Best Widget Ever also known as: BWE

Best Widget Ever, a product development template.
Template for documentation to help beginners when developing a project / product.

Project plan for BWE

File version control with GitHub Project management with GitHub project features, issues, milestones, issue templates.

Explanation of These Folders:

  • HR, holds human resources information for the company which makes the BWE. Mix of public and private files.
  • assembly, holds the folders and files for assembly of the produced.
  • firmware, holds firmware for BWE
  • legal, holds documents requiring legal skills for management. Corporate documents, patent related information for the company which makes the BWE. Mix of public and private files.
  • marketing and sales, holds the marketing plans and history, Sales documents. Mix of public and private files.
  • parts, holds specifications for all parts for PCB and enclosure etc. This folder has subfolders and a simple "Parts Master" spreadsheet.
  • The subfolder, "pcb" holds the schematic and PCB design files and the files generated from them.
  • testing, holds the product qualification test procedure and testing specifications and the factory test procedures for BWE.

This project milestones

From start of design to first production.

  • Write and maintain both Functional Specifications and Technical Specifications. See reference below.
  • Product Functional Specification Released.
  • Proof of concept, sketches, drawings, Mockups, bread boards and wishful thinking.
  • Schematics and drawings for all parts in folders, electrical and mechanical.
  • Test points for manufacturing / troubleshooting especially for power.
  • Update parts master to assign Part Numbers
  • Schematic release V0.0.1 for initial review
  • Review for manufacturing, testing, loading firmware, EMC, ESD, signal integrity, power distribution, safety, maximum temperature, etc...
  • Update Schematic release V0.0.2 etc...
  • Setup PCB software or train self for PCB manufacturing design rules.
  • Schematic approved for start of PCB layout V0.1.xx Passes schematic design rules check.
  • Assign and place PCB part number on PCB silk screen.
  • Assign and place PCB version number on PCB silk screen.
  • Place on the PCB silk screen a location for Serial Number to be applied at start of manufacture.
  • Place on the PCB silk screen a logo.
  • Place on the PCB silk screen a license or statement of copy write.
  • Add "tooling holes" for PCB manufacturer.
  • If necessary, add rails for PWA manufacturing.
  • Enclosure design review. (Make cardboard Mockup, Cable Mockup. PCB Mockup.) Make sure of clearance around all mounting hardware for screw / nut drivers.
  • Enclosure design freeze for prototype PCB. PCB outline and connector placement freeze.
  • PCB outline import parts and make and connector placement. Make Mockup for fit to enclosure
  • Milestone: PCB mechanical fit test, (PCB Mockup with connector fits enclosure with cables etc...)
  • Component placement for optimum routing and heat and Electromagnetic compatibility. Then route.
  • Connect through hole component traces to "teardrop" pads for strength. Route so that traces can be inspected (Not under connectors for example).
  • PCB passes DRC (Design rules check).
  • Review of Gerbers and other files by fabricator of PCB against design rules.
  • Inventory and order parts including PCB and stencils.
  • Make CAD files (STEP or other) of PCB and Enclosure and test fit in an assembly. Review and specify any required changes.
  • Build Prototype Enclosure and printed wiring assembly(s)
  • Assemble first unit(s) and engineering and compliance (Safety, EMC, other) test.
  • Engineering revise and release for rest of Prototype Run. Update of engineering, sales, legal documentation with photographs measurements of real hardware.
  • Firmware code review and release.
  • Factory Test in place.
  • Changes and repeat all the above for Pilot Run (First sellable units with serial numbers etc.).

Deliverables for This Project

This product development project is done with the completion of the following deliverables.

  • Final Functional Specifications and Technical Specifications.
  • Product and marketing plant
  • Product sales and marketing literature
    • Product pilot run (ready for production)
  • Quality Test Procedures
  • Manufacturing Test Procedure
  • Bill of Material for finished goods as packaged for sale
  • Bills of material sub assemblies
  • Troubleshooting reference materials and procedures, theory of operation.

Reference Documentation

About

Best Widget Ever, a product development template.

Resources

Stars

0 stars

Watchers

1 watching

Forks

Releases

Packages

Contributors

, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Add copy buttons to all
 blocks\n(function() {\n function addCopyButtons() {\n document.querySelectorAll('pre code').forEach(function(codeBlock) {\n if (codeBlock.parentElement.hasAttribute('data-copy-added')) return;\n codeBlock.parentElement.setAttribute('data-copy-added', 'true');\n \n var btn = document.createElement('button');\n btn.textContent = 'Copy';\n btn.style.cssText = 'position:absolute;top:4px;right:4px;padding:2px 8px;font-size:11px;background:#4ecdc4;border:none;border-radius:4px;color:#1a1a2e;cursor:pointer;opacity:0.7;transition:opacity 0.2s;';\n btn.onmouseover = function() { this.style.opacity = '1'; };\n btn.onmouseout = function() { this.style.opacity = '0.7'; };\n btn.onclick = function() {\n navigator.clipboard.writeText(codeBlock.textContent).then(function() {\n btn.textContent = 'Copied!';\n setTimeout(function() { btn.textContent = 'Copy'; }, 1500);\n });\n };\n codeBlock.parentElement.style.position = 'relative';\n codeBlock.parentElement.appendChild(btn);\n });\n }\n \n addCopyButtons();\n \n // Re-run on dynamic content\n var observer = new MutationObserver(addCopyButtons);\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "Add Copy Buttons to Code Blocks");
}
} catch(__e) { console.warn('[Userscript:Add Copy Buttons to Code Blocks]', __e); }
})();
(function(){
try {
var __m = "github.com";
var __re = new RegExp('^' + "github\\.com" + '
Skip to content

Repository files navigation

Best Widget Ever also known as: BWE

Best Widget Ever, a product development template.
Template for documentation to help beginners when developing a project / product.

