Skip to content

docs: add physical connection map - #4

Merged
jmgilman merged 1 commit into
masterfrom
docs/physical-connections
Aug 15, 2026
Merged

docs: add physical connection map#4
jmgilman merged 1 commit into
masterfrom
docs/physical-connections

Conversation

@jmgilman

Copy link
Copy Markdown
Contributor

Summary

  • add an authoritative port-to-port map for all 18 installed cables
  • record the two explicitly unconnected ports
  • assign stable PHY connection identifiers without mixing in VLAN or interface configuration
  • make the physical map canonical from the hardware and design pages
  • add landing-page and site navigation

Verification

  • validated 18 cables, 36 unique connected endpoints, and 2 unconnected ports
  • built the documentation with MkDocs strict mode
  • browser-checked the rendered connection table and cross-document links

@jmgilman
jmgilman merged commit 5a75e64 into masterAug 15, 2026
2 checks passed
Sign up for freeto join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant

@jmgilman