Skip to content

test(relay): gate 9 deterministic env-coupled test failures behind requires-Postgres ignore - #4356

Open
iroiro147 wants to merge 1 commit into
block:mainfrom
iroiro147:fix/main-lib-test-green
Open

iroiro147 wants to merge 1 commit into
block:mainfrom
iroiro147:fix/main-lib-test-green

test(relay): make cargo test -p buzz-relay --lib green without a sidecar

b036472
Select commit
Loading
Failed to load commit list.
Block DCO Check / DCO Check succeeded Aug 7, 2026 in 0s

All PR commits have appropriate sign-off

All commits in this PR have the appropriate sign-off. No further action is required

Details

all commits have the required DCO sign-off.