Project plan for BWE

File version control with GitHub Project management with GitHub project features, issues, milestones, issue templates.

Explanation of These Folders:

  • HR, holds human resources information for the company which makes the BWE. Mix of public and private files.
  • assembly, holds the folders and files for assembly of the produced.
  • firmware, holds firmware for BWE
  • legal, holds documents requiring legal skills for management. Corporate documents, patent related information for the company which makes the BWE. Mix of public and private files.
  • marketing and sales, holds the marketing plans and history, Sales documents. Mix of public and private files.
  • parts, holds specifications for all parts for PCB and enclosure etc. This folder has subfolders and a simple "Parts Master" spreadsheet.
  • The subfolder, "pcb" holds the schematic and PCB design files and the files generated from them.
  • testing, holds the product qualification test procedure and testing specifications and the factory test procedures for BWE.

This project milestones

From start of design to first production.

  • Write and maintain both Functional Specifications and Technical Specifications. See reference below.
  • Product Functional Specification Released.
  • Proof of concept, sketches, drawings, Mockups, bread boards and wishful thinking.
  • Schematics and drawings for all parts in folders, electrical and mechanical.
  • Test points for manufacturing / troubleshooting especially for power.
  • Update parts master to assign Part Numbers
  • Schematic release V0.0.1 for initial review
  • Review for manufacturing, testing, loading firmware, EMC, ESD, signal integrity, power distribution, safety, maximum temperature, etc...
  • Update Schematic release V0.0.2 etc...
  • Setup PCB software or train self for PCB manufacturing design rules.
  • Schematic approved for start of PCB layout V0.1.xx Passes schematic design rules check.
  • Assign and place PCB part number on PCB silk screen.
  • Assign and place PCB version number on PCB silk screen.
  • Place on the PCB silk screen a location for Serial Number to be applied at start of manufacture.
  • Place on the PCB silk screen a logo.
  • Place on the PCB silk screen a license or statement of copy write.
  • Add "tooling holes" for PCB manufacturer.
  • If necessary, add rails for PWA manufacturing.
  • Enclosure design review. (Make cardboard Mockup, Cable Mockup. PCB Mockup.) Make sure of clearance around all mounting hardware for screw / nut drivers.
  • Enclosure design freeze for prototype PCB. PCB outline and connector placement freeze.
  • PCB outline import parts and make and connector placement. Make Mockup for fit to enclosure
  • Milestone: PCB mechanical fit test, (PCB Mockup with connector fits enclosure with cables etc...)
  • Component placement for optimum routing and heat and Electromagnetic compatibility. Then route.
  • Connect through hole component traces to "teardrop" pads for strength. Route so that traces can be inspected (Not under connectors for example).
  • PCB passes DRC (Design rules check).
  • Review of Gerbers and other files by fabricator of PCB against design rules.
  • Inventory and order parts including PCB and stencils.
  • Make CAD files (STEP or other) of PCB and Enclosure and test fit in an assembly. Review and specify any required changes.
  • Build Prototype Enclosure and printed wiring assembly(s)
  • Assemble first unit(s) and engineering and compliance (Safety, EMC, other) test.
  • Engineering revise and release for rest of Prototype Run. Update of engineering, sales, legal documentation with photographs measurements of real hardware.
  • Firmware code review and release.
  • Factory Test in place.
  • Changes and repeat all the above for Pilot Run (First sellable units with serial numbers etc.).

Deliverables for This Project

This product development project is done with the completion of the following deliverables.

  • Final Functional Specifications and Technical Specifications.
  • Product and marketing plant
  • Product sales and marketing literature
    • Product pilot run (ready for production)
  • Quality Test Procedures
  • Manufacturing Test Procedure
  • Bill of Material for finished goods as packaged for sale
  • Bills of material sub assemblies
  • Troubleshooting reference materials and procedures, theory of operation.

Reference Documentation

About

Best Widget Ever, a product development template.

Resources

Stars

0 stars

Watchers

1 watching

Forks

Releases

Packages

Contributors

, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Force GitHub README to respect dark mode\n(function() {\n var style = document.createElement('style');\n style.textContent = '\n .markdown-body {\n color-scheme: dark light;\n }\n .markdown-body pre { background: #161b22 !important; }\n .markdown-body code { background: rgba(110, 118, 129, 0.4) !important; }\n .markdown-body table th, .markdown-body table td { border-color: #30363d !important; }\n .markdown-body img { background: #0d1117; }\n .markdown-body blockquote { border-left-color: #8b949e; }\n .markdown-body hr { border-color: #30363d; }\n ';\n document.head.appendChild(style);\n})();", "GitHub Dark Mode README Fix"); } } catch(__e) { console.warn('[Userscript:GitHub Dark Mode README Fix]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
Skip to content

Repository files navigation

Best Widget Ever also known as: BWE

Best Widget Ever, a product development template.
Template for documentation to help beginners when developing a project / product.

Project plan for BWE

File version control with GitHub Project management with GitHub project features, issues, milestones, issue templates.

