Skip to content

MMIF CLI script documentation #348

Description

@marcverhagen

Documentation for CLI scripts is accessed in three ways:

  1. Using mmif --help.
  2. Using mmif subcommand --help.
  3. Online at https://clams.ai/mmif-python/1.2.1/cli.html.

The code for the scripts has a method describe_argparser() that generates a short and a long description, the short one is used for 1 and the long one for 2 and 3. Sometimes the code generates regular text for the long description (for mmif describe) and sometimes it generates restructured text (for all others).

The issue I see is that long regular text would be appropriate for 2 and restructured text (or markdown) for 3. At the moment, both 2 and 3 display raw text, whether it is restructured or not. For 3 the help is generated automatically using the long description from describe_argparser(), but it is printed in raw form. For 2 we sometimes get raw restructured text, which is hard to read.

I propose to work towards using three help strings:

  1. A short description for mmif --help.
  2. A long description for mmif subcommand --help.
  3. A long description in restructured text displayed properly at https://clams.ai/mmif-python/1.2.1/cli.html.

Personally I can do without 3. It would then be better to change the long string for mmif describe into regular text, but it would probably be less work.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    • Status
      Done

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions