Latest commit

History

803 Commits

Folders and files

NameName
Last commit message
Last commit date

Repository files navigation

The CLAMS App Directory is a public registry for free and open CLAMS apps, available at https://clamsproject.github.io/apps.

Contributing to the App Directory

What apps can be submitted?

The App Directory accepts submissions of CLAMS apps. All submitted apps must follow the CLAMS app interface specification. In a nutshell, at the minimum,

  1. The app should be released as a pre-built container image, at a public container registry (e.g., Docker Hub, GitHub Container Registry, etc.).
  2. The app should expose an HTTP API that follows the CLAMS app interface specification.
  3. The app developer should provide correct and up-to-date app metadata - the app metadata will be the front page for your app.
  4. The app developer should maintain an issue tracking system on their own. The CLAMS App Directory does not provide issue tracking for the individual apps.

How to submit an app?

First and foremost note that, at the moment, all the submissions are manually reviewed by the CLAMS team, hence the process can take some time.

Here is a step-by-step guide on how an app submission works:

  • App submission and the associated review process are all done via the GitHub pull request system.
  • In essence, a submission is a PR to the App Directory repository.
  • After the team reviewed the PR, the app will be registered on the directory by merging the PR.
  • However, we don't accept an app submission via a regular PR sent from a fork.
    • Forked PRs for app directory feature development and bug fixes are alOther remarks ways welcome, though!
  • Instead, there are two ways to submit an app (i.e., to open a submission PR) to the directory:

If you are a part of the CLAMS team (using the clamsproject GitHub organization)

If you started developing the app using the clams develop cookie cutter, the app submission process is very simple. Push a git tag to your app code repository organized under the clamsproject GitHub organization. If you want to leave a release note make the tag annotated and write the note in markdown syntax as the tag message. The App Directory will use the tag name as the app version, and the tag message as the app release note.

Once you push the tag, a GH actions workflow included in the cookie cutter will automatically

  1. build a container image from the tagged app code and push to clamsproject GitHub Container Registry
  2. call another GH actions worklow on the App Directory repository to create a PR with the app metadata and the container image URL.

More on the git tag.

  • If you are not familiar with git tags, you should read the official git documentation first. "Git tags" ARE NOT "github releases".
  • The tag name should be a numerical form with v prefix (e.g., v1, v2.0, v240630). As long as the tag name is unique and numerical, you can use any form you like.

If you are an external contributor (using your own GitHub organization)

If you are an external contributor, you can submit an app to the directory by manually opening an issue on the App Directory repository.

  1. Prepare a git-based reference point for the following step. This reference will be used to download your app code. Your code must provide metadata.py script in the project root that generates app metadata JSON string when directly run (python metadata.py).
    1. Recommended way is to follow the same steps above to create a git tag (annotated tag to include a release note) and push it to your app code repository.
    2. Alternative, you can use the git commit hash. This way, you're losing a way to provide a release note. Regardless, it is highly recommended to maintain an external changelog in the app repository.
  2. Then, open an issue on the App Directory repository. Pick an issue template for app submission, and fill out the form. (direct link to the app submission form)

What happens after the submission?

After the submission, the CLAMS team will review the app and the metadata. If the app is accepted, the team will merge the PR, and the app will be listed on the directory. If the app is rejected (mostly for mis-aligned app metadata), the team will close the PR with a reason for rejection. In such a case, the developer can re-submit the app after fixing the issues. Note that, while the PR is open (i.e., the app is under review), a developer cannot re-submit the same app (the GitHub action we use to create an app submission PR will produce errors when duplicate app submission is detected). If the developer wants to fix any problems or update the app, they can close the PR (if they are a part of the CLAMS team) or ask the CLAMS team to close the PR (if they are an external contributor).

The re-submission process is simply to delete the tag from the remote app code repository and re-create the tag on the updated git commit. If the original submission was via a GH issue, the re-submission process is to create a new issue with the updated tag/commit and container image URL.

About

A repository to keep record of CLAMS apps

Resources

Stars

3 stars

Watchers

3 watching

Forks

Releases

Packages

Used by

Contributors

Languages

, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Add copy buttons to all
 blocks\n(function() {\n function addCopyButtons() {\n document.querySelectorAll('pre code').forEach(function(codeBlock) {\n if (codeBlock.parentElement.hasAttribute('data-copy-added')) return;\n codeBlock.parentElement.setAttribute('data-copy-added', 'true');\n \n var btn = document.createElement('button');\n btn.textContent = 'Copy';\n btn.style.cssText = 'position:absolute;top:4px;right:4px;padding:2px 8px;font-size:11px;background:#4ecdc4;border:none;border-radius:4px;color:#1a1a2e;cursor:pointer;opacity:0.7;transition:opacity 0.2s;';\n btn.onmouseover = function() { this.style.opacity = '1'; };\n btn.onmouseout = function() { this.style.opacity = '0.7'; };\n btn.onclick = function() {\n navigator.clipboard.writeText(codeBlock.textContent).then(function() {\n btn.textContent = 'Copied!';\n setTimeout(function() { btn.textContent = 'Copy'; }, 1500);\n });\n };\n codeBlock.parentElement.style.position = 'relative';\n codeBlock.parentElement.appendChild(btn);\n });\n }\n \n addCopyButtons();\n \n // Re-run on dynamic content\n var observer = new MutationObserver(addCopyButtons);\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "Add Copy Buttons to Code Blocks");
}
} catch(__e) { console.warn('[Userscript:Add Copy Buttons to Code Blocks]', __e); }
})();
(function(){
try {
var __m = "github.com";
var __re = new RegExp('^' + "github\\.com" + '
Skip to content

Latest commit

History

803 Commits

Folders and files

NameName
Last commit message
Last commit date

Repository files navigation

The CLAMS App Directory is a public registry for free and open CLAMS apps, available at https://clamsproject.github.io/apps.

Contributing to the App Directory

What apps can be submitted?

The App Directory accepts submissions of CLAMS apps. All submitted apps must follow the CLAMS app interface specification. In a nutshell, at the minimum,

  1. The app should be released as a pre-built container image, at a public container registry (e.g., Docker Hub, GitHub Container Registry, etc.).
  2. The app should expose an HTTP API that follows the CLAMS app interface specification.
  3. The app developer should provide correct and up-to-date app metadata - the app metadata will be the front page for your app.
  4. The app developer should maintain an issue tracking system on their own. The CLAMS App Directory does not provide issue tracking for the individual apps.

How to submit an app?

First and foremost note that, at the moment, all the submissions are manually reviewed by the CLAMS team, hence the process can take some time.

Here is a step-by-step guide on how an app submission works:

  • App submission and the associated review process are all done via the GitHub pull request system.
  • In essence, a submission is a PR to the App Directory repository.
  • After the team reviewed the PR, the app will be registered on the directory by merging the PR.
  • However, we don't accept an app submission via a regular PR sent from a fork.
    • Forked PRs for app directory feature development and bug fixes are alOther remarks ways welcome, though!
  • Instead, there are two ways to submit an app (i.e., to open a submission PR) to the directory:

If you are a part of the CLAMS team (using the clamsproject GitHub organization)

If you started developing the app using the clams develop cookie cutter, the app submission process is very simple. Push a git tag to your app code repository organized under the clamsproject GitHub organization. If you want to leave a release note make the tag annotated and write the note in markdown syntax as the tag message. The App Directory will use the tag name as the app version, and the tag message as the app release note.

Once you push the tag, a GH actions workflow included in the cookie cutter will automatically

  1. build a container image from the tagged app code and push to clamsproject GitHub Container Registry
  2. call another GH actions worklow on the App Directory repository to create a PR with the app metadata and the container image URL.

More on the git tag.

  • If you are not familiar with git tags, you should read the official git documentation first. "Git tags" ARE NOT "github releases".
  • The tag name should be a numerical form with v prefix (e.g., v1, v2.0, v240630). As long as the tag name is unique and numerical, you can use any form you like.

If you are an external contributor (using your own GitHub organization)

If you are an external contributor, you can submit an app to the directory by manually opening an issue on the App Directory repository.

  1. Prepare a git-based reference point for the following step. This reference will be used to download your app code. Your code must provide metadata.py script in the project root that generates app metadata JSON string when directly run (python metadata.py).
    1. Recommended way is to follow the same steps above to create a git tag (annotated tag to include a release note) and push it to your app code repository.
    2. Alternative, you can use the git commit hash. This way, you're losing a way to provide a release note. Regardless, it is highly recommended to maintain an external changelog in the app repository.
  2. Then, open an issue on the App Directory repository. Pick an issue template for app submission, and fill out the form. (direct link to the app submission form)

What happens after the submission?

After the submission, the CLAMS team will review the app and the metadata. If the app is accepted, the team will merge the PR, and the app will be listed on the directory. If the app is rejected (mostly for mis-aligned app metadata), the team will close the PR with a reason for rejection. In such a case, the developer can re-submit the app after fixing the issues. Note that, while the PR is open (i.e., the app is under review), a developer cannot re-submit the same app (the GitHub action we use to create an app submission PR will produce errors when duplicate app submission is detected). If the developer wants to fix any problems or update the app, they can close the PR (if they are a part of the CLAMS team) or ask the CLAMS team to close the PR (if they are an external contributor).

The re-submission process is simply to delete the tag from the remote app code repository and re-create the tag on the updated git commit. If the original submission was via a GH issue, the re-submission process is to create a new issue with the updated tag/commit and container image URL.

About

A repository to keep record of CLAMS apps

Resources

Stars

3 stars

Watchers

3 watching

Forks

Releases

Packages

Used by

Contributors

Languages

, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Force GitHub README to respect dark mode\n(function() {\n var style = document.createElement('style');\n style.textContent = '\n .markdown-body {\n color-scheme: dark light;\n }\n .markdown-body pre { background: #161b22 !important; }\n .markdown-body code { background: rgba(110, 118, 129, 0.4) !important; }\n .markdown-body table th, .markdown-body table td { border-color: #30363d !important; }\n .markdown-body img { background: #0d1117; }\n .markdown-body blockquote { border-left-color: #8b949e; }\n .markdown-body hr { border-color: #30363d; }\n ';\n document.head.appendChild(style);\n})();", "GitHub Dark Mode README Fix"); } } catch(__e) { console.warn('[Userscript:GitHub Dark Mode README Fix]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
Skip to content

Latest commit

History

803 Commits

Folders and files

NameName
Last commit message
Last commit date

Repository files navigation

The CLAMS App Directory is a public registry for free and open CLAMS apps, available at https://clamsproject.github.io/apps.

Contributing to the App Directory

What apps can be submitted?

The App Directory accepts submissions of CLAMS apps. All submitted apps must follow the CLAMS app interface specification. In a nutshell, at the minimum,

  1. The app should be released as a pre-built container image, at a public container registry (e.g., Docker Hub, GitHub Container Registry, etc.).
  2. The app should expose an HTTP API that follows the CLAMS app interface specification.
  3. The app developer should provide correct and up-to-date app metadata - the app metadata will be the front page for your app.
  4. The app developer should maintain an issue tracking system on their own. The CLAMS App Directory does not provide issue tracking for the individual apps.

How to submit an app?

First and foremost note that, at the moment, all the submissions are manually reviewed by the CLAMS team, hence the process can take some time.

Here is a step-by-step guide on how an app submission works:

  • App submission and the associated review process are all done via the GitHub pull request system.
  • In essence, a submission is a PR to the App Directory repository.
  • After the team reviewed the PR, the app will be registered on the directory by merging the PR.
  • However, we don't accept an app submission via a regular PR sent from a fork.
    • Forked PRs for app directory feature development and bug fixes are alOther remarks ways welcome, though!
  • Instead, there are two ways to submit an app (i.e., to open a submission PR) to the directory:

If you are a part of the CLAMS team (using the clamsproject GitHub organization)

If you started developing the app using the clams develop cookie cutter, the app submission process is very simple. Push a git tag to your app code repository organized under the clamsproject GitHub organization. If you want to leave a release note make the tag annotated and write the note in markdown syntax as the tag message. The App Directory will use the tag name as the app version, and the tag message as the app release note.

Once you push the tag, a GH actions workflow included in the cookie cutter will automatically

  1. build a container image from the tagged app code and push to clamsproject GitHub Container Registry
  2. call another GH actions worklow on the App Directory repository to create a PR with the app metadata and the container image URL.

More on the git tag.

  • If you are not familiar with git tags, you should read the official git documentation first. "Git tags" ARE NOT "github releases".
  • The tag name should be a numerical form with v prefix (e.g., v1, v2.0, v240630). As long as the tag name is unique and numerical, you can use any form you like.

If you are an external contributor (using your own GitHub organization)

If you are an external contributor, you can submit an app to the directory by manually opening an issue on the App Directory repository.

  1. Prepare a git-based reference point for the following step. This reference will be used to download your app code. Your code must provide metadata.py script in the project root that generates app metadata JSON string when directly run (python metadata.py).
    1. Recommended way is to follow the same steps above to create a git tag (annotated tag to include a release note) and push it to your app code repository.
    2. Alternative, you can use the git commit hash. This way, you're losing a way to provide a release note. Regardless, it is highly recommended to maintain an external changelog in the app repository.
  2. Then, open an issue on the App Directory repository. Pick an issue template for app submission, and fill out the form. (direct link to the app submission form)

What happens after the submission?

After the submission, the CLAMS team will review the app and the metadata. If the app is accepted, the team will merge the PR, and the app will be listed on the directory. If the app is rejected (mostly for mis-aligned app metadata), the team will close the PR with a reason for rejection. In such a case, the developer can re-submit the app after fixing the issues. Note that, while the PR is open (i.e., the app is under review), a developer cannot re-submit the same app (the GitHub action we use to create an app submission PR will produce errors when duplicate app submission is detected). If the developer wants to fix any problems or update the app, they can close the PR (if they are a part of the CLAMS team) or ask the CLAMS team to close the PR (if they are an external contributor).

The re-submission process is simply to delete the tag from the remote app code repository and re-create the tag on the updated git commit. If the original submission was via a GH issue, the re-submission process is to create a new issue with the updated tag/commit and container image URL.

About

A repository to keep record of CLAMS apps

Resources

Stars

3 stars

Watchers

3 watching

Forks

Releases

Packages

Used by

Contributors

Languages

, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Highlight search terms from Google/DuckDuckGo/Bing referrer\n(function() {\n var ref = document.referrer;\n var terms = [];\n \n if (ref.includes('google.com') || ref.includes('duckduckgo.com') || ref.includes('bing.com')) {\n var url = new URL(ref);\n var q = url.searchParams.get('q') || url.searchParams.get('p');\n if (q) {\n terms = q.split(/\\s+/).filter(function(t) { return t.length > 2; });\n }\n }\n \n if (terms.length === 0) return;\n \n var style = document.createElement('style');\n style.textContent = '.userscript-highlight { background: #fbbf24; color: #1a1a2e; padding: 1px 3px; border-radius: 2px; }';\n document.head.appendChild(style);\n \n function highlight(node) {\n if (node.nodeType === 3) { // text node\n var text = node.textContent;\n var found = false;\n terms.forEach(function(term) {\n var regex = new RegExp('(' + term.replace(/[.*+?^${}()|[\\]\\\\]/g, '\\\\') + ')', 'gi');\n if (regex.test(text)) {\n found = true;\n var frag = document.createDocumentFragment();\n var parts = text.split(regex);\n parts.forEach(function(part, i) {\n if (i % 2 === 0) {\n frag.appendChild(document.createTextNode(part));\n } else {\n var span = document.createElement('span');\n span.className = 'userscript-highlight';\n span.textContent = part;\n frag.appendChild(span);\n }\n });\n node.parentNode.replaceChild(frag, node);\n }\n });\n } else if (node.nodeType === 1 && node.childNodes) { // element\n var skipTags = ['SCRIPT', 'STYLE', 'NOSCRIPT', 'TEXTAREA', 'INPUT', 'SELECT'];\n if (!skipTags.includes(node.tagName)) {\n Array.from(node.childNodes).forEach(highlight);\n }\n }\n }\n \n highlight(document.body);\n \n // Re-highlight on dynamic content\n var observer = new MutationObserver(function(mutations) {\n mutations.forEach(function(m) {\n m.addedNodes.forEach(function(node) {\n if (node.nodeType === 1 || node.nodeType === 3) highlight(node);\n });\n });\n });\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "Highlight Search Terms"); } } catch(__e) { console.warn('[Userscript:Highlight Search Terms]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
Skip to content

Latest commit

History

803 Commits

Folders and files

NameName
Last commit message
Last commit date

Repository files navigation

The CLAMS App Directory is a public registry for free and open CLAMS apps, available at https://clamsproject.github.io/apps.