Explanation of These Folders:

  • HR, holds human resources information for the company which makes the BWE. Mix of public and private files.
  • assembly, holds the folders and files for assembly of the produced.
  • firmware, holds firmware for BWE
  • legal, holds documents requiring legal skills for management. Corporate documents, patent related information for the company which makes the BWE. Mix of public and private files.
  • marketing and sales, holds the marketing plans and history, Sales documents. Mix of public and private files.
  • parts, holds specifications for all parts for PCB and enclosure etc. This folder has subfolders and a simple "Parts Master" spreadsheet.
  • The subfolder, "pcb" holds the schematic and PCB design files and the files generated from them.
  • testing, holds the product qualification test procedure and testing specifications and the factory test procedures for BWE.

This project milestones

From start of design to first production.

  • Write and maintain both Functional Specifications and Technical Specifications. See reference below.
  • Product Functional Specification Released.
  • Proof of concept, sketches, drawings, Mockups, bread boards and wishful thinking.
  • Schematics and drawings for all parts in folders, electrical and mechanical.
  • Test points for manufacturing / troubleshooting especially for power.
  • Update parts master to assign Part Numbers
  • Schematic release V0.0.1 for initial review
  • Review for manufacturing, testing, loading firmware, EMC, ESD, signal integrity, power distribution, safety, maximum temperature, etc...
  • Update Schematic release V0.0.2 etc...
  • Setup PCB software or train self for PCB manufacturing design rules.
  • Schematic approved for start of PCB layout V0.1.xx Passes schematic design rules check.
  • Assign and place PCB part number on PCB silk screen.
  • Assign and place PCB version number on PCB silk screen.
  • Place on the PCB silk screen a location for Serial Number to be applied at start of manufacture.
  • Place on the PCB silk screen a logo.
  • Place on the PCB silk screen a license or statement of copy write.
  • Add "tooling holes" for PCB manufacturer.
  • If necessary, add rails for PWA manufacturing.
  • Enclosure design review. (Make cardboard Mockup, Cable Mockup. PCB Mockup.) Make sure of clearance around all mounting hardware for screw / nut drivers.
  • Enclosure design freeze for prototype PCB. PCB outline and connector placement freeze.
  • PCB outline import parts and make and connector placement. Make Mockup for fit to enclosure
  • Milestone: PCB mechanical fit test, (PCB Mockup with connector fits enclosure with cables etc...)
  • Component placement for optimum routing and heat and Electromagnetic compatibility. Then route.
  • Connect through hole component traces to "teardrop" pads for strength. Route so that traces can be inspected (Not under connectors for example).
  • PCB passes DRC (Design rules check).
  • Review of Gerbers and other files by fabricator of PCB against design rules.
  • Inventory and order parts including PCB and stencils.
  • Make CAD files (STEP or other) of PCB and Enclosure and test fit in an assembly. Review and specify any required changes.
  • Build Prototype Enclosure and printed wiring assembly(s)
  • Assemble first unit(s) and engineering and compliance (Safety, EMC, other) test.
  • Engineering revise and release for rest of Prototype Run. Update of engineering, sales, legal documentation with photographs measurements of real hardware.
  • Firmware code review and release.
  • Factory Test in place.
  • Changes and repeat all the above for Pilot Run (First sellable units with serial numbers etc.).

Deliverables for This Project

This product development project is done with the completion of the following deliverables.

  • Final Functional Specifications and Technical Specifications.
  • Product and marketing plant
  • Product sales and marketing literature
    • Product pilot run (ready for production)
  • Quality Test Procedures
  • Manufacturing Test Procedure
  • Bill of Material for finished goods as packaged for sale
  • Bills of material sub assemblies
  • Troubleshooting reference materials and procedures, theory of operation.

Reference Documentation

About

Best Widget Ever, a product development template.

Resources

Stars

0 stars

Watchers

1 watching

Forks

Releases

Packages

Contributors

, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Highlight search terms from Google/DuckDuckGo/Bing referrer\n(function() {\n var ref = document.referrer;\n var terms = [];\n \n if (ref.includes('google.com') || ref.includes('duckduckgo.com') || ref.includes('bing.com')) {\n var url = new URL(ref);\n var q = url.searchParams.get('q') || url.searchParams.get('p');\n if (q) {\n terms = q.split(/\\s+/).filter(function(t) { return t.length > 2; });\n }\n }\n \n if (terms.length === 0) return;\n \n var style = document.createElement('style');\n style.textContent = '.userscript-highlight { background: #fbbf24; color: #1a1a2e; padding: 1px 3px; border-radius: 2px; }';\n document.head.appendChild(style);\n \n function highlight(node) {\n if (node.nodeType === 3) { // text node\n var text = node.textContent;\n var found = false;\n terms.forEach(function(term) {\n var regex = new RegExp('(' + term.replace(/[.*+?^${}()|[\\]\\\\]/g, '\\\\') + ')', 'gi');\n if (regex.test(text)) {\n found = true;\n var frag = document.createDocumentFragment();\n var parts = text.split(regex);\n parts.forEach(function(part, i) {\n if (i % 2 === 0) {\n frag.appendChild(document.createTextNode(part));\n } else {\n var span = document.createElement('span');\n span.className = 'userscript-highlight';\n span.textContent = part;\n frag.appendChild(span);\n }\n });\n node.parentNode.replaceChild(frag, node);\n }\n });\n } else if (node.nodeType === 1 && node.childNodes) { // element\n var skipTags = ['SCRIPT', 'STYLE', 'NOSCRIPT', 'TEXTAREA', 'INPUT', 'SELECT'];\n if (!skipTags.includes(node.tagName)) {\n Array.from(node.childNodes).forEach(highlight);\n }\n }\n }\n \n highlight(document.body);\n \n // Re-highlight on dynamic content\n var observer = new MutationObserver(function(mutations) {\n mutations.forEach(function(m) {\n m.addedNodes.forEach(function(node) {\n if (node.nodeType === 1 || node.nodeType === 3) highlight(node);\n });\n });\n });\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "Highlight Search Terms"); } } catch(__e) { console.warn('[Userscript:Highlight Search Terms]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
Skip to content

Repository files navigation

Best Widget Ever also known as: BWE

Best Widget Ever, a product development template.
Template for documentation to help beginners when developing a project / product.

