Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension


Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
84 changes: 63 additions & 21 deletions clams/app/__init__.py
Original file line numberDiff line numberDiff line change
Expand Up@@ -711,6 +711,26 @@ class ClamsPromptableApp(ClamsApp):
'values grow the KV cache linearly and increase GPU memory '
'usage; reduce if VRAM is constrained.',
},
{
'name': 'useReasoning', 'type': 'boolean', 'default': False,
'description':
'Request the model\'s reasoning ("thinking") mode. Off by '
'default. Honored only by apps whose backing model has a '
'distinct reasoning mode; apps without one ignore it. When '
'honored and enabled, the reasoning trace is split from the '
'answer and stored in the ``modelReasoningTrace`` property of '
'the output ``TextDocument`` (kept out of the document text). '
'Reasoning is markedly slower and far more token-hungry: the '
'whole trace is generated before the answer and drawn from the '
'same budget capped by ``maxNewTokens``, so raise '
'``maxNewTokens`` substantially (thousands of tokens, not '
'hundreds) when enabling this, or the trace may consume the '
'entire budget and the answer be truncated or empty. Small '
'reasoning models (as a rule of thumb, roughly 4B parameters '
'and under) are especially prone to non-terminating "thinking '
'loops" that exhaust the budget without producing an answer; '
'validate termination per model before relying on it.',
},
{
'name': 'temperature', 'type': 'number', 'default': 0.0,
'description':
Expand DownExpand Up@@ -1109,37 +1129,56 @@ def split_tagged_reasoning_trace(
text: str,
open_tag: str = '<think>',
close_tag: str = '</think>',
assume_open: bool = False,
) -> Tuple[str, Optional[str]]:
"""
Split a reasoning model's output into ``(answer, trace)`` for the
inline XML-tag style: a single reasoning block delimited by
``open_tag`` / ``close_tag`` (default ``<think>`` / ``</think>``)
embedded in the decoded text, e.g. as emitted by DeepSeek-R1 or
Qwen3.

It does NOT handle models that isolate reasoning in a separate
token-delimited channel rather than an inline tag block (e.g.
gpt-oss, Gemma 4); those need their own parsing in the app. Trace
handling is the app's responsibility either way -- call this when
the model fits the inline-tag style, or parse it yourself.

``answer`` is everything after the final ``close_tag`` (stripped);
``trace`` is the text between the tags, or ``None`` when no closed
block is present -- so it is safe to call on non-reasoning output,
which returns ``(text.strip(), None)``.
inline XML-tag style: a reasoning block delimited by ``open_tag`` /
``close_tag`` (default ``<think>`` / ``</think>``), e.g. as emitted
by DeepSeek-R1 or Qwen3.5.

Prefilled opening tags: some chat templates inject the OPENING tag
into the prompt when reasoning is enabled (Qwen3.5 does this), so the
decoded output carries only the CLOSING tag -- the model never emits
the opener. Pass ``assume_open=True`` in that situation (typically
wired to the app's reasoning toggle) so the trace is still recovered.
The cases:

* close tag present: ``answer`` is the text after it; ``trace`` is the
text between the tags, or everything before the close tag when the
opening tag is absent (prefilled).
* close tag absent, ``assume_open=True``: the output is unterminated
reasoning (e.g. the trace overran ``maxNewTokens`` before closing) --
there is no answer, so returns ``('', text.strip())``.
* close tag absent, ``assume_open=False`` (default): treated as a
plain, non-reasoning answer -- returns ``(text.strip(), None)``.

Only the inline-tag style is handled; models that isolate reasoning in
a separate token-delimited channel (e.g. gpt-oss, Gemma) need their own
parsing in the app.

:param text: raw decoded model output.
:param open_tag: opening marker of the inline reasoning block.
:param close_tag: closing marker of the inline reasoning block.
:param assume_open: treat the text as the body of a reasoning block
whose opening tag was prefilled into the prompt, so a missing close
tag means unterminated reasoning (empty answer) rather than a plain
answer.
:return: ``(answer, trace_or_None)``.
"""
ci = text.rfind(close_tag)
if ci == -1:
return text.strip(), None
return ('', text.strip()) if assume_open else (text.strip(), None)
answer = text[ci + len(close_tag):].strip()
oi = text.find(open_tag)
trace = (text[oi + len(open_tag):ci].strip()
if oi != -1 and oi < ci else None)
if oi != -1 and oi < ci:
trace = text[oi + len(open_tag):ci].strip()
elif assume_open:
# opening tag was prefilled into the prompt (not generated), so the
# trace is everything up to the close tag
trace = text[:ci].strip()
else:
trace = None
return answer, trace
class ClamsHFPromptableApp(ClamsPromptableApp):
"""
Expand DownExpand Up@@ -1511,10 +1550,13 @@ def build_template_kwargs(self, **generation_params) -> dict:
implementation returns ``{}``.

