Parameter handling while signing views #296

Description

@marcverhagen

When signing views some unintuitive things can happen to the parameters stored in the metadata of the view.

First, if a parameter was not defined for the app you get a warning but the parameter is still stored in the metadata (these both make sense). But if the parameter is multi-valued then only the first value will be stored in the metadata.

This is easy to change by fiddling with the two instances of this code in the sign_view() method:

ifkinparams_mapandparams_map[k].multivalued:
view.metadata.add_parameter(k, str(v))
else:
view.metadata.add_parameter(k, v[0])

Second, if parameters were handed in via an envelope then it is maybe better to not make the values always a string. That made sense for parameters handed in via command line options and GET variables, less so for values that initially came from a JSON file that used dictionaries and lists as it pleased.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    • Status
      Done

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

    , 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Add copy buttons to all
     blocks\n(function() {\n function addCopyButtons() {\n document.querySelectorAll('pre code').forEach(function(codeBlock) {\n if (codeBlock.parentElement.hasAttribute('data-copy-added')) return;\n codeBlock.parentElement.setAttribute('data-copy-added', 'true');\n \n var btn = document.createElement('button');\n btn.textContent = 'Copy';\n btn.style.cssText = 'position:absolute;top:4px;right:4px;padding:2px 8px;font-size:11px;background:#4ecdc4;border:none;border-radius:4px;color:#1a1a2e;cursor:pointer;opacity:0.7;transition:opacity 0.2s;';\n btn.onmouseover = function() { this.style.opacity = '1'; };\n btn.onmouseout = function() { this.style.opacity = '0.7'; };\n btn.onclick = function() {\n navigator.clipboard.writeText(codeBlock.textContent).then(function() {\n btn.textContent = 'Copied!';\n setTimeout(function() { btn.textContent = 'Copy'; }, 1500);\n });\n };\n codeBlock.parentElement.style.position = 'relative';\n codeBlock.parentElement.appendChild(btn);\n });\n }\n \n addCopyButtons();\n \n // Re-run on dynamic content\n var observer = new MutationObserver(addCopyButtons);\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "Add Copy Buttons to Code Blocks");
    }
    } catch(__e) { console.warn('[Userscript:Add Copy Buttons to Code Blocks]', __e); }
    })();
    (function(){
    try {
    var __m = "github.com";
    var __re = new RegExp('^' + "github\\.com" + '
    
    Skip to content

    Parameter handling while signing views #296

    Description

    @marcverhagen

    When signing views some unintuitive things can happen to the parameters stored in the metadata of the view.

    First, if a parameter was not defined for the app you get a warning but the parameter is still stored in the metadata (these both make sense). But if the parameter is multi-valued then only the first value will be stored in the metadata.

    This is easy to change by fiddling with the two instances of this code in the sign_view() method:

    ifkinparams_mapandparams_map[k].multivalued:
    view.metadata.add_parameter(k, str(v))
    else:
    view.metadata.add_parameter(k, v[0])

    Second, if parameters were handed in via an envelope then it is maybe better to not make the values always a string. That made sense for parameters handed in via command line options and GET variables, less so for values that initially came from a JSON file that used dictionaries and lists as it pleased.

    Activity

    Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

    Metadata

    Metadata

    Assignees

    No one assigned

      Labels

      No labels
      No labels

      Type

      No type

      Projects

      • Status
        Done

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      , 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Force GitHub README to respect dark mode\n(function() {\n var style = document.createElement('style');\n style.textContent = '\n .markdown-body {\n color-scheme: dark light;\n }\n .markdown-body pre { background: #161b22 !important; }\n .markdown-body code { background: rgba(110, 118, 129, 0.4) !important; }\n .markdown-body table th, .markdown-body table td { border-color: #30363d !important; }\n .markdown-body img { background: #0d1117; }\n .markdown-body blockquote { border-left-color: #8b949e; }\n .markdown-body hr { border-color: #30363d; }\n ';\n document.head.appendChild(style);\n})();", "GitHub Dark Mode README Fix"); } } catch(__e) { console.warn('[Userscript:GitHub Dark Mode README Fix]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
      Skip to content

      Parameter handling while signing views #296

      Description

      @marcverhagen

      When signing views some unintuitive things can happen to the parameters stored in the metadata of the view.

