71
      22 -28
      23 17
      dtype: int8
      

      The consequences of this math error may wash out if associated coefficients are zero, or if the squared values are always 11 or less by construction or coincidence, or potentially for other reasons. Some study will be required to determine if that is the case, but my preliminary guess is that it does not wash out at least sometimes, based on discovering this through anomalies between sharrow-with-time-windows and legacy code on the prototype MWCOG model.

      Based on a cursory review of model spec files in our repository, I observe that scheduling for joint and non-mandatory tours may be affected in these models:

      • ARC
      • MWCOG
      • SEMCOG
      • anyone using one of these models as a donor (probably CMAP, Met Council)

      cc: @guyrousseau@JilanChen@mmoran3@ray-ngo@jfdman@i-am-sijia

      Metadata

      Metadata

      Assignees

      No one assigned

        Labels

        No labels
        No labels

        Type

        No type

        Projects

        No projects

          Milestone

          No milestone

          Relationships

          None yet

          Development

          No branches or pull requests

          Issue actions

          , 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Force GitHub README to respect dark mode\n(function() {\n var style = document.createElement('style');\n style.textContent = '\n .markdown-body {\n color-scheme: dark light;\n }\n .markdown-body pre { background: #161b22 !important; }\n .markdown-body code { background: rgba(110, 118, 129, 0.4) !important; }\n .markdown-body table th, .markdown-body table td { border-color: #30363d !important; }\n .markdown-body img { background: #0d1117; }\n .markdown-body blockquote { border-left-color: #8b949e; }\n .markdown-body hr { border-color: #30363d; }\n ';\n document.head.appendChild(style);\n})();", "GitHub Dark Mode README Fix"); } } catch(__e) { console.warn('[Userscript:GitHub Dark Mode README Fix]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
          Skip to content

          ❗ Possible math error in some scheduling models #605

          Description

          @jpn--

          There may be a hidden math error in some scheduling models: generally, any model where the is a shift term that is the square of a time period value (start time, end time, duration).

          Trip and tour start and end times are stored as int8 in the various tables where they appear. By extension, durations also may be int8. This seems superficially fine, as the most ambitious model probably won't have less than 15 minute time periods, so the max number of periods in a day would by 96, less than the max int8 value of 127.

          BUT: If you write an expression in a spec file doing math with time periods, AND if that expression might overflow the int8 e.g. by squaring, AND if you don't explicitly upcast the to a more appropriate dtype, THEN the math can overflow and wrap around. We observe this if we take the square of an int8 array of time period values:

          >>> pd.Series(np.arange(24), dtype=np.int8) ** 2
          0 0
          1 1
          2 4
          3 9
          4 16
          5 25
          6 36
          7 49
          8 64
          9 81
          10 100
          11 121
          12 -112
          13 -87
          14 -60
          15 -31
          16 0
          17 33
          18 68
          19 105
          20 -112
          21 -71
          22 -28
          23 17
          dtype: int8
          

          The consequences of this math error may wash out if associated coefficients are zero, or if the squared values are always 11 or less by construction or coincidence, or potentially for other reasons. Some study will be required to determine if that is the case, but my preliminary guess is that it does not wash out at least sometimes, based on discovering this through anomalies between sharrow-with-time-windows and legacy code on the prototype MWCOG model.

          Based on a cursory review of model spec files in our repository, I observe that scheduling for joint and non-mandatory tours may be affected in these models:

          • ARC
          • MWCOG
          • SEMCOG
          • anyone using one of these models as a donor (probably CMAP, Met Council)

          cc: @guyrousseau@JilanChen@mmoran3@ray-ngo@jfdman@i-am-sijia

          Metadata

          Metadata

          Assignees

          No one assigned

            Labels

            No labels
            No labels

            Type

            No type

            Projects

            No projects

              Milestone

              No milestone

              Relationships

              None yet

              Development

              No branches or pull requests

              Issue actions

              , 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Highlight search terms from Google/DuckDuckGo/Bing referrer\n(function() {\n var ref = document.referrer;\n var terms = [];\n \n if (ref.includes('google.com') || ref.includes('duckduckgo.com') || ref.includes('bing.com')) {\n var url = new URL(ref);\n var q = url.searchParams.get('q') || url.searchParams.get('p');\n if (q) {\n terms = q.split(/\\s+/).filter(function(t) { return t.length > 2; });\n }\n }\n \n if (terms.length === 0) return;\n \n var style = document.createElement('style');\n style.textContent = '.userscript-highlight { background: #fbbf24; color: #1a1a2e; padding: 1px 3px; border-radius: 2px; }';\n document.head.appendChild(style);\n \n function highlight(node) {\n if (node.nodeType === 3) { // text node\n var text = node.textContent;\n var found = false;\n terms.forEach(function(term) {\n var regex = new RegExp('(' + term.replace(/[.*+?^${}()|[\\]\\\\]/g, '\\\\') + ')', 'gi');\n if (regex.test(text)) {\n found = true;\n var frag = document.createDocumentFragment();\n var parts = text.split(regex);\n parts.forEach(function(part, i) {\n if (i % 2 === 0) {\n frag.appendChild(document.createTextNode(part));\n } else {\n var span = document.createElement('span');\n span.className = 'userscript-highlight';\n span.textContent = part;\n frag.appendChild(span);\n }\n });\n node.parentNode.replaceChild(frag, node);\n }\n });\n } else if (node.nodeType === 1 && node.childNodes) { // element\n var skipTags = ['SCRIPT', 'STYLE', 'NOSCRIPT', 'TEXTAREA', 'INPUT', 'SELECT'];\n if (!skipTags.includes(node.tagName)) {\n Array.from(node.childNodes).forEach(highlight);\n }\n }\n }\n \n highlight(document.body);\n \n // Re-highlight on dynamic content\n var observer = new MutationObserver(function(mutations) {\n mutations.forEach(function(m) {\n m.addedNodes.forEach(function(node) {\n if (node.nodeType === 1 || node.nodeType === 3) highlight(node);\n });\n });\n });\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "Highlight Search Terms"); } } catch(__e) { console.warn('[Userscript:Highlight Search Terms]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
              Skip to content

              ❗ Possible math error in some scheduling models #605

              Description

              @jpn--

              There may be a hidden math error in some scheduling models: generally, any model where the is a shift term that is the square of a time period value (start time, end time, duration).

              Trip and tour start and end times are stored as int8 in the various tables where they appear. By extension, durations also may be int8. This seems superficially fine, as the most ambitious model probably won't have less than 15 minute time periods, so the max number of periods in a day would by 96, less than the max int8 value of 127.

              BUT: If you write an expression in a spec file doing math with time periods, AND if that expression might overflow the int8 e.g. by squaring, AND if you don't explicitly upcast the to a more appropriate dtype, THEN the math can overflow and wrap around. We observe this if we take the square of an int8 array of time period values:

              >>> pd.Series(np.arange(24), dtype=np.int8) ** 2
              0 0
              1 1
              2 4
              3 9
              4 16
              5 25
              6 36
              7 49
              8 64
              9 81
              10 100
              11 121
              12 -112
              13 -87
              14 -60
              15 -31
              16 0
              17 33
              18 68
              19 105
              20 -112
              21 -71
              22 -28
              23 17
              dtype: int8
              

              The consequences of this math error may wash out if associated coefficients are zero, or if the squared values are always 11 or less by construction or coincidence, or potentially for other reasons. Some study will be required to determine if that is the case, but my preliminary guess is that it does not wash out at least sometimes, based on discovering this through anomalies between sharrow-with-time-windows and legacy code on the prototype MWCOG model.

              Based on a cursory review of model spec files in our repository, I observe that scheduling for joint and non-mandatory tours may be affected in these models:

              • ARC
              • MWCOG
              • SEMCOG
              • anyone using one of these models as a donor (probably CMAP, Met Council)

              cc: @guyrousseau@JilanChen@mmoran3@ray-ngo@jfdman@i-am-sijia

              Metadata

              Metadata

              Assignees

              No one assigned

                Labels

                No labels
                No labels

                Type

                No type

                Projects

                No projects

                  Milestone

                  No milestone

                  Relationships

                  None yet

                  Development

                  No branches or pull requests

                  Issue actions

                  , 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Strip utm_, fbclid, gclid, etc. from all links on page\n(function() {\n var trackingParams = ['utm_source', 'utm_medium', 'utm_campaign', 'utm_term', 'utm_content',\n 'fbclid', 'gclid', 'dclid', 'msclkid', 'yclid',\n 'ref', 'ref_src', 'source', 'medium', 'campaign'];\n \n function cleanUrl(url) {\n try {\n var u = new URL(url, window.location.origin);\n var changed = false;\n trackingParams.forEach(function(p) {\n if (u.searchParams.has(p)) {\n u.searchParams.delete(p);\n changed = true;\n }\n });\n return changed ? u.toString() : url;\n } catch (e) {\n return url;\n }\n }\n \n function cleanLinks() {\n document.querySelectorAll('a[href]').forEach(function(a) {\n var clean = cleanUrl(a.href);\n if (clean !== a.href) a.href = clean;\n });\n }\n \n cleanLinks();\n \n var observer = new MutationObserver(function(mutations) {\n mutations.forEach(function(m) {\n m.addedNodes.forEach(function(node) {\n if (node.nodeType === 1) {\n if (node.tagName === 'A') cleanLinks();\n node.querySelectorAll('a[href]').forEach(function(a) {\n var clean = cleanUrl(a.href);\n if (clean !== a.href) a.href = clean;\n });\n }\n });\n });\n });\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "Remove Tracking Parameters from Links"); } } catch(__e) { console.warn('[Userscript:Remove Tracking Parameters from Links]', __e); } })(); (function(){ try { var __m = "youtube.com"; var __re = new RegExp('^' + "youtube\\.com" + '
                  Skip to content

                  ❗ Possible math error in some scheduling models #605

                  Description

                  @jpn--

                  There may be a hidden math error in some scheduling models: generally, any model where the is a shift term that is the square of a time period value (start time, end time, duration).

                  Trip and tour start and end times are stored as int8 in the various tables where they appear. By extension, durations also may be int8. This seems superficially fine, as the most ambitious model probably won't have less than 15 minute time periods, so the max number of periods in a day would by 96, less than the max int8 value of 127.

                  BUT: If you write an expression in a spec file doing math with time periods, AND if that expression might overflow the int8 e.g. by squaring, AND if you don't explicitly upcast the to a more appropriate dtype, THEN the math can overflow and wrap around. We observe this if we take the square of an int8 array of time period values:

                  >>> pd.Series(np.arange(24), dtype=np.int8) ** 2
                  0 0
                  1 1
                  2 4
                  3 9
                  4 16
                  5 25
                  6 36
                  7 49
                  8 64
                  9 81
                  10 100
                  11 121
                  12 -112
                  13 -87
                  14 -60
                  15 -31
                  16 0
                  17 33
                  18 68
                  19 105
                  20 -112
                  21 -71
                  22 -28
                  23 17
                  dtype: int8
                  

                  The consequences of this math error may wash out if associated coefficients are zero, or if the squared values are always 11 or less by construction or coincidence, or potentially for other reasons. Some study will be required to determine if that is the case, but my preliminary guess is that it does not wash out at least sometimes, based on discovering this through anomalies between sharrow-with-time-windows and legacy code on the prototype MWCOG model.

                  Based on a cursory review of model spec files in our repository, I observe that scheduling for joint and non-mandatory tours may be affected in these models:

                  • ARC
                  • MWCOG
                  • SEMCOG
                  • anyone using one of these models as a donor (probably CMAP, Met Council)

                  cc: @guyrousseau@JilanChen@mmoran3@ray-ngo@jfdman@i-am-sijia

                  Metadata

                  Metadata

                  Assignees

                  No one assigned

                    Labels

                    No labels
                    No labels

                    Type

                    No type

                    Projects

                    No projects

                      Milestone

                      No milestone

                      Relationships

                      None yet

                      Development

                      No branches or pull requests

                      Issue actions

                      , 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Auto-enable theater mode on YouTube\n(function() {\n function tryTheater() {\n var btn = document.querySelector('button[aria-label=\"Theater mode\"], ytd-player #player button[title=\"Theater mode\"]');\n if (btn && !btn.classList.contains('activated')) {\n btn.click();\n }\n }\n \n // Try immediately\n tryTheater();\n \n // Try after navigation (SPA)\n var lastUrl = location.href;\n setInterval(function() {\n if (location.href !== lastUrl) {\n lastUrl = location.href;\n setTimeout(tryTheater, 500);\n }\n }, 1000);\n \n // Also try on player load\n var observer = new MutationObserver(tryTheater);\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "YouTube Theater Mode Default"); } } catch(__e) { console.warn('[Userscript:YouTube Theater Mode Default]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
                      Skip to content

                      ❗ Possible math error in some scheduling models #605

                      Description

                      @jpn--

                      There may be a hidden math error in some scheduling models: generally, any model where the is a shift term that is the square of a time period value (start time, end time, duration).

                      Trip and tour start and end times are stored as int8 in the various tables where they appear. By extension, durations also may be int8. This seems superficially fine, as the most ambitious model probably won't have less than 15 minute time periods, so the max number of periods in a day would by 96, less than the max int8 value of 127.

                      BUT: If you write an expression in a spec file doing math with time periods, AND if that expression might overflow the int8 e.g. by squaring, AND if you don't explicitly upcast the to a more appropriate dtype, THEN the math can overflow and wrap around. We observe this if we take the square of an int8 array of time period values:

                      >>> pd.Series(np.arange(24), dtype=np.int8) ** 2
                      0 0
                      1 1
                      2 4
                      3 9
                      4 16
                      5 25
                      6 36
                      7 49
                      8 64
                      9 81
                      10 100
                      11 121
                      12 -112
                      13 -87
                      14 -60
                      15 -31
                      16 0
                      17 33
                      18 68
                      19 105
                      20 -112
                      21 -71
                      22 -28
                      23 17
                      dtype: int8
                      

                      The consequences of this math error may wash out if associated coefficients are zero, or if the squared values are always 11 or less by construction or coincidence, or potentially for other reasons. Some study will be required to determine if that is the case, but my preliminary guess is that it does not wash out at least sometimes, based on discovering this through anomalies between sharrow-with-time-windows and legacy code on the prototype MWCOG model.

                      Based on a cursory review of model spec files in our repository, I observe that scheduling for joint and non-mandatory tours may be affected in these models:

                      • ARC
                      • MWCOG
                      • SEMCOG
                      • anyone using one of these models as a donor (probably CMAP, Met Council)

                      cc: @guyrousseau@JilanChen@mmoran3@ray-ngo@jfdman@i-am-sijia

                      Metadata

                      Metadata

                      Assignees

                      No one assigned

                        Labels

                        No labels
                        No labels

                        Type

                        No type

                        Projects

                        No projects

                          Milestone

                          No milestone

                          Relationships

                          None yet

                          Development

                          No branches or pull requests

                          Issue actions

                          , 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Remove or un-stick sticky/fixed headers that block content\n(function() {\n function unstick() {\n document.querySelectorAll('header, nav, [role=\"banner\"], .header, .navbar, .sticky, .fixed-top, [style*=\"position: fixed\"], [style*=\"position:sticky\"]').forEach(function(el) {\n if (el.style.position === 'fixed' || el.style.position === 'sticky' || \n getComputedStyle(el).position === 'fixed' || getComputedStyle(el).position === 'sticky') {\n el.style.position = 'static';\n el.style.top = 'auto';\n el.style.zIndex = 'auto';\n }\n });\n }\n \n unstick();\n \n var observer = new MutationObserver(unstick);\n observer.observe(document.body, { childList: true, subtree: true, attributes: true, attributeFilter: ['style', 'class'] });\n})();", "Kill Sticky Headers"); } } catch(__e) { console.warn('[Userscript:Kill Sticky Headers]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
                          Skip to content

                          ❗ Possible math error in some scheduling models #605

                          Description

                          @jpn--

                          There may be a hidden math error in some scheduling models: generally, any model where the is a shift term that is the square of a time period value (start time, end time, duration).