Project plan for BWE

File version control with GitHub Project management with GitHub project features, issues, milestones, issue templates.

Explanation of These Folders:

  • HR, holds human resources information for the company which makes the BWE. Mix of public and private files.
  • assembly, holds the folders and files for assembly of the produced.
  • firmware, holds firmware for BWE
  • legal, holds documents requiring legal skills for management. Corporate documents, patent related information for the company which makes the BWE. Mix of public and private files.
  • marketing and sales, holds the marketing plans and history, Sales documents. Mix of public and private files.
  • parts, holds specifications for all parts for PCB and enclosure etc. This folder has subfolders and a simple "Parts Master" spreadsheet.
  • The subfolder, "pcb" holds the schematic and PCB design files and the files generated from them.
  • testing, holds the product qualification test procedure and testing specifications and the factory test procedures for BWE.

This project milestones

From start of design to first production.

  • Write and maintain both Functional Specifications and Technical Specifications. See reference below.
  • Product Functional Specification Released.
  • Proof of concept, sketches, drawings, Mockups, bread boards and wishful thinking.
  • Schematics and drawings for all parts in folders, electrical and mechanical.
  • Test points for manufacturing / troubleshooting especially for power.
  • Update parts master to assign Part Numbers
  • Schematic release V0.0.1 for initial review
  • Review for manufacturing, testing, loading firmware, EMC, ESD, signal integrity, power distribution, safety, maximum temperature, etc...
  • Update Schematic release V0.0.2 etc...
  • Setup PCB software or train self for PCB manufacturing design rules.
  • Schematic approved for start of PCB layout V0.1.xx Passes schematic design rules check.
  • Assign and place PCB part number on PCB silk screen.
  • Assign and place PCB version number on PCB silk screen.
  • Place on the PCB silk screen a location for Serial Number to be applied at start of manufacture.
  • Place on the PCB silk screen a logo.
  • Place on the PCB silk screen a license or statement of copy write.
  • Add "tooling holes" for PCB manufacturer.
  • If necessary, add rails for PWA manufacturing.
  • Enclosure design review. (Make cardboard Mockup, Cable Mockup. PCB Mockup.) Make sure of clearance around all mounting hardware for screw / nut drivers.
  • Enclosure design freeze for prototype PCB. PCB outline and connector placement freeze.
  • PCB outline import parts and make and connector placement. Make Mockup for fit to enclosure
  • Milestone: PCB mechanical fit test, (PCB Mockup with connector fits enclosure with cables etc...)
  • Component placement for optimum routing and heat and Electromagnetic compatibility. Then route.
  • Connect through hole component traces to "teardrop" pads for strength. Route so that traces can be inspected (Not under connectors for example).
  • PCB passes DRC (Design rules check).
  • Review of Gerbers and other files by fabricator of PCB against design rules.
  • Inventory and order parts including PCB and stencils.
  • Make CAD files (STEP or other) of PCB and Enclosure and test fit in an assembly. Review and specify any required changes.
  • Build Prototype Enclosure and printed wiring assembly(s)
  • Assemble first unit(s) and engineering and compliance (Safety, EMC, other) test.
  • Engineering revise and release for rest of Prototype Run. Update of engineering, sales, legal documentation with photographs measurements of real hardware.
  • Firmware code review and release.
  • Factory Test in place.
  • Changes and repeat all the above for Pilot Run (First sellable units with serial numbers etc.).

Deliverables for This Project

This product development project is done with the completion of the following deliverables.

  • Final Functional Specifications and Technical Specifications.
  • Product and marketing plant
  • Product sales and marketing literature
    • Product pilot run (ready for production)
  • Quality Test Procedures
  • Manufacturing Test Procedure
  • Bill of Material for finished goods as packaged for sale
  • Bills of material sub assemblies
  • Troubleshooting reference materials and procedures, theory of operation.

Reference Documentation

About

Best Widget Ever, a product development template.

Resources

Stars

0 stars

Watchers

1 watching

Forks

Releases

Packages

Contributors

, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Strip utm_, fbclid, gclid, etc. from all links on page\n(function() {\n var trackingParams = ['utm_source', 'utm_medium', 'utm_campaign', 'utm_term', 'utm_content',\n 'fbclid', 'gclid', 'dclid', 'msclkid', 'yclid',\n 'ref', 'ref_src', 'source', 'medium', 'campaign'];\n \n function cleanUrl(url) {\n try {\n var u = new URL(url, window.location.origin);\n var changed = false;\n trackingParams.forEach(function(p) {\n if (u.searchParams.has(p)) {\n u.searchParams.delete(p);\n changed = true;\n }\n });\n return changed ? u.toString() : url;\n } catch (e) {\n return url;\n }\n }\n \n function cleanLinks() {\n document.querySelectorAll('a[href]').forEach(function(a) {\n var clean = cleanUrl(a.href);\n if (clean !== a.href) a.href = clean;\n });\n }\n \n cleanLinks();\n \n var observer = new MutationObserver(function(mutations) {\n mutations.forEach(function(m) {\n m.addedNodes.forEach(function(node) {\n if (node.nodeType === 1) {\n if (node.tagName === 'A') cleanLinks();\n node.querySelectorAll('a[href]').forEach(function(a) {\n var clean = cleanUrl(a.href);\n if (clean !== a.href) a.href = clean;\n });\n }\n });\n });\n });\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "Remove Tracking Parameters from Links"); } } catch(__e) { console.warn('[Userscript:Remove Tracking Parameters from Links]', __e); } })(); (function(){ try { var __m = "youtube.com"; var __re = new RegExp('^' + "youtube\\.com" + '
Skip to content