      First, if a parameter was not defined for the app you get a warning but the parameter is still stored in the metadata (these both make sense). But if the parameter is multi-valued then only the first value will be stored in the metadata.

      This is easy to change by fiddling with the two instances of this code in the sign_view() method:

      ifkinparams_mapandparams_map[k].multivalued:
      view.metadata.add_parameter(k, str(v))
      else:
      view.metadata.add_parameter(k, v[0])

      Second, if parameters were handed in via an envelope then it is maybe better to not make the values always a string. That made sense for parameters handed in via command line options and GET variables, less so for values that initially came from a JSON file that used dictionaries and lists as it pleased.

      Activity

      Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

      Metadata

      Metadata

      Assignees

      No one assigned

        Labels

        No labels
        No labels

        Type

        No type

        Projects

        • Status
          Done

        Milestone

        No milestone

        Relationships

        None yet

        Development

        No branches or pull requests

        Issue actions

        , 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Highlight search terms from Google/DuckDuckGo/Bing referrer\n(function() {\n var ref = document.referrer;\n var terms = [];\n \n if (ref.includes('google.com') || ref.includes('duckduckgo.com') || ref.includes('bing.com')) {\n var url = new URL(ref);\n var q = url.searchParams.get('q') || url.searchParams.get('p');\n if (q) {\n terms = q.split(/\\s+/).filter(function(t) { return t.length > 2; });\n }\n }\n \n if (terms.length === 0) return;\n \n var style = document.createElement('style');\n style.textContent = '.userscript-highlight { background: #fbbf24; color: #1a1a2e; padding: 1px 3px; border-radius: 2px; }';\n document.head.appendChild(style);\n \n function highlight(node) {\n if (node.nodeType === 3) { // text node\n var text = node.textContent;\n var found = false;\n terms.forEach(function(term) {\n var regex = new RegExp('(' + term.replace(/[.*+?^${}()|[\\]\\\\]/g, '\\\\') + ')', 'gi');\n if (regex.test(text)) {\n found = true;\n var frag = document.createDocumentFragment();\n var parts = text.split(regex);\n parts.forEach(function(part, i) {\n if (i % 2 === 0) {\n frag.appendChild(document.createTextNode(part));\n } else {\n var span = document.createElement('span');\n span.className = 'userscript-highlight';\n span.textContent = part;\n frag.appendChild(span);\n }\n });\n node.parentNode.replaceChild(frag, node);\n }\n });\n } else if (node.nodeType === 1 && node.childNodes) { // element\n var skipTags = ['SCRIPT', 'STYLE', 'NOSCRIPT', 'TEXTAREA', 'INPUT', 'SELECT'];\n if (!skipTags.includes(node.tagName)) {\n Array.from(node.childNodes).forEach(highlight);\n }\n }\n }\n \n highlight(document.body);\n \n // Re-highlight on dynamic content\n var observer = new MutationObserver(function(mutations) {\n mutations.forEach(function(m) {\n m.addedNodes.forEach(function(node) {\n if (node.nodeType === 1 || node.nodeType === 3) highlight(node);\n });\n });\n });\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "Highlight Search Terms"); } } catch(__e) { console.warn('[Userscript:Highlight Search Terms]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
        Skip to content

        Parameter handling while signing views #296

        Description

        @marcverhagen

        When signing views some unintuitive things can happen to the parameters stored in the metadata of the view.

        First, if a parameter was not defined for the app you get a warning but the parameter is still stored in the metadata (these both make sense). But if the parameter is multi-valued then only the first value will be stored in the metadata.

        This is easy to change by fiddling with the two instances of this code in the sign_view() method:

        ifkinparams_mapandparams_map[k].multivalued:
        view.metadata.add_parameter(k, str(v))
        else:
        view.metadata.add_parameter(k, v[0])

        Second, if parameters were handed in via an envelope then it is maybe better to not make the values always a string. That made sense for parameters handed in via command line options and GET variables, less so for values that initially came from a JSON file that used dictionaries and lists as it pleased.

        Activity

        Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

        Metadata

        Metadata

        Assignees

        No one assigned

          Labels

          No labels
          No labels

          Type

          No type

          Projects

          • Status
            Done

          Milestone

          No milestone

          Relationships

          None yet

          Development

          No branches or pull requests

          Issue actions

          , 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Strip utm_, fbclid, gclid, etc. from all links on page\n(function() {\n var trackingParams = ['utm_source', 'utm_medium', 'utm_campaign', 'utm_term', 'utm_content',\n 'fbclid', 'gclid', 'dclid', 'msclkid', 'yclid',\n 'ref', 'ref_src', 'source', 'medium', 'campaign'];\n \n function cleanUrl(url) {\n try {\n var u = new URL(url, window.location.origin);\n var changed = false;\n trackingParams.forEach(function(p) {\n if (u.searchParams.has(p)) {\n u.searchParams.delete(p);\n changed = true;\n }\n });\n return changed ? u.toString() : url;\n } catch (e) {\n return url;\n }\n }\n \n function cleanLinks() {\n document.querySelectorAll('a[href]').forEach(function(a) {\n var clean = cleanUrl(a.href);\n if (clean !== a.href) a.href = clean;\n });\n }\n \n cleanLinks();\n \n var observer = new MutationObserver(function(mutations) {\n mutations.forEach(function(m) {\n m.addedNodes.forEach(function(node) {\n if (node.nodeType === 1) {\n if (node.tagName === 'A') cleanLinks();\n node.querySelectorAll('a[href]').forEach(function(a) {\n var clean = cleanUrl(a.href);\n if (clean !== a.href) a.href = clean;\n });\n }\n });\n });\n });\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "Remove Tracking Parameters from Links"); } } catch(__e) { console.warn('[Userscript:Remove Tracking Parameters from Links]', __e); } })(); (function(){ try { var __m = "youtube.com"; var __re = new RegExp('^' + "youtube\\.com" + '
          Skip to content

          Parameter handling while signing views #296

          Description

          @marcverhagen

          When signing views some unintuitive things can happen to the parameters stored in the metadata of the view.

          First, if a parameter was not defined for the app you get a warning but the parameter is still stored in the metadata (these both make sense). But if the parameter is multi-valued then only the first value will be stored in the metadata.

          This is easy to change by fiddling with the two instances of this code in the sign_view() method:

          ifkinparams_mapandparams_map[k].multivalued:
          view.metadata.add_parameter(k, str(v))
          else:
          view.metadata.add_parameter(k, v[0])

          Second, if parameters were handed in via an envelope then it is maybe better to not make the values always a string. That made sense for parameters handed in via command line options and GET variables, less so for values that initially came from a JSON file that used dictionaries and lists as it pleased.

          Activity

          Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

          Metadata

          Metadata

          Assignees

          No one assigned

            Labels

            No labels
            No labels

            Type

            No type

            Projects

            • Status
              Done

            Milestone

            No milestone

            Relationships

            None yet

            Development

            No branches or pull requests

            Issue actions

            , 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Auto-enable theater mode on YouTube\n(function() {\n function tryTheater() {\n var btn = document.querySelector('button[aria-label=\"Theater mode\"], ytd-player #player button[title=\"Theater mode\"]');\n if (btn && !btn.classList.contains('activated')) {\n btn.click();\n }\n }\n \n // Try immediately\n tryTheater();\n \n // Try after navigation (SPA)\n var lastUrl = location.href;\n setInterval(function() {\n if (location.href !== lastUrl) {\n lastUrl = location.href;\n setTimeout(tryTheater, 500);\n }\n }, 1000);\n \n // Also try on player load\n var observer = new MutationObserver(tryTheater);\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "YouTube Theater Mode Default"); } } catch(__e) { console.warn('[Userscript:YouTube Theater Mode Default]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
            Skip to content