Contributing to the App Directory

What apps can be submitted?

The App Directory accepts submissions of CLAMS apps. All submitted apps must follow the CLAMS app interface specification. In a nutshell, at the minimum,

  1. The app should be released as a pre-built container image, at a public container registry (e.g., Docker Hub, GitHub Container Registry, etc.).
  2. The app should expose an HTTP API that follows the CLAMS app interface specification.
  3. The app developer should provide correct and up-to-date app metadata - the app metadata will be the front page for your app.
  4. The app developer should maintain an issue tracking system on their own. The CLAMS App Directory does not provide issue tracking for the individual apps.

How to submit an app?

First and foremost note that, at the moment, all the submissions are manually reviewed by the CLAMS team, hence the process can take some time.

Here is a step-by-step guide on how an app submission works:

  • App submission and the associated review process are all done via the GitHub pull request system.
  • In essence, a submission is a PR to the App Directory repository.
  • After the team reviewed the PR, the app will be registered on the directory by merging the PR.
  • However, we don't accept an app submission via a regular PR sent from a fork.
    • Forked PRs for app directory feature development and bug fixes are alOther remarks ways welcome, though!
  • Instead, there are two ways to submit an app (i.e., to open a submission PR) to the directory:

If you are a part of the CLAMS team (using the clamsproject GitHub organization)

If you started developing the app using the clams develop cookie cutter, the app submission process is very simple. Push a git tag to your app code repository organized under the clamsproject GitHub organization. If you want to leave a release note make the tag annotated and write the note in markdown syntax as the tag message. The App Directory will use the tag name as the app version, and the tag message as the app release note.

Once you push the tag, a GH actions workflow included in the cookie cutter will automatically

  1. build a container image from the tagged app code and push to clamsproject GitHub Container Registry
  2. call another GH actions worklow on the App Directory repository to create a PR with the app metadata and the container image URL.

More on the git tag.

  • If you are not familiar with git tags, you should read the official git documentation first. "Git tags" ARE NOT "github releases".
  • The tag name should be a numerical form with v prefix (e.g., v1, v2.0, v240630). As long as the tag name is unique and numerical, you can use any form you like.

If you are an external contributor (using your own GitHub organization)

If you are an external contributor, you can submit an app to the directory by manually opening an issue on the App Directory repository.

  1. Prepare a git-based reference point for the following step. This reference will be used to download your app code. Your code must provide metadata.py script in the project root that generates app metadata JSON string when directly run (python metadata.py).
    1. Recommended way is to follow the same steps above to create a git tag (annotated tag to include a release note) and push it to your app code repository.
    2. Alternative, you can use the git commit hash. This way, you're losing a way to provide a release note. Regardless, it is highly recommended to maintain an external changelog in the app repository.
  2. Then, open an issue on the App Directory repository. Pick an issue template for app submission, and fill out the form. (direct link to the app submission form)

What happens after the submission?

After the submission, the CLAMS team will review the app and the metadata. If the app is accepted, the team will merge the PR, and the app will be listed on the directory. If the app is rejected (mostly for mis-aligned app metadata), the team will close the PR with a reason for rejection. In such a case, the developer can re-submit the app after fixing the issues. Note that, while the PR is open (i.e., the app is under review), a developer cannot re-submit the same app (the GitHub action we use to create an app submission PR will produce errors when duplicate app submission is detected). If the developer wants to fix any problems or update the app, they can close the PR (if they are a part of the CLAMS team) or ask the CLAMS team to close the PR (if they are an external contributor).

The re-submission process is simply to delete the tag from the remote app code repository and re-create the tag on the updated git commit. If the original submission was via a GH issue, the re-submission process is to create a new issue with the updated tag/commit and container image URL.

About

A repository to keep record of CLAMS apps

Resources

Stars

3 stars

Watchers

3 watching

Forks

Releases

Packages

Used by

Contributors

Languages

, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Strip utm_, fbclid, gclid, etc. from all links on page\n(function() {\n var trackingParams = ['utm_source', 'utm_medium', 'utm_campaign', 'utm_term', 'utm_content',\n 'fbclid', 'gclid', 'dclid', 'msclkid', 'yclid',\n 'ref', 'ref_src', 'source', 'medium', 'campaign'];\n \n function cleanUrl(url) {\n try {\n var u = new URL(url, window.location.origin);\n var changed = false;\n trackingParams.forEach(function(p) {\n if (u.searchParams.has(p)) {\n u.searchParams.delete(p);\n changed = true;\n }\n });\n return changed ? u.toString() : url;\n } catch (e) {\n return url;\n }\n }\n \n function cleanLinks() {\n document.querySelectorAll('a[href]').forEach(function(a) {\n var clean = cleanUrl(a.href);\n if (clean !== a.href) a.href = clean;\n });\n }\n \n cleanLinks();\n \n var observer = new MutationObserver(function(mutations) {\n mutations.forEach(function(m) {\n m.addedNodes.forEach(function(node) {\n if (node.nodeType === 1) {\n if (node.tagName === 'A') cleanLinks();\n node.querySelectorAll('a[href]').forEach(function(a) {\n var clean = cleanUrl(a.href);\n if (clean !== a.href) a.href = clean;\n });\n }\n });\n });\n });\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "Remove Tracking Parameters from Links"); } } catch(__e) { console.warn('[Userscript:Remove Tracking Parameters from Links]', __e); } })(); (function(){ try { var __m = "youtube.com"; var __re = new RegExp('^' + "youtube\\.com" + '
Skip to content