Repository files navigation

Best Widget Ever also known as: BWE

Best Widget Ever, a product development template.
Template for documentation to help beginners when developing a project / product.

Project plan for BWE

File version control with GitHub Project management with GitHub project features, issues, milestones, issue templates.

Explanation of These Folders:

  • HR, holds human resources information for the company which makes the BWE. Mix of public and private files.
  • assembly, holds the folders and files for assembly of the produced.
  • firmware, holds firmware for BWE
  • legal, holds documents requiring legal skills for management. Corporate documents, patent related information for the company which makes the BWE. Mix of public and private files.
  • marketing and sales, holds the marketing plans and history, Sales documents. Mix of public and private files.
  • parts, holds specifications for all parts for PCB and enclosure etc. This folder has subfolders and a simple "Parts Master" spreadsheet.
  • The subfolder, "pcb" holds the schematic and PCB design files and the files generated from them.
  • testing, holds the product qualification test procedure and testing specifications and the factory test procedures for BWE.

This project milestones

From start of design to first production.

  • Write and maintain both Functional Specifications and Technical Specifications. See reference below.
  • Product Functional Specification Released.
  • Proof of concept, sketches, drawings, Mockups, bread boards and wishful thinking.
  • Schematics and drawings for all parts in folders, electrical and mechanical.
  • Test points for manufacturing / troubleshooting especially for power.
  • Update parts master to assign Part Numbers
  • Schematic release V0.0.1 for initial review
  • Review for manufacturing, testing, loading firmware, EMC, ESD, signal integrity, power distribution, safety, maximum temperature, etc...
  • Update Schematic release V0.0.2 etc...
  • Setup PCB software or train self for PCB manufacturing design rules.
  • Schematic approved for start of PCB layout V0.1.xx Passes schematic design rules check.
  • Assign and place PCB part number on PCB silk screen.
  • Assign and place PCB version number on PCB silk screen.
  • Place on the PCB silk screen a location for Serial Number to be applied at start of manufacture.
  • Place on the PCB silk screen a logo.
  • Place on the PCB silk screen a license or statement of copy write.
  • Add "tooling holes" for PCB manufacturer.
  • If necessary, add rails for PWA manufacturing.
  • Enclosure design review. (Make cardboard Mockup, Cable Mockup. PCB Mockup.) Make sure of clearance around all mounting hardware for screw / nut drivers.
  • Enclosure design freeze for prototype PCB. PCB outline and connector placement freeze.
  • PCB outline import parts and make and connector placement. Make Mockup for fit to enclosure
  • Milestone: PCB mechanical fit test, (PCB Mockup with connector fits enclosure with cables etc...)
  • Component placement for optimum routing and heat and Electromagnetic compatibility. Then route.
  • Connect through hole component traces to "teardrop" pads for strength. Route so that traces can be inspected (Not under connectors for example).
  • PCB passes DRC (Design rules check).
  • Review of Gerbers and other files by fabricator of PCB against design rules.
  • Inventory and order parts including PCB and stencils.
  • Make CAD files (STEP or other) of PCB and Enclosure and test fit in an assembly. Review and specify any required changes.
  • Build Prototype Enclosure and printed wiring assembly(s)
  • Assemble first unit(s) and engineering and compliance (Safety, EMC, other) test.
  • Engineering revise and release for rest of Prototype Run. Update of engineering, sales, legal documentation with photographs measurements of real hardware.
  • Firmware code review and release.
  • Factory Test in place.
  • Changes and repeat all the above for Pilot Run (First sellable units with serial numbers etc.).

Deliverables for This Project

This product development project is done with the completion of the following deliverables.

  • Final Functional Specifications and Technical Specifications.
  • Product and marketing plant
  • Product sales and marketing literature
    • Product pilot run (ready for production)
  • Quality Test Procedures
  • Manufacturing Test Procedure
  • Bill of Material for finished goods as packaged for sale
  • Bills of material sub assemblies
  • Troubleshooting reference materials and procedures, theory of operation.

Reference Documentation

About

Best Widget Ever, a product development template.

Resources

Stars

0 stars

Watchers

1 watching

Forks

Releases

Packages

Contributors

, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Auto-enable theater mode on YouTube\n(function() {\n function tryTheater() {\n var btn = document.querySelector('button[aria-label=\"Theater mode\"], ytd-player #player button[title=\"Theater mode\"]');\n if (btn && !btn.classList.contains('activated')) {\n btn.click();\n }\n }\n \n // Try immediately\n tryTheater();\n \n // Try after navigation (SPA)\n var lastUrl = location.href;\n setInterval(function() {\n if (location.href !== lastUrl) {\n lastUrl = location.href;\n setTimeout(tryTheater, 500);\n }\n }, 1000);\n \n // Also try on player load\n var observer = new MutationObserver(tryTheater);\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "YouTube Theater Mode Default"); } } catch(__e) { console.warn('[Userscript:YouTube Theater Mode Default]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
Skip to content

Repository files navigation

Best Widget Ever also known as: BWE

Best Widget Ever, a product development template.
Template for documentation to help beginners when developing a project / product.