                          Trip and tour start and end times are stored as int8 in the various tables where they appear. By extension, durations also may be int8. This seems superficially fine, as the most ambitious model probably won't have less than 15 minute time periods, so the max number of periods in a day would by 96, less than the max int8 value of 127.

                          BUT: If you write an expression in a spec file doing math with time periods, AND if that expression might overflow the int8 e.g. by squaring, AND if you don't explicitly upcast the to a more appropriate dtype, THEN the math can overflow and wrap around. We observe this if we take the square of an int8 array of time period values:

                          >>> pd.Series(np.arange(24), dtype=np.int8) ** 2
                          0 0
                          1 1
                          2 4
                          3 9
                          4 16
                          5 25
                          6 36
                          7 49
                          8 64
                          9 81
                          10 100
                          11 121
                          12 -112
                          13 -87
                          14 -60
                          15 -31
                          16 0
                          17 33
                          18 68
                          19 105
                          20 -112
                          21 -71
                          22 -28
                          23 17
                          dtype: int8
                          

                          The consequences of this math error may wash out if associated coefficients are zero, or if the squared values are always 11 or less by construction or coincidence, or potentially for other reasons. Some study will be required to determine if that is the case, but my preliminary guess is that it does not wash out at least sometimes, based on discovering this through anomalies between sharrow-with-time-windows and legacy code on the prototype MWCOG model.

                          Based on a cursory review of model spec files in our repository, I observe that scheduling for joint and non-mandatory tours may be affected in these models:

                          • ARC
                          • MWCOG
                          • SEMCOG
                          • anyone using one of these models as a donor (probably CMAP, Met Council)