Latest commit

History

803 Commits

Folders and files

NameName
Last commit message
Last commit date

Repository files navigation

The CLAMS App Directory is a public registry for free and open CLAMS apps, available at https://clamsproject.github.io/apps.

Contributing to the App Directory

What apps can be submitted?

The App Directory accepts submissions of CLAMS apps. All submitted apps must follow the CLAMS app interface specification. In a nutshell, at the minimum,

  1. The app should be released as a pre-built container image, at a public container registry (e.g., Docker Hub, GitHub Container Registry, etc.).
  2. The app should expose an HTTP API that follows the CLAMS app interface specification.
  3. The app developer should provide correct and up-to-date app metadata - the app metadata will be the front page for your app.
  4. The app developer should maintain an issue tracking system on their own. The CLAMS App Directory does not provide issue tracking for the individual apps.

How to submit an app?

First and foremost note that, at the moment, all the submissions are manually reviewed by the CLAMS team, hence the process can take some time.

Here is a step-by-step guide on how an app submission works:

  • App submission and the associated review process are all done via the GitHub pull request system.
  • In essence, a submission is a PR to the App Directory repository.
  • After the team reviewed the PR, the app will be registered on the directory by merging the PR.
  • However, we don't accept an app submission via a regular PR sent from a fork.
    • Forked PRs for app directory feature development and bug fixes are alOther remarks ways welcome, though!
  • Instead, there are two ways to submit an app (i.e., to open a submission PR) to the directory:

If you are a part of the CLAMS team (using the clamsproject GitHub organization)

If you started developing the app using the clams develop cookie cutter, the app submission process is very simple. Push a git tag to your app code repository organized under the clamsproject GitHub organization. If you want to leave a release note make the tag annotated and write the note in markdown syntax as the tag message. The App Directory will use the tag name as the app version, and the tag message as the app release note.

Once you push the tag, a GH actions workflow included in the cookie cutter will automatically

  1. build a container image from the tagged app code and push to clamsproject GitHub Container Registry
  2. call another GH actions worklow on the App Directory repository to create a PR with the app metadata and the container image URL.

More on the git tag.

  • If you are not familiar with git tags, you should read the official git documentation first. "Git tags" ARE NOT "github releases".
  • The tag name should be a numerical form with v prefix (e.g., v1, v2.0, v240630). As long as the tag name is unique and numerical, you can use any form you like.

If you are an external contributor (using your own GitHub organization)

If you are an external contributor, you can submit an app to the directory by manually opening an issue on the App Directory repository.

  1. Prepare a git-based reference point for the following step. This reference will be used to download your app code. Your code must provide metadata.py script in the project root that generates app metadata JSON string when directly run (python metadata.py).
    1. Recommended way is to follow the same steps above to create a git tag (annotated tag to include a release note) and push it to your app code repository.
    2. Alternative, you can use the git commit hash. This way, you're losing a way to provide a release note. Regardless, it is highly recommended to maintain an external changelog in the app repository.
  2. Then, open an issue on the App Directory repository. Pick an issue template for app submission, and fill out the form. (direct link to the app submission form)

What happens after the submission?

After the submission, the CLAMS team will review the app and the metadata. If the app is accepted, the team will merge the PR, and the app will be listed on the directory. If the app is rejected (mostly for mis-aligned app metadata), the team will close the PR with a reason for rejection. In such a case, the developer can re-submit the app after fixing the issues. Note that, while the PR is open (i.e., the app is under review), a developer cannot re-submit the same app (the GitHub action we use to create an app submission PR will produce errors when duplicate app submission is detected). If the developer wants to fix any problems or update the app, they can close the PR (if they are a part of the CLAMS team) or ask the CLAMS team to close the PR (if they are an external contributor).

The re-submission process is simply to delete the tag from the remote app code repository and re-create the tag on the updated git commit. If the original submission was via a GH issue, the re-submission process is to create a new issue with the updated tag/commit and container image URL.

About

A repository to keep record of CLAMS apps

Resources

Stars

3 stars

Watchers

3 watching

Forks

Releases

Packages

Used by

Contributors

Languages

, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Auto-enable theater mode on YouTube\n(function() {\n function tryTheater() {\n var btn = document.querySelector('button[aria-label=\"Theater mode\"], ytd-player #player button[title=\"Theater mode\"]');\n if (btn && !btn.classList.contains('activated')) {\n btn.click();\n }\n }\n \n // Try immediately\n tryTheater();\n \n // Try after navigation (SPA)\n var lastUrl = location.href;\n setInterval(function() {\n if (location.href !== lastUrl) {\n lastUrl = location.href;\n setTimeout(tryTheater, 500);\n }\n }, 1000);\n \n // Also try on player load\n var observer = new MutationObserver(tryTheater);\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "YouTube Theater Mode Default"); } } catch(__e) { console.warn('[Userscript:YouTube Theater Mode Default]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
Skip to content

Latest commit

History

803 Commits

Folders and files

NameName
Last commit message
Last commit date

Repository files navigation

The CLAMS App Directory is a public registry for free and open CLAMS apps, available at https://clamsproject.github.io/apps.

Contributing to the App Directory

What apps can be submitted?

The App Directory accepts submissions of CLAMS apps. All submitted apps must follow the CLAMS app interface specification. In a nutshell, at the minimum,

  1. The app should be released as a pre-built container image, at a public container registry (e.g., Docker Hub, GitHub Container Registry, etc.).
  2. The app should expose an HTTP API that follows the CLAMS app interface specification.
  3. The app developer should provide correct and up-to-date app metadata - the app metadata will be the front page for your app.
  4. The app developer should maintain an issue tracking system on their own. The CLAMS App Directory does not provide issue tracking for the individual apps.

How to submit an app?

First and foremost note that, at the moment, all the submissions are manually reviewed by the CLAMS team, hence the process can take some time.

Here is a step-by-step guide on how an app submission works:

  • App submission and the associated review process are all done via the GitHub pull request system.
  • In essence, a submission is a PR to the App Directory repository.
  • After the team reviewed the PR, the app will be registered on the directory by merging the PR.
  • However, we don't accept an app submission via a regular PR sent from a fork.
    • Forked PRs for app directory feature development and bug fixes are alOther remarks ways welcome, though!
  • Instead, there are two ways to submit an app (i.e., to open a submission PR) to the directory:

If you are a part of the CLAMS team (using the clamsproject GitHub organization)

If you started developing the app using the clams develop cookie cutter, the app submission process is very simple. Push a git tag to your app code repository organized under the clamsproject GitHub organization. If you want to leave a release note make the tag annotated and write the note in markdown syntax as the tag message. The App Directory will use the tag name as the app version, and the tag message as the app release note.

Once you push the tag, a GH actions workflow included in the cookie cutter will automatically

  1. build a container image from the tagged app code and push to clamsproject GitHub Container Registry
  2. call another GH actions worklow on the App Directory repository to create a PR with the app metadata and the container image URL.

More on the git tag.

  • If you are not familiar with git tags, you should read the official git documentation first. "Git tags" ARE NOT "github releases".
  • The tag name should be a numerical form with v prefix (e.g., v1, v2.0, v240630). As long as the tag name is unique and numerical, you can use any form you like.

If you are an external contributor (using your own GitHub organization)

If you are an external contributor, you can submit an app to the directory by manually opening an issue on the App Directory repository.

  1. Prepare a git-based reference point for the following step. This reference will be used to download your app code. Your code must provide metadata.py script in the project root that generates app metadata JSON string when directly run (python metadata.py).
    1. Recommended way is to follow the same steps above to create a git tag (annotated tag to include a release note) and push it to your app code repository.
    2. Alternative, you can use the git commit hash. This way, you're losing a way to provide a release note. Regardless, it is highly recommended to maintain an external changelog in the app repository.
  2. Then, open an issue on the App Directory repository. Pick an issue template for app submission, and fill out the form. (direct link to the app submission form)

What happens after the submission?

After the submission, the CLAMS team will review the app and the metadata. If the app is accepted, the team will merge the PR, and the app will be listed on the directory. If the app is rejected (mostly for mis-aligned app metadata), the team will close the PR with a reason for rejection. In such a case, the developer can re-submit the app after fixing the issues. Note that, while the PR is open (i.e., the app is under review), a developer cannot re-submit the same app (the GitHub action we use to create an app submission PR will produce errors when duplicate app submission is detected). If the developer wants to fix any problems or update the app, they can close the PR (if they are a part of the CLAMS team) or ask the CLAMS team to close the PR (if they are an external contributor).

The re-submission process is simply to delete the tag from the remote app code repository and re-create the tag on the updated git commit. If the original submission was via a GH issue, the re-submission process is to create a new issue with the updated tag/commit and container image URL.

About

A repository to keep record of CLAMS apps

Resources

Stars

3 stars

Watchers

3 watching

Forks

Releases

Packages

Used by

Contributors

Languages

, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Remove or un-stick sticky/fixed headers that block content\n(function() {\n function unstick() {\n document.querySelectorAll('header, nav, [role=\"banner\"], .header, .navbar, .sticky, .fixed-top, [style*=\"position: fixed\"], [style*=\"position:sticky\"]').forEach(function(el) {\n if (el.style.position === 'fixed' || el.style.position === 'sticky' || \n getComputedStyle(el).position === 'fixed' || getComputedStyle(el).position === 'sticky') {\n el.style.position = 'static';\n el.style.top = 'auto';\n el.style.zIndex = 'auto';\n }\n });\n }\n \n unstick();\n \n var observer = new MutationObserver(unstick);\n observer.observe(document.body, { childList: true, subtree: true, attributes: true, attributeFilter: ['style', 'class'] });\n})();", "Kill Sticky Headers"); } } catch(__e) { console.warn('[Userscript:Kill Sticky Headers]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
Skip to content

Latest commit

History

803 Commits

Folders and files

NameName
Last commit message
Last commit date

Repository files navigation

The CLAMS App Directory is a public registry for free and open CLAMS apps, available at https://clamsproject.github.io/apps.

Contributing to the App Directory

What apps can be submitted?

The App Directory accepts submissions of CLAMS apps. All submitted apps must follow the CLAMS app interface specification. In a nutshell, at the minimum,

  1. The app should be released as a pre-built container image, at a public container registry (e.g., Docker Hub, GitHub Container Registry, etc.).
  2. The app should expose an HTTP API that follows the CLAMS app interface specification.
  3. The app developer should provide correct and up-to-date app metadata - the app metadata will be the front page for your app.
  4. The app developer should maintain an issue tracking system on their own. The CLAMS App Directory does not provide issue tracking for the individual apps.

How to submit an app?

First and foremost note that, at the moment, all the submissions are manually reviewed by the CLAMS team, hence the process can take some time.

Here is a step-by-step guide on how an app submission works:

  • App submission and the associated review process are all done via the GitHub pull request system.
  • In essence, a submission is a PR to the App Directory repository.
  • After the team reviewed the PR, the app will be registered on the directory by merging the PR.
  • However, we don't accept an app submission via a regular PR sent from a fork.
    • Forked PRs for app directory feature development and bug fixes are alOther remarks ways welcome, though!
  • Instead, there are two ways to submit an app (i.e., to open a submission PR) to the directory:

If you are a part of the CLAMS team (using the clamsproject GitHub organization)

If you started developing the app using the clams develop cookie cutter, the app submission process is very simple. Push a git tag to your app code repository organized under the clamsproject GitHub organization. If you want to leave a release note make the tag annotated and write the note in markdown syntax as the tag message. The App Directory will use the tag name as the app version, and the tag message as the app release note.

Once you push the tag, a GH actions workflow included in the cookie cutter will automatically

  1. build a container image from the tagged app code and push to clamsproject GitHub Container Registry
  2. call another GH actions worklow on the App Directory repository to create a PR with the app metadata and the container image URL.

More on the git tag.

  • If you are not familiar with git tags, you should read the official git documentation first. "Git tags" ARE NOT "github releases".
  • The tag name should be a numerical form with v prefix (e.g., v1, v2.0, v240630). As long as the tag name is unique and numerical, you can use any form you like.

If you are an external contributor (using your own GitHub organization)

If you are an external contributor, you can submit an app to the directory by manually opening an issue on the App Directory repository.

  1. Prepare a git-based reference point for the following step. This reference will be used to download your app code. Your code must provide metadata.py script in the project root that generates app metadata JSON string when directly run (python metadata.py).
    1. Recommended way is to follow the same steps above to create a git tag (annotated tag to include a release note) and push it to your app code repository.
    2. Alternative, you can use the git commit hash. This way, you're losing a way to provide a release note. Regardless, it is highly recommended to maintain an external changelog in the app repository.
  2. Then, open an issue on the App Directory repository. Pick an issue template for app submission, and fill out the form. (direct link to the app submission form)

What happens after the submission?

After the submission, the CLAMS team will review the app and the metadata. If the app is accepted, the team will merge the PR, and the app will be listed on the directory. If the app is rejected (mostly for mis-aligned app metadata), the team will close the PR with a reason for rejection. In such a case, the developer can re-submit the app after fixing the issues. Note that, while the PR is open (i.e., the app is under review), a developer cannot re-submit the same app (the GitHub action we use to create an app submission PR will produce errors when duplicate app submission is detected). If the developer wants to fix any problems or update the app, they can close the PR (if they are a part of the CLAMS team) or ask the CLAMS team to close the PR (if they are an external contributor).

The re-submission process is simply to delete the tag from the remote app code repository and re-create the tag on the updated git commit. If the original submission was via a GH issue, the re-submission process is to create a new issue with the updated tag/commit and container image URL.

About

A repository to keep record of CLAMS apps

Resources

Stars

3 stars

Watchers

3 watching

Forks

Releases

Packages

Used by

Contributors

Languages

, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Universal Dark Mode - works on any site\n(function() {\n var enabled = true;\n \n function applyDarkMode() {\n if (!enabled) return;\n \n // Create style element if it doesn't exist\n var style = document.getElementById('universal-dark-mode-style');\n if (!style) {\n style = document.createElement('style');\n style.id = 'universal-dark-mode-style';\n document.head.appendChild(style);\n }\n \n // Dark mode CSS - inverts colors but preserves images/video\n style.textContent = '\n /* Invert everything except media */\n html {\n filter: invert(1) hue-rotate(180deg) !important;\n background: #1a1a2e !important;\n }\n \n /* Restore images, videos, iframes, canvas */\n img, video, iframe, canvas, svg, picture, [style*=\"background-image\"] {\n filter: invert(1) hue-rotate(180deg) !important;\n }\n \n /* Preserve specific elements that should not be inverted */\n .no-dark-mode, .no-dark-mode *,\n [data-theme=\"light\"], [data-theme=\"light\"],\n .ace_editor, .ace_editor *,\n .CodeMirror, .CodeMirror *,\n .monaco-editor, .monaco-editor *,\n .markdown-body pre, .markdown-body pre *,\n .highlight, .highlight *,\n pre code, pre code * {\n filter: none !important;\n }\n \n /* Fix common UI elements */\n .modal, .popup, .dropdown-menu, .tooltip, .popover {\n filter: invert(1) hue-rotate(180deg) !important;\n background: #2d2d44 !important;\n border-color: #444 !important;\n }\n \n /* Scrollbars */\n ::-webkit-scrollbar { background: #1a1a2e !important; }\n ::-webkit-scrollbar-thumb { background: #444 !important; }\n ::-webkit-scrollbar-thumb:hover { background: #555 !important; }\n \n /* Selection */\n ::selection { background: #4ecdc4 !important; color: #1a1a2e !important; }\n ::-moz-selection { background: #4ecdc4 !important; color: #1a1a2e !important; }\n ';\n }\n \n function removeDarkMode() {\n var style = document.getElementById('universal-dark-mode-style');\n if (style) style.remove();\n }\n \n // Toggle with Alt+Shift+D\n document.addEventListener('keydown', function(e) {\n if (e.altKey && e.shiftKey && e.key === 'D') {\n e.preventDefault();\n enabled = !enabled;\n if (enabled) {\n applyDarkMode();\n console.log('[Universal Dark Mode] Enabled');\n } else {\n removeDarkMode();\n console.log('[Universal Dark Mode] Disabled');\n }\n }\n });\n \n // Apply on load\n applyDarkMode();\n \n // Re-apply on dynamic content\n var observer = new MutationObserver(function(mutations) {\n if (enabled && !document.getElementById('universal-dark-mode-style')) {\n applyDarkMode();\n }\n });\n observer.observe(document.head, { childList: true });\n \n console.log('[Universal Dark Mode] Loaded - Press Alt+Shift+D to toggle');\n})();", "Universal Dark Mode"); } } catch(__e) { console.warn('[Userscript:Universal Dark Mode]', __e); } })(); })();
Skip to content

