Uh oh!
There was an error while loading. Please reload this page.
- Notifications
You must be signed in to change notification settings - Fork 0
Phase C — E2E verification + gateway↔gnosis seam tests #98
Copy link
Copy link
Closed
Labels
majorMajor / load-bearing workMajor / load-bearing workrequirements-targetTracked requirements-target item (joint-close)Tracked requirements-target item (joint-close)
Description
Metadata
Metadata
Assignees
Labels
majorMajor / load-bearing workMajor / load-bearing workrequirements-targetTracked requirements-target item (joint-close)Tracked requirements-target item (joint-close)
Weeks 5–7. End-to-end tests across the gateway → unified-Zig-core (gnosis handler) boundary; the seam contract is honoured under policy.
Parent: standards#91 (ADR-0004 phase C). Single-channel: do not work out of phase order; A→B→C→D→E.