Skip to content

releasing 1.5.0 - #282

Merged
keighrim merged 14 commits into
mainfrom
develop
Mar 12, 2026
Merged

releasing 1.5.0#282
keighrim merged 14 commits into
mainfrom
develop

Conversation

@keighrim

Copy link
Copy Markdown
Member

Overview

Adds tfSamplingMode as a universal runtime parameter and overhauls container image builds with arm64 support and split HuggingFace/transformers versioning.

Additions

Changes

Note

This release requires mmif-python >= 1.3.0 for the sampling mode API.

updated container builder for arm64 images
integration with new basic TimeFrame sampling built-ins in mmif-python
Document the three frame sampling modes and how the SDK
handles the universal parameter automatically via context
variable. Notes upcoming property renames per mmif#238.
Document tfSamplingMode in developer tutorial
Split -hf images into -hf4 (transformers 4.x) and -hf5
(transformers 5.x) variants. Existing -hf images become
thin aliases that FROM the corresponding -hf5 image for
backward compatibility.
Add hf4/hf5 container images with hf as alias
@keighrim
keighrim merged commit 5e9bfa5 into mainMar 12, 2026
13 checks passed
@github-project-automationgithub-project-automationBot moved this from Todo to Done in infraMar 12, 2026
Sign up for freeto join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

Archived in project

Development

Successfully merging this pull request may close these issues.

2 participants

@keighrim@clams-bot