            Parameter handling while signing views #296

            Description

            @marcverhagen

            When signing views some unintuitive things can happen to the parameters stored in the metadata of the view.

            First, if a parameter was not defined for the app you get a warning but the parameter is still stored in the metadata (these both make sense). But if the parameter is multi-valued then only the first value will be stored in the metadata.

            This is easy to change by fiddling with the two instances of this code in the sign_view() method:

            ifkinparams_mapandparams_map[k].multivalued:
            view.metadata.add_parameter(k, str(v))
            else:
            view.metadata.add_parameter(k, v[0])

            Second, if parameters were handed in via an envelope then it is maybe better to not make the values always a string. That made sense for parameters handed in via command line options and GET variables, less so for values that initially came from a JSON file that used dictionaries and lists as it pleased.

            Activity

            Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

            Metadata

            Metadata

            Assignees

            No one assigned

              Labels

              No labels
              No labels

              Type

              No type

              Projects

              • Status
                Done

              Milestone

              No milestone

              Relationships

              None yet

              Development

              No branches or pull requests

              Issue actions

              , 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Remove or un-stick sticky/fixed headers that block content\n(function() {\n function unstick() {\n document.querySelectorAll('header, nav, [role=\"banner\"], .header, .navbar, .sticky, .fixed-top, [style*=\"position: fixed\"], [style*=\"position:sticky\"]').forEach(function(el) {\n if (el.style.position === 'fixed' || el.style.position === 'sticky' || \n getComputedStyle(el).position === 'fixed' || getComputedStyle(el).position === 'sticky') {\n el.style.position = 'static';\n el.style.top = 'auto';\n el.style.zIndex = 'auto';\n }\n });\n }\n \n unstick();\n \n var observer = new MutationObserver(unstick);\n observer.observe(document.body, { childList: true, subtree: true, attributes: true, attributeFilter: ['style', 'class'] });\n})();", "Kill Sticky Headers"); } } catch(__e) { console.warn('[Userscript:Kill Sticky Headers]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
              Skip to content

              Parameter handling while signing views #296

              Description

              @marcverhagen

              When signing views some unintuitive things can happen to the parameters stored in the metadata of the view.

              First, if a parameter was not defined for the app you get a warning but the parameter is still stored in the metadata (these both make sense). But if the parameter is multi-valued then only the first value will be stored in the metadata.

              This is easy to change by fiddling with the two instances of this code in the sign_view() method:

              ifkinparams_mapandparams_map[k].multivalued:
              view.metadata.add_parameter(k, str(v))
              else:
              view.metadata.add_parameter(k, v[0])

              Second, if parameters were handed in via an envelope then it is maybe better to not make the values always a string. That made sense for parameters handed in via command line options and GET variables, less so for values that initially came from a JSON file that used dictionaries and lists as it pleased.