Override to inject model-specific chat-template controls without
having to reimplement :py:meth:`generate`. Common cases:
having to reimplement :py:meth:`generate`. This is where an app
honors the SDK ``useReasoning`` parameter, mapping it onto the
backend's reasoning switch. Common cases:

* ``{'enable_thinking': False}`` to run a reasoning ("thinking")
model in non-thinking mode;
* ``{'enable_thinking': bool(generation_params.get('use_reasoning'))}``
to bind ``useReasoning`` to a reasoning ("thinking") model's
template switch;
* ``{'tools': [...]}`` or ``{'documents': [...]}`` for tool-use /
RAG chat templates.

Expand Down
25 changes: 21 additions & 4 deletions clams/develop/templates/app/cli.py.template
Original file line numberDiff line numberDiff line change
Expand Up@@ -6,13 +6,17 @@ DO NOT CHANGE the name of the file
"""

import argparse
import json
import sys
from contextlib import redirect_stdout

import jsonschema

import app

import clams.app
from clams import AppMetadata
from clams.envelop import EnvelopeError


def metadata_to_argparser(app_metadata: AppMetadata) -> argparse.ArgumentParser:
Expand DownExpand Up@@ -81,11 +85,24 @@ if __name__ == "__main__":
params[pname] = pvalue
else:
params[pname] = [pvalue]
if args.OUT_MMIF_FILE.name == '<stdout>':
with redirect_stdout(sys.stderr):
# Mirror the HTTP server's error handling (see clams.restify): an invalid
# input is reported and exits non-zero, while an app-level failure is
# recorded as an error view instead of crashing with a raw traceback.
try:
if args.OUT_MMIF_FILE.name == '<stdout>':
with redirect_stdout(sys.stderr):
out_mmif = clamsapp.annotate(in_data, **params)
else:
out_mmif = clamsapp.annotate(in_data, **params)
else:
out_mmif = clamsapp.annotate(in_data, **params)
except (jsonschema.exceptions.ValidationError, json.JSONDecodeError, EnvelopeError) as e:
detail = e.message if isinstance(e, jsonschema.exceptions.ValidationError) else str(e)
print(f"Invalid input data. See below for validation error.\n\n{detail}", file=sys.stderr)
sys.exit(1)
except Exception:
clamsapp.logger.exception("Error in annotation")
out_mmif = clamsapp.record_error(in_data, **params).serialize(pretty=True)
args.OUT_MMIF_FILE.write(out_mmif)
sys.exit(1)
args.OUT_MMIF_FILE.write(out_mmif)
else:
arg_parser.print_help()
Expand Down
62 changes: 61 additions & 1 deletion documentation/app-baseclasses.rst
Original file line numberDiff line numberDiff line change
Expand Up@@ -174,6 +174,17 @@ from :class:`~clams.app.ClamsApp`. These names are reserved; see
- Maximum number of new tokens generated per inference call. Larger values
grow the KV cache linearly and add to GPU memory usage; reduce if VRAM
is constrained.
* - ``useReasoning``
- boolean
- ``false``
- no
- Request the model's reasoning ("thinking") mode. Off by default;
honored only by apps whose model has a distinct reasoning mode
(others ignore it). Much slower and more token-hungry -- the trace is
generated before the answer and drawn from the ``maxNewTokens`` budget,
and small models can loop without terminating. When honored, the trace
is stored in the ``modelReasoningTrace`` property of the output
``TextDocument``. See :ref:`promptable-reasoning`.
* - ``temperature``
- number
- ``0.0``
Expand DownExpand Up@@ -320,6 +331,52 @@ inferences, final reply returned.
``turn-taking`` is the default because it costs a single inference call
and is the more common multi-element pattern.

.. _promptable-reasoning:

Reasoning traces (``useReasoning``)
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

Some models expose a distinct reasoning ("thinking") mode that emits an
intermediate reasoning trace before the answer. ``useReasoning`` is the
standard toggle for that mode. It is inert unless the app honors it, and
honoring is a per-app choice with three wiring points:

- map ``useReasoning`` onto the backend's reasoning switch (for HF chat
templates, typically ``enable_thinking``) by overriding
:meth:`~clams.app.ClamsHFPromptableApp.build_template_kwargs`;
- split the trace from the answer with
:meth:`~clams.app.ClamsPromptableApp.split_tagged_reasoning_trace`
(inline ``<think>...</think>``-style traces only; channel-delimited
formats need app-specific parsing). Many chat templates prefill the
opening ``<think>`` into the prompt, so only the closing tag appears in
the output; pass ``assume_open=True`` (wired to the reasoning toggle) so
the trace is still recovered and a missing close tag is read as
unterminated reasoning (empty answer) rather than a plain answer;
- pass the trace to
:meth:`~clams.app.ClamsPromptableApp.response_to_grounded_textdocument`
through its ``reasoning_trace`` argument, which stores it in the
``modelReasoningTrace`` property of the produced ``TextDocument``,
separate from the document text.

An app whose model has no reasoning mode leaves ``useReasoning`` unwired;
callers may still set it and it has no effect, like ``topK`` under greedy
decoding.