Project plan for BWE

File version control with GitHub Project management with GitHub project features, issues, milestones, issue templates.

Explanation of These Folders:

  • HR, holds human resources information for the company which makes the BWE. Mix of public and private files.
  • assembly, holds the folders and files for assembly of the produced.
  • firmware, holds firmware for BWE
  • legal, holds documents requiring legal skills for management. Corporate documents, patent related information for the company which makes the BWE. Mix of public and private files.
  • marketing and sales, holds the marketing plans and history, Sales documents. Mix of public and private files.
  • parts, holds specifications for all parts for PCB and enclosure etc. This folder has subfolders and a simple "Parts Master" spreadsheet.
  • The subfolder, "pcb" holds the schematic and PCB design files and the files generated from them.
  • testing, holds the product qualification test procedure and testing specifications and the factory test procedures for BWE.

This project milestones

From start of design to first production.

  • Write and maintain both Functional Specifications and Technical Specifications. See reference below.
  • Product Functional Specification Released.
  • Proof of concept, sketches, drawings, Mockups, bread boards and wishful thinking.
  • Schematics and drawings for all parts in folders, electrical and mechanical.
  • Test points for manufacturing / troubleshooting especially for power.
  • Update parts master to assign Part Numbers
  • Schematic release V0.0.1 for initial review
  • Review for manufacturing, testing, loading firmware, EMC, ESD, signal integrity, power distribution, safety, maximum temperature, etc...
  • Update Schematic release V0.0.2 etc...
  • Setup PCB software or train self for PCB manufacturing design rules.
  • Schematic approved for start of PCB layout V0.1.xx Passes schematic design rules check.
  • Assign and place PCB part number on PCB silk screen.
  • Assign and place PCB version number on PCB silk screen.
  • Place on the PCB silk screen a location for Serial Number to be applied at start of manufacture.
  • Place on the PCB silk screen a logo.
  • Place on the PCB silk screen a license or statement of copy write.
  • Add "tooling holes" for PCB manufacturer.
  • If necessary, add rails for PWA manufacturing.
  • Enclosure design review. (Make cardboard Mockup, Cable Mockup. PCB Mockup.) Make sure of clearance around all mounting hardware for screw / nut drivers.
  • Enclosure design freeze for prototype PCB. PCB outline and connector placement freeze.
  • PCB outline import parts and make and connector placement. Make Mockup for fit to enclosure
  • Milestone: PCB mechanical fit test, (PCB Mockup with connector fits enclosure with cables etc...)
  • Component placement for optimum routing and heat and Electromagnetic compatibility. Then route.
  • Connect through hole component traces to "teardrop" pads for strength. Route so that traces can be inspected (Not under connectors for example).
  • PCB passes DRC (Design rules check).
  • Review of Gerbers and other files by fabricator of PCB against design rules.
  • Inventory and order parts including PCB and stencils.
  • Make CAD files (STEP or other) of PCB and Enclosure and test fit in an assembly. Review and specify any required changes.
  • Build Prototype Enclosure and printed wiring assembly(s)
  • Assemble first unit(s) and engineering and compliance (Safety, EMC, other) test.
  • Engineering revise and release for rest of Prototype Run. Update of engineering, sales, legal documentation with photographs measurements of real hardware.
  • Firmware code review and release.
  • Factory Test in place.
  • Changes and repeat all the above for Pilot Run (First sellable units with serial numbers etc.).

Deliverables for This Project

This product development project is done with the completion of the following deliverables.

  • Final Functional Specifications and Technical Specifications.
  • Product and marketing plant
  • Product sales and marketing literature
    • Product pilot run (ready for production)
  • Quality Test Procedures
  • Manufacturing Test Procedure
  • Bill of Material for finished goods as packaged for sale
  • Bills of material sub assemblies
  • Troubleshooting reference materials and procedures, theory of operation.

Reference Documentation

About

Best Widget Ever, a product development template.

Resources

Stars

0 stars

Watchers

1 watching

Forks

Releases

Packages

Contributors

, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Remove or un-stick sticky/fixed headers that block content\n(function() {\n function unstick() {\n document.querySelectorAll('header, nav, [role=\"banner\"], .header, .navbar, .sticky, .fixed-top, [style*=\"position: fixed\"], [style*=\"position:sticky\"]').forEach(function(el) {\n if (el.style.position === 'fixed' || el.style.position === 'sticky' || \n getComputedStyle(el).position === 'fixed' || getComputedStyle(el).position === 'sticky') {\n el.style.position = 'static';\n el.style.top = 'auto';\n el.style.zIndex = 'auto';\n }\n });\n }\n \n unstick();\n \n var observer = new MutationObserver(unstick);\n observer.observe(document.body, { childList: true, subtree: true, attributes: true, attributeFilter: ['style', 'class'] });\n})();", "Kill Sticky Headers"); } } catch(__e) { console.warn('[Userscript:Kill Sticky Headers]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
Skip to content

Repository files navigation

Best Widget Ever also known as: BWE

Best Widget Ever, a product development template.
Template for documentation to help beginners when developing a project / product.

Project plan for BWE

File version control with GitHub Project management with GitHub project features, issues, milestones, issue templates.