              Activity

              Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

              Metadata

              Metadata

              Assignees

              No one assigned

                Labels

                No labels
                No labels

                Type

                No type

                Projects

                • Status
                  Done

                Milestone

                No milestone

                Relationships

                None yet

                Development

                No branches or pull requests

                Issue actions

                , 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Universal Dark Mode - works on any site\n(function() {\n var enabled = true;\n \n function applyDarkMode() {\n if (!enabled) return;\n \n // Create style element if it doesn't exist\n var style = document.getElementById('universal-dark-mode-style');\n if (!style) {\n style = document.createElement('style');\n style.id = 'universal-dark-mode-style';\n document.head.appendChild(style);\n }\n \n // Dark mode CSS - inverts colors but preserves images/video\n style.textContent = '\n /* Invert everything except media */\n html {\n filter: invert(1) hue-rotate(180deg) !important;\n background: #1a1a2e !important;\n }\n \n /* Restore images, videos, iframes, canvas */\n img, video, iframe, canvas, svg, picture, [style*=\"background-image\"] {\n filter: invert(1) hue-rotate(180deg) !important;\n }\n \n /* Preserve specific elements that should not be inverted */\n .no-dark-mode, .no-dark-mode *,\n [data-theme=\"light\"], [data-theme=\"light\"],\n .ace_editor, .ace_editor *,\n .CodeMirror, .CodeMirror *,\n .monaco-editor, .monaco-editor *,\n .markdown-body pre, .markdown-body pre *,\n .highlight, .highlight *,\n pre code, pre code * {\n filter: none !important;\n }\n \n /* Fix common UI elements */\n .modal, .popup, .dropdown-menu, .tooltip, .popover {\n filter: invert(1) hue-rotate(180deg) !important;\n background: #2d2d44 !important;\n border-color: #444 !important;\n }\n \n /* Scrollbars */\n ::-webkit-scrollbar { background: #1a1a2e !important; }\n ::-webkit-scrollbar-thumb { background: #444 !important; }\n ::-webkit-scrollbar-thumb:hover { background: #555 !important; }\n \n /* Selection */\n ::selection { background: #4ecdc4 !important; color: #1a1a2e !important; }\n ::-moz-selection { background: #4ecdc4 !important; color: #1a1a2e !important; }\n ';\n }\n \n function removeDarkMode() {\n var style = document.getElementById('universal-dark-mode-style');\n if (style) style.remove();\n }\n \n // Toggle with Alt+Shift+D\n document.addEventListener('keydown', function(e) {\n if (e.altKey && e.shiftKey && e.key === 'D') {\n e.preventDefault();\n enabled = !enabled;\n if (enabled) {\n applyDarkMode();\n console.log('[Universal Dark Mode] Enabled');\n } else {\n removeDarkMode();\n console.log('[Universal Dark Mode] Disabled');\n }\n }\n });\n \n // Apply on load\n applyDarkMode();\n \n // Re-apply on dynamic content\n var observer = new MutationObserver(function(mutations) {\n if (enabled && !document.getElementById('universal-dark-mode-style')) {\n applyDarkMode();\n }\n });\n observer.observe(document.head, { childList: true });\n \n console.log('[Universal Dark Mode] Loaded - Press Alt+Shift+D to toggle');\n})();", "Universal Dark Mode"); } } catch(__e) { console.warn('[Userscript:Universal Dark Mode]', __e); } })(); })();
                Skip to content

                Parameter handling while signing views #296

                Description

                @marcverhagen

                When signing views some unintuitive things can happen to the parameters stored in the metadata of the view.

                First, if a parameter was not defined for the app you get a warning but the parameter is still stored in the metadata (these both make sense). But if the parameter is multi-valued then only the first value will be stored in the metadata.

                This is easy to change by fiddling with the two instances of this code in the sign_view() method:

                ifkinparams_mapandparams_map[k].multivalued:
                view.metadata.add_parameter(k, str(v))
                else:
                view.metadata.add_parameter(k, v[0])

                Second, if parameters were handed in via an envelope then it is maybe better to not make the values always a string. That made sense for parameters handed in via command line options and GET variables, less so for values that initially came from a JSON file that used dictionaries and lists as it pleased.

                Activity

                Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

                Metadata

                Metadata

                Assignees

                No one assigned

                  Labels

                  No labels
                  No labels

                  Type

                  No type

                  Projects

                  • Status
                    Done

                  Milestone

                  No milestone

                  Relationships

                  None yet

                  Development

                  No branches or pull requests

                  Issue actions