Uh oh!
There was an error while loading. Please reload this page.
Flip LLP 0122 hermes design to Active (shipped via #339) - #340
Conversation
The hermes log-forwarding change set (LLP 0118-0125) shipped in PR #339, but the design-first flip to Active (LLP 0016 Shipped-is-Active) did not ride the implementation PR, so neutral implementable kept re-surfacing the design as owed-implementation. This lifecycle move marks it shipped.
philcunliffe
commented
Jul 21, 2026
Reviewed clean. Verified in a fresh detached worktree at Sanity-checked that Active is the correct status per LLP 0016 (Shipped-is-Active):
CI is green on the head commit. This is a clean lifecycle-only flip with no drift. Reviewed-clean. Next tick readied and held for a human merge. |
Uh oh!
There was an error while loading. Please reload this page.
Lifecycle-only follow-up: flips
llp/0122-hermes-log-forwarding.design.mdfrom Accepted to Active.The hermes log-forwarding change set (LLP 0118-0125) shipped in PR #339, but the design-first Accepted -> Active flip (LLP 0016 Shipped-is-Active) did not ride the implementation PR (plan 0123 had no flip task). As a result
neutral implementablekept re-surfacing the design as owed-implementation even though all code is already merged to master.This is a one-line lifecycle move, NOT new code or a re-implementation - the diff is exactly the status header. No code, tests, or other docs change.
Change-Set: hermes-log-forwarding