merge queue: checking main (b1867aa) and [#2075 + #2049] together - #2076
mergify[bot] wants to merge 6 commits into
Conversation
Add a composition node that evaluates a then-node when an IDataEdge<bool> condition is true, and an optional else-node when it is false. Assisted-by: Cursor
Treat then_node like else_node: default to {} and skip evaluation when
the pointer is empty.
Assisted-by: Cursor
Build output/compile_memory_top10.json from metrics.build_profile.compile_memory_usage. Each commit keeps only its current top 10 files; a file that drops out is emitted as null so Plotly evicts that trace at that date.
|
Thanks @mergify[bot] for opening this PR! You can do multiple things directly here: Once the workflow completes a message will appear displaying informations related to the run. Also the PR gets automatically reviewed by gemini, you can: |
Workflow reportworkflow report corresponding to commit ec773c4 Pre-commit check reportPre-commit check: ✅ Test pipeline can run. Clang-tidy diff reportNo relevant changes found. You should now go back to your normal life and enjoy a hopefully sunny day while waiting for the review. Doxygen diff with
|
🕵️ This combination of pull requests has failed checks. Mergify will split this batch to understand which pull request is responsible for the failure. 🕵️
Branch main (b1867aa) and [#2075 + #2049] are queued together for merge.
This pull request has been created by Mergify to check the mergeability of [#2075 + #2049].
You don't need to do anything. Mergify will close this pull request automatically when it is complete.
Required conditions of queue rule
main queuefor merge:check-success = allRequired conditions to stay in the queue:
approved-reviews-by >= 1check-success = all_lightcheck-success = pre-commit.ci - pr