Explanation of These Folders:

  • HR, holds human resources information for the company which makes the BWE. Mix of public and private files.
  • assembly, holds the folders and files for assembly of the produced.
  • firmware, holds firmware for BWE
  • legal, holds documents requiring legal skills for management. Corporate documents, patent related information for the company which makes the BWE. Mix of public and private files.
  • marketing and sales, holds the marketing plans and history, Sales documents. Mix of public and private files.
  • parts, holds specifications for all parts for PCB and enclosure etc. This folder has subfolders and a simple "Parts Master" spreadsheet.
  • The subfolder, "pcb" holds the schematic and PCB design files and the files generated from them.
  • testing, holds the product qualification test procedure and testing specifications and the factory test procedures for BWE.

This project milestones

From start of design to first production.

  • Write and maintain both Functional Specifications and Technical Specifications. See reference below.
  • Product Functional Specification Released.
  • Proof of concept, sketches, drawings, Mockups, bread boards and wishful thinking.
  • Schematics and drawings for all parts in folders, electrical and mechanical.
  • Test points for manufacturing / troubleshooting especially for power.
  • Update parts master to assign Part Numbers
  • Schematic release V0.0.1 for initial review
  • Review for manufacturing, testing, loading firmware, EMC, ESD, signal integrity, power distribution, safety, maximum temperature, etc...
  • Update Schematic release V0.0.2 etc...
  • Setup PCB software or train self for PCB manufacturing design rules.
  • Schematic approved for start of PCB layout V0.1.xx Passes schematic design rules check.
  • Assign and place PCB part number on PCB silk screen.
  • Assign and place PCB version number on PCB silk screen.
  • Place on the PCB silk screen a location for Serial Number to be applied at start of manufacture.
  • Place on the PCB silk screen a logo.
  • Place on the PCB silk screen a license or statement of copy write.
  • Add "tooling holes" for PCB manufacturer.
  • If necessary, add rails for PWA manufacturing.
  • Enclosure design review. (Make cardboard Mockup, Cable Mockup. PCB Mockup.) Make sure of clearance around all mounting hardware for screw / nut drivers.
  • Enclosure design freeze for prototype PCB. PCB outline and connector placement freeze.
  • PCB outline import parts and make and connector placement. Make Mockup for fit to enclosure
  • Milestone: PCB mechanical fit test, (PCB Mockup with connector fits enclosure with cables etc...)
  • Component placement for optimum routing and heat and Electromagnetic compatibility. Then route.
  • Connect through hole component traces to "teardrop" pads for strength. Route so that traces can be inspected (Not under connectors for example).
  • PCB passes DRC (Design rules check).
  • Review of Gerbers and other files by fabricator of PCB against design rules.
  • Inventory and order parts including PCB and stencils.
  • Make CAD files (STEP or other) of PCB and Enclosure and test fit in an assembly. Review and specify any required changes.
  • Build Prototype Enclosure and printed wiring assembly(s)
  • Assemble first unit(s) and engineering and compliance (Safety, EMC, other) test.
  • Engineering revise and release for rest of Prototype Run. Update of engineering, sales, legal documentation with photographs measurements of real hardware.
  • Firmware code review and release.
  • Factory Test in place.
  • Changes and repeat all the above for Pilot Run (First sellable units with serial numbers etc.).

Deliverables for This Project

This product development project is done with the completion of the following deliverables.

  • Final Functional Specifications and Technical Specifications.
  • Product and marketing plant
  • Product sales and marketing literature
    • Product pilot run (ready for production)
  • Quality Test Procedures
  • Manufacturing Test Procedure
  • Bill of Material for finished goods as packaged for sale
  • Bills of material sub assemblies
  • Troubleshooting reference materials and procedures, theory of operation.

Reference Documentation

About

Best Widget Ever, a product development template.

Resources

Stars

0 stars

Watchers

1 watching

Forks

Releases

Packages

Contributors

, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Universal Dark Mode - works on any site\n(function() {\n var enabled = true;\n \n function applyDarkMode() {\n if (!enabled) return;\n \n // Create style element if it doesn't exist\n var style = document.getElementById('universal-dark-mode-style');\n if (!style) {\n style = document.createElement('style');\n style.id = 'universal-dark-mode-style';\n document.head.appendChild(style);\n }\n \n // Dark mode CSS - inverts colors but preserves images/video\n style.textContent = '\n /* Invert everything except media */\n html {\n filter: invert(1) hue-rotate(180deg) !important;\n background: #1a1a2e !important;\n }\n \n /* Restore images, videos, iframes, canvas */\n img, video, iframe, canvas, svg, picture, [style*=\"background-image\"] {\n filter: invert(1) hue-rotate(180deg) !important;\n }\n \n /* Preserve specific elements that should not be inverted */\n .no-dark-mode, .no-dark-mode *,\n [data-theme=\"light\"], [data-theme=\"light\"],\n .ace_editor, .ace_editor *,\n .CodeMirror, .CodeMirror *,\n .monaco-editor, .monaco-editor *,\n .markdown-body pre, .markdown-body pre *,\n .highlight, .highlight *,\n pre code, pre code * {\n filter: none !important;\n }\n \n /* Fix common UI elements */\n .modal, .popup, .dropdown-menu, .tooltip, .popover {\n filter: invert(1) hue-rotate(180deg) !important;\n background: #2d2d44 !important;\n border-color: #444 !important;\n }\n \n /* Scrollbars */\n ::-webkit-scrollbar { background: #1a1a2e !important; }\n ::-webkit-scrollbar-thumb { background: #444 !important; }\n ::-webkit-scrollbar-thumb:hover { background: #555 !important; }\n \n /* Selection */\n ::selection { background: #4ecdc4 !important; color: #1a1a2e !important; }\n ::-moz-selection { background: #4ecdc4 !important; color: #1a1a2e !important; }\n ';\n }\n \n function removeDarkMode() {\n var style = document.getElementById('universal-dark-mode-style');\n if (style) style.remove();\n }\n \n // Toggle with Alt+Shift+D\n document.addEventListener('keydown', function(e) {\n if (e.altKey && e.shiftKey && e.key === 'D') {\n e.preventDefault();\n enabled = !enabled;\n if (enabled) {\n applyDarkMode();\n console.log('[Universal Dark Mode] Enabled');\n } else {\n removeDarkMode();\n console.log('[Universal Dark Mode] Disabled');\n }\n }\n });\n \n // Apply on load\n applyDarkMode();\n \n // Re-apply on dynamic content\n var observer = new MutationObserver(function(mutations) {\n if (enabled && !document.getElementById('universal-dark-mode-style')) {\n applyDarkMode();\n }\n });\n observer.observe(document.head, { childList: true });\n \n console.log('[Universal Dark Mode] Loaded - Press Alt+Shift+D to toggle');\n})();", "Universal Dark Mode"); } } catch(__e) { console.warn('[Userscript:Universal Dark Mode]', __e); } })(); })();
Skip to content