Cost and failure modes
""""""""""""""""""""""

Reasoning is much slower and far more token-hungry than a direct answer:
the entire trace is generated first, from the same budget capped by
``maxNewTokens``. Enabling ``useReasoning`` without raising ``maxNewTokens``
substantially (thousands of tokens, not hundreds) risks the trace consuming
the whole budget, leaving the answer truncated or empty. Small reasoning
models (as a rule of thumb, roughly 4B parameters and under) are especially
prone to non-terminating "thinking loops" that never reach an answer; budget
generously and validate termination per model. When the trace overruns the
budget before closing, ``assume_open=True`` yields an empty answer plus the
unterminated trace -- an app should surface that (e.g. a warning and an empty
``TextDocument``) rather than emitting the raw reasoning as the answer.

Helpers
^^^^^^^

Expand DownExpand Up@@ -512,7 +569,10 @@ supplies:
* a default
:py:meth:`~clams.app.ClamsHFPromptableApp.build_gen_kwargs` that
maps the SDK promptable parameters to HF ``model.generate()``
kwargs.
kwargs;
* a :py:meth:`~clams.app.ClamsHFPromptableApp.build_template_kwargs`
hook for chat-template controls, the override point for honoring
``useReasoning`` (see :ref:`promptable-reasoning`).

See each method's docstring for full details.

Expand Down
4 changes: 3 additions & 1 deletion documentation/conf.py
Original file line numberDiff line numberDiff line change
Expand Up@@ -26,7 +26,9 @@

# -- Project information -----------------------------------------------------

project = proj_root_dir.name
# The canonical package name — NOT derived from the checkout directory,
# which is `clone-repo` when the shared docs-publish workflow builds here.
project = 'clams-python'
blob_base_url = f'https://github.com/clamsproject/{project}/blob'
copyright = f'{datetime.date.today().year}, Brandeis LLC'
author = 'Brandeis LLC'
Expand Down
1 change: 1 addition & 0 deletions documentation/target-versions.csv
Original file line numberDiff line numberDiff line change
@@ -1,4 +1,5 @@
"``clams-python`` version","``mmif-python`` version","Target MMIF Specification"
`1.7.3 <https://pypi.org/project/clams-python/1.7.3/>`__,`1.5.1 <https://pypi.org/project/mmif-python/1.5.1/>`__,`1.2.0 <https://mmif.clams.ai/1.2.0/>`__
`1.7.2 <https://pypi.org/project/clams-python/1.7.2/>`__,`1.5.1 <https://pypi.org/project/mmif-python/1.5.1/>`__,`1.2.0 <https://mmif.clams.ai/1.2.0/>`__
`1.7.1 <https://pypi.org/project/clams-python/1.7.1/>`__,`1.5.1 <https://pypi.org/project/mmif-python/1.5.1/>`__,`1.2.0 <https://mmif.clams.ai/1.2.0/>`__
`1.7.0 <https://pypi.org/project/clams-python/1.7.0/>`__,`1.5.0 <https://pypi.org/project/mmif-python/1.5.0/>`__,`1.2.0 <https://mmif.clams.ai/1.2.0/>`__
Expand Down
2 changes: 1 addition & 1 deletion pyproject.toml
Original file line numberDiff line numberDiff line change
Expand Up@@ -19,7 +19,7 @@ classifiers = [
"Programming Language :: Python :: 3 :: Only",
]
dependencies = [
"mmif-python==1.5.1",
"mmif-python==1.5.3",
"Flask>=2",
"Flask-RESTful>=0.3.9",
"gunicorn>=20",
Expand Down
22 changes: 22 additions & 0 deletions tests/test_promptable.py
Original file line numberDiff line numberDiff line change
Expand Up@@ -446,6 +446,28 @@ def test_non_thinking_output_safe_to_call(self):
self.assertEqual(answer, 'plain caption')
self.assertIsNone(trace)

def test_assume_open_close_present_open_absent(self):
# Prefilled opening tag (e.g. Qwen3.5): only the close tag is emitted.
answer, trace = self.split(
'reasoning body</think>The answer.', assume_open=True)
self.assertEqual(answer, 'The answer.')
self.assertEqual(trace, 'reasoning body')

def test_assume_open_no_close_is_unterminated_reasoning(self):
# Trace overran the budget before closing: empty answer, whole text is
# the unterminated trace.
raw = 'still thinking, never closed'
answer, trace = self.split(raw, assume_open=True)
self.assertEqual(answer, '')
self.assertEqual(trace, raw)

def test_open_absent_default_keeps_backward_compatible(self):
# Without assume_open, a lone close tag is not treated as a prefilled
# block: answer after the close, no trace.
answer, trace = self.split('reasoning body</think>The answer.')
self.assertEqual(answer, 'The answer.')
self.assertIsNone(trace)


# ---------------------------------------------------------------------------
# Transport-neutral parameter casting
Expand Down
Loading