Skip to content

chore(deploy): promote prod prism pin for G8 µP probe base - #156

Merged
echobt merged 1 commit into
mainfrom
chore/prod-pins-prism-g8-5d44ea63
Aug 15, 2026
Merged

chore(deploy): promote prod prism pin for G8 µP probe base#156
echobt merged 1 commit into
mainfrom
chore/prod-pins-prism-g8-5d44ea63

Conversation

@echobt

@echobtechobt commented Aug 15, 2026

Copy link
Copy Markdown
Contributor

Summary

  • Promote prism-challenge prod pin to digest sha256:3fb469f990ca… from merge #155 (5d44ea63)
  • Unblocks miners: G8 µP sweep uses reduced probe base (no universal org.g8.mup_lr_stability=0.0 from OOM geometry)

Test plan

  • Pin ladder: staging digest matches
  • resume-first prism-only recreate on prod master (no Lium kill; skip full remote-deploy if updater→validator breaks)
  • Confirm prism healthz + seals intact

Summary by CodeRabbit

  • Chores
    • Updated production deployment metadata to reference the latest application build.
    • Refreshed recorded container image versions and integrity details for production services.
    • Updated deployment timestamps.

Ship 5d44ea6 prism-challenge digest so µP LR-stability sweeps from the
reduced fixed probe geometry (no near-cap 4× OOM → universal 0.0).
@echobt
echobt merged commit 9713497 into mainAug 15, 2026
2 of 3 checks passed
@echobt
echobt deleted the chore/prod-pins-prism-g8-5d44ea63 branch August 15, 2026 02:46
@coderabbitai

coderabbitaiBot commented Aug 15, 2026

Copy link
Copy Markdown

Review Change Stack

Caution

Review failed

The pull request is closed.

ℹ️ Recent review info
⚙️ Run configuration

Configuration used: defaults

Review profile: CHILL

Plan: Pro Plus

Run ID: b46bf362-cda4-4bbb-b837-1597cf218a88

📥 Commits

Reviewing files that changed from the base of the PR and between 76af32b and 1c2d4a0.

📒 Files selected for processing (1)
  • deploy/pins/prod.json

📝 Walkthrough

Walkthrough

Production pin metadata was updated in deploy/pins/prod.json. The current and previous commit SHAs, prism-challenge image digests and references, and deployment timestamps changed.

Changes

Production pin refresh

Layer / File(s)Summary
Update production pin metadata
deploy/pins/prod.json
The current and previous production records now contain updated commit SHAs, prism-challenge image digests and references, and deployment timestamps.

Estimated code review effort: 1 (Trivial) | ~3 minutes

Possibly related PRs

✨ Finishing Touches
🧪 Generate unit tests (beta)
  • Create PR with unit tests
  • Commit unit tests in branch chore/prod-pins-prism-g8-5d44ea63

Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

❤️ Share

Comment @coderabbitai help to get the list of available commands.

Sign up for freeto join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant

@echobt