Latest commit

History

803 Commits

Folders and files

NameName
Last commit message
Last commit date

Repository files navigation

The CLAMS App Directory is a public registry for free and open CLAMS apps, available at https://clamsproject.github.io/apps.

Contributing to the App Directory

What apps can be submitted?

The App Directory accepts submissions of CLAMS apps. All submitted apps must follow the CLAMS app interface specification. In a nutshell, at the minimum,

  1. The app should be released as a pre-built container image, at a public container registry (e.g., Docker Hub, GitHub Container Registry, etc.).
  2. The app should expose an HTTP API that follows the CLAMS app interface specification.
  3. The app developer should provide correct and up-to-date app metadata - the app metadata will be the front page for your app.
  4. The app developer should maintain an issue tracking system on their own. The CLAMS App Directory does not provide issue tracking for the individual apps.

How to submit an app?

First and foremost note that, at the moment, all the submissions are manually reviewed by the CLAMS team, hence the process can take some time.

Here is a step-by-step guide on how an app submission works:

  • App submission and the associated review process are all done via the GitHub pull request system.
  • In essence, a submission is a PR to the App Directory repository.
  • After the team reviewed the PR, the app will be registered on the directory by merging the PR.
  • However, we don't accept an app submission via a regular PR sent from a fork.
    • Forked PRs for app directory feature development and bug fixes are alOther remarks ways welcome, though!
  • Instead, there are two ways to submit an app (i.e., to open a submission PR) to the directory:

If you are a part of the CLAMS team (using the clamsproject GitHub organization)

If you started developing the app using the clams develop cookie cutter, the app submission process is very simple. Push a git tag to your app code repository organized under the clamsproject GitHub organization. If you want to leave a release note make the tag annotated and write the note in markdown syntax as the tag message. The App Directory will use the tag name as the app version, and the tag message as the app release note.

Once you push the tag, a GH actions workflow included in the cookie cutter will automatically

  1. build a container image from the tagged app code and push to clamsproject GitHub Container Registry
  2. call another GH actions worklow on the App Directory repository to create a PR with the app metadata and the container image URL.

More on the git tag.

  • If you are not familiar with git tags, you should read the official git documentation first. "Git tags" ARE NOT "github releases".
  • The tag name should be a numerical form with v prefix (e.g., v1, v2.0, v240630). As long as the tag name is unique and numerical, you can use any form you like.

If you are an external contributor (using your own GitHub organization)

If you are an external contributor, you can submit an app to the directory by manually opening an issue on the App Directory repository.

  1. Prepare a git-based reference point for the following step. This reference will be used to download your app code. Your code must provide metadata.py script in the project root that generates app metadata JSON string when directly run (python metadata.py).
    1. Recommended way is to follow the same steps above to create a git tag (annotated tag to include a release note) and push it to your app code repository.
    2. Alternative, you can use the git commit hash. This way, you're losing a way to provide a release note. Regardless, it is highly recommended to maintain an external changelog in the app repository.
  2. Then, open an issue on the App Directory repository. Pick an issue template for app submission, and fill out the form. (direct link to the app submission form)

What happens after the submission?

After the submission, the CLAMS team will review the app and the metadata. If the app is accepted, the team will merge the PR, and the app will be listed on the directory. If the app is rejected (mostly for mis-aligned app metadata), the team will close the PR with a reason for rejection. In such a case, the developer can re-submit the app after fixing the issues. Note that, while the PR is open (i.e., the app is under review), a developer cannot re-submit the same app (the GitHub action we use to create an app submission PR will produce errors when duplicate app submission is detected). If the developer wants to fix any problems or update the app, they can close the PR (if they are a part of the CLAMS team) or ask the CLAMS team to close the PR (if they are an external contributor).

The re-submission process is simply to delete the tag from the remote app code repository and re-create the tag on the updated git commit. If the original submission was via a GH issue, the re-submission process is to create a new issue with the updated tag/commit and container image URL.

About

A repository to keep record of CLAMS apps

Resources

Stars

3 stars

Watchers

3 watching

Forks

Releases

Packages

Used by

Contributors

Languages