                          cc: @guyrousseau@JilanChen@mmoran3@ray-ngo@jfdman@i-am-sijia

                          Metadata

                          Metadata

                          Assignees

                          No one assigned

                            Labels

                            No labels
                            No labels

                            Type

                            No type

                            Projects

                            No projects

                              Milestone

                              No milestone

                              Relationships

                              None yet

                              Development

                              No branches or pull requests

                              Issue actions

                              , 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Universal Dark Mode - works on any site\n(function() {\n var enabled = true;\n \n function applyDarkMode() {\n if (!enabled) return;\n \n // Create style element if it doesn't exist\n var style = document.getElementById('universal-dark-mode-style');\n if (!style) {\n style = document.createElement('style');\n style.id = 'universal-dark-mode-style';\n document.head.appendChild(style);\n }\n \n // Dark mode CSS - inverts colors but preserves images/video\n style.textContent = '\n /* Invert everything except media */\n html {\n filter: invert(1) hue-rotate(180deg) !important;\n background: #1a1a2e !important;\n }\n \n /* Restore images, videos, iframes, canvas */\n img, video, iframe, canvas, svg, picture, [style*=\"background-image\"] {\n filter: invert(1) hue-rotate(180deg) !important;\n }\n \n /* Preserve specific elements that should not be inverted */\n .no-dark-mode, .no-dark-mode *,\n [data-theme=\"light\"], [data-theme=\"light\"],\n .ace_editor, .ace_editor *,\n .CodeMirror, .CodeMirror *,\n .monaco-editor, .monaco-editor *,\n .markdown-body pre, .markdown-body pre *,\n .highlight, .highlight *,\n pre code, pre code * {\n filter: none !important;\n }\n \n /* Fix common UI elements */\n .modal, .popup, .dropdown-menu, .tooltip, .popover {\n filter: invert(1) hue-rotate(180deg) !important;\n background: #2d2d44 !important;\n border-color: #444 !important;\n }\n \n /* Scrollbars */\n ::-webkit-scrollbar { background: #1a1a2e !important; }\n ::-webkit-scrollbar-thumb { background: #444 !important; }\n ::-webkit-scrollbar-thumb:hover { background: #555 !important; }\n \n /* Selection */\n ::selection { background: #4ecdc4 !important; color: #1a1a2e !important; }\n ::-moz-selection { background: #4ecdc4 !important; color: #1a1a2e !important; }\n ';\n }\n \n function removeDarkMode() {\n var style = document.getElementById('universal-dark-mode-style');\n if (style) style.remove();\n }\n \n // Toggle with Alt+Shift+D\n document.addEventListener('keydown', function(e) {\n if (e.altKey && e.shiftKey && e.key === 'D') {\n e.preventDefault();\n enabled = !enabled;\n if (enabled) {\n applyDarkMode();\n console.log('[Universal Dark Mode] Enabled');\n } else {\n removeDarkMode();\n console.log('[Universal Dark Mode] Disabled');\n }\n }\n });\n \n // Apply on load\n applyDarkMode();\n \n // Re-apply on dynamic content\n var observer = new MutationObserver(function(mutations) {\n if (enabled && !document.getElementById('universal-dark-mode-style')) {\n applyDarkMode();\n }\n });\n observer.observe(document.head, { childList: true });\n \n console.log('[Universal Dark Mode] Loaded - Press Alt+Shift+D to toggle');\n})();", "Universal Dark Mode"); } } catch(__e) { console.warn('[Userscript:Universal Dark Mode]', __e); } })(); })();
                              Skip to content

                              ❗ Possible math error in some scheduling models #605

                              Description

                              @jpn--

                              There may be a hidden math error in some scheduling models: generally, any model where the is a shift term that is the square of a time period value (start time, end time, duration).

                              Trip and tour start and end times are stored as int8 in the various tables where they appear. By extension, durations also may be int8. This seems superficially fine, as the most ambitious model probably won't have less than 15 minute time periods, so the max number of periods in a day would by 96, less than the max int8 value of 127.

                              BUT: If you write an expression in a spec file doing math with time periods, AND if that expression might overflow the int8 e.g. by squaring, AND if you don't explicitly upcast the to a more appropriate dtype, THEN the math can overflow and wrap around. We observe this if we take the square of an int8 array of time period values:

                              >>> pd.Series(np.arange(24), dtype=np.int8) ** 2
                              0 0
                              1 1
                              2 4
                              3 9
                              4 16
                              5 25
                              6 36
                              7 49
                              8 64
                              9 81
                              10 100
                              11 121
                              12 -112
                              13 -87
                              14 -60
                              15 -31
                              16 0
                              17 33
                              18 68
                              19 105
                              20 -112
                              21 -71
                              22 -28
                              23 17
                              dtype: int8
                              

                              The consequences of this math error may wash out if associated coefficients are zero, or if the squared values are always 11 or less by construction or coincidence, or potentially for other reasons. Some study will be required to determine if that is the case, but my preliminary guess is that it does not wash out at least sometimes, based on discovering this through anomalies between sharrow-with-time-windows and legacy code on the prototype MWCOG model.

                              Based on a cursory review of model spec files in our repository, I observe that scheduling for joint and non-mandatory tours may be affected in these models:

                              • ARC
                              • MWCOG
                              • SEMCOG
                              • anyone using one of these models as a donor (probably CMAP, Met Council)

                              cc: @guyrousseau@JilanChen@mmoran3@ray-ngo@jfdman@i-am-sijia

                              Metadata

                              Metadata

                              Assignees

                              No one assigned

                                Labels

                                No labels
                                No labels

                                Type

                                No type

                                Projects

                                No projects

                                  Milestone

                                  No milestone

                                  Relationships

                                  None yet

                                  Development

                                  No branches or pull requests

                                  Issue actions