Repository files navigation

Best Widget Ever also known as: BWE

Best Widget Ever, a product development template.
Template for documentation to help beginners when developing a project / product.

Project plan for BWE

File version control with GitHub Project management with GitHub project features, issues, milestones, issue templates.

Explanation of These Folders:

  • HR, holds human resources information for the company which makes the BWE. Mix of public and private files.
  • assembly, holds the folders and files for assembly of the produced.
  • firmware, holds firmware for BWE
  • legal, holds documents requiring legal skills for management. Corporate documents, patent related information for the company which makes the BWE. Mix of public and private files.
  • marketing and sales, holds the marketing plans and history, Sales documents. Mix of public and private files.
  • parts, holds specifications for all parts for PCB and enclosure etc. This folder has subfolders and a simple "Parts Master" spreadsheet.
  • The subfolder, "pcb" holds the schematic and PCB design files and the files generated from them.
  • testing, holds the product qualification test procedure and testing specifications and the factory test procedures for BWE.

This project milestones

From start of design to first production.

  • Write and maintain both Functional Specifications and Technical Specifications. See reference below.
  • Product Functional Specification Released.
  • Proof of concept, sketches, drawings, Mockups, bread boards and wishful thinking.
  • Schematics and drawings for all parts in folders, electrical and mechanical.
  • Test points for manufacturing / troubleshooting especially for power.
  • Update parts master to assign Part Numbers
  • Schematic release V0.0.1 for initial review
  • Review for manufacturing, testing, loading firmware, EMC, ESD, signal integrity, power distribution, safety, maximum temperature, etc...
  • Update Schematic release V0.0.2 etc...
  • Setup PCB software or train self for PCB manufacturing design rules.
  • Schematic approved for start of PCB layout V0.1.xx Passes schematic design rules check.
  • Assign and place PCB part number on PCB silk screen.
  • Assign and place PCB version number on PCB silk screen.
  • Place on the PCB silk screen a location for Serial Number to be applied at start of manufacture.
  • Place on the PCB silk screen a logo.
  • Place on the PCB silk screen a license or statement of copy write.
  • Add "tooling holes" for PCB manufacturer.
  • If necessary, add rails for PWA manufacturing.
  • Enclosure design review. (Make cardboard Mockup, Cable Mockup. PCB Mockup.) Make sure of clearance around all mounting hardware for screw / nut drivers.
  • Enclosure design freeze for prototype PCB. PCB outline and connector placement freeze.
  • PCB outline import parts and make and connector placement. Make Mockup for fit to enclosure
  • Milestone: PCB mechanical fit test, (PCB Mockup with connector fits enclosure with cables etc...)
  • Component placement for optimum routing and heat and Electromagnetic compatibility. Then route.
  • Connect through hole component traces to "teardrop" pads for strength. Route so that traces can be inspected (Not under connectors for example).
  • PCB passes DRC (Design rules check).
  • Review of Gerbers and other files by fabricator of PCB against design rules.
  • Inventory and order parts including PCB and stencils.
  • Make CAD files (STEP or other) of PCB and Enclosure and test fit in an assembly. Review and specify any required changes.
  • Build Prototype Enclosure and printed wiring assembly(s)
  • Assemble first unit(s) and engineering and compliance (Safety, EMC, other) test.
  • Engineering revise and release for rest of Prototype Run. Update of engineering, sales, legal documentation with photographs measurements of real hardware.
  • Firmware code review and release.
  • Factory Test in place.
  • Changes and repeat all the above for Pilot Run (First sellable units with serial numbers etc.).

Deliverables for This Project

This product development project is done with the completion of the following deliverables.

  • Final Functional Specifications and Technical Specifications.
  • Product and marketing plant
  • Product sales and marketing literature
    • Product pilot run (ready for production)
  • Quality Test Procedures
  • Manufacturing Test Procedure
  • Bill of Material for finished goods as packaged for sale
  • Bills of material sub assemblies
  • Troubleshooting reference materials and procedures, theory of operation.

Reference Documentation

About

Best Widget Ever, a product development template.

Resources

Stars

0 stars

Watchers

1 watching

Forks

Releases

Packages

Contributors