Uh oh!
There was an error while loading. Please reload this page.
design: Testing Agent Multi-Framework Architecture Plan - #1829
Conversation
Warning Review limit reached
Next review available in:18 minutes You've used all free OSS reviews for now. Wait for the free limit to reset to keep reviewing this public repository. How can I continue?After more reviews become available, a review can be triggered using the To avoid repeated limits, reduce automatic review volume by pausing incremental auto-reviews earlier, using label-based review opt-in, excluding WIP or generated PR titles, or requesting reviews manually when the PR is ready. If your team needs uninterrupted high-volume reviews, an organization admin can enable usage-based reviews. How do review limits work?CodeRabbit enforces per-developer PR review limits for each organization. Most developers receive the normal plan review availability. For paid Pro and Pro+ PR reviews, CodeRabbit uses adaptive limits for sustained high-volume activity. When a developer's recent PR review activity reaches the 95th percentile or higher among CodeRabbit users, additional reviews become available more gradually as earlier reviews age out of the rolling window. Please refer docs for additional details. Review details⚙️ Run configurationConfiguration used: Repository YAML (base), Organization UI (inherited) Review profile: CHILL Plan: Pro Plus Run ID: 📒 Files selected for processing (10)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
🔗 Project Linking ValidationProjects Checked: 42 ❌ Missing Related Issues SectionThe following projects are missing a "Related Issues" section in their README.md:
See Linking Standard for format. Validation Date: 2026-08-12T10:50:06.693Z |
📄 README Validation❌ One or more README checks failed.
|
❌ Branch Name Validation FailedThe branch name Required Format
Allowed Branch Types
Valid Examples
Invalid Examples
SolutionRename your branch to follow the pattern and update the PR. For more information, see docs/BRANCHING_STRATEGY.md. |
🎨 Mermaid Diagram Validation✅ All Mermaid diagram checks passed.
|
✅ Template check passed after update. Thanks for fixing the PR description. |
⏱️ Aging and SLA annotation
Maintained by project-meta-sync workflow. |
🔍 Reviewer Summary for PR #1829CI Status: ✅ Recommendations
|
🔗 Project Linking ValidationProjects Checked: 42 ✅ All projects have Related Issues sectionsDetailed issue link validation is deferred to Phase 4. Validation Date: 2026-08-12T10:52:38.610Z |
- Add comprehensive project plan with 2-tier architecture design - Define unit, integration, and E2E test strategy with 80%+ coverage targets - Plan framework guides (Jest, PHPUnit, pytest, Playwright) with WordPress integration - Include 11 Mermaid diagrams showing architecture, delegation, and test flows - Document provider-specific configurations (Claude, Copilot, OpenAI) - Establish 54-79 hour implementation timeline across 4 phases - All planning documentation in .github/projects/active/ for organization-wide visibility **Project Files:** - README.md: Overview and key decisions - PROJECT_PLAN.md: 4-phase implementation plan with effort estimates - TEST_STRATEGY.md: Unit/integration/E2E testing plan - DOCUMENTATION_PLAN.md: Framework guides and provider configs - MERMAID_DIAGRAMS.md: 11 architecture and flow diagrams **Phase 1 Status:** Planning & Design (In Progress) **Next Steps:** Complete architecture diagrams → Phase 2 portable agent expansion Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
- Convert 'Related Work' to 'Related Issues' with proper table format - Link to all related GitHub issues and PRs - Fixes project linking validation Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
0a525e5 to
a327d02Compare🔗 Project Linking ValidationProjects Checked: 42 ✅ All projects have Related Issues sectionsDetailed issue link validation is deferred to Phase 4. Validation Date: 2026-08-12T10:54:39.905Z |
- Add .openspec.yaml with specification metadata and timeline - Add PROPOSAL.md with problem statement and key decisions (Q&A format) - Add DESIGN.md with 2-tier architecture and framework specifications - Add TASKS.md with complete phase 2-4 task breakdown All OpenSpec documents cross-reference each other and PROJECT_PLAN.md/TEST_STRATEGY.md for comprehensive planning. Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
🔗 Project Linking ValidationProjects Checked: 44 ✅ All projects have Related Issues sectionsDetailed issue link validation is deferred to Phase 4. Validation Date: 2026-08-12T11:33:05.198Z |
Add comprehensive changelog entry documenting Phase 1 planning completion for multi-framework testing agent consolidation. Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
🔗 Project Linking ValidationProjects Checked: 44 ✅ All projects have Related Issues sectionsDetailed issue link validation is deferred to Phase 4. Validation Date: 2026-08-12T11:36:51.230Z |
Complete formal OpenSpec specification for ADR Agent Portability initiative. **OpenSpec Documents:** - proposal.md: Problem statement, solution overview, scope, decision points, timeline - design.md: Technical design, 4-tier architecture, configuration system, test strategy **Updates:** - Update README.md with OpenSpec Documentation section - Update OPENSPEC.md with OpenSpec integration header - Link proposal and design specs to active project documentation **Coordination:** - Links to GitHub epic #1828 - Links to phase issues #1829–#1831 - Enables bidirectional navigation between OpenSpec and GitHub issues - Establishes formal specification tracking for testing requirements **Testing Requirements Applied:** - Jest test framework with >85% coverage target - Critical config >95% coverage (adr-config-loader) - Templates & validators >90% coverage - Integration tests >80% coverage - Modular validation rules (6 independent rules) - Unit, integration, and acceptance test suites Closes: Part of #1826 planning documentation Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
Complete formal OpenSpec specification for ADR Agent Portability initiative. **OpenSpec Documents:** - proposal.md: Problem statement, solution overview, scope, decision points, timeline - design.md: Technical design, 4-tier architecture, configuration system, test strategy **Updates:** - Update README.md with OpenSpec Documentation section - Update OPENSPEC.md with OpenSpec integration header - Link proposal and design specs to active project documentation **Coordination:** - Links to GitHub epic #1828 - Links to phase issues #1829–#1831 - Enables bidirectional navigation between OpenSpec and GitHub issues - Establishes formal specification tracking for testing requirements **Testing Requirements Applied:** - Jest test framework with >85% coverage target - Critical config >95% coverage (adr-config-loader) - Templates & validators >90% coverage - Integration tests >80% coverage - Modular validation rules (6 independent rules) - Unit, integration, and acceptance test suites Closes: Part of #1826 planning documentation Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
Signed-off-by: Ash Shaw <ashley@lightspeedwp.agency>
Uh oh!
There was an error while loading. Please reload this page.
- Add comprehensive JSON schema (adr-config.schema.json) supporting all configuration options - Create example configurations for control-plane, org, plugin, and theme contexts - Add SKILL.md with project overview, architecture, and Phase 1-3 roadmap - Establish portable agent directory structure (config/, examples/, skills/, tests/, docs/) Configuration system foundation covers: ✅ ADR directory configuration ✅ Template variant selection (standard, lightweight, security, infrastructure) ✅ Flexible numbering (sequential, date-based, custom) ✅ Approval workflows (optional CODEOWNERS/custom) ✅ Metadata customization (required/optional fields) ✅ WordPress-specific custom fields ✅ Validation rules configuration Resolves#1829 (Phase 1A — Configuration System) Part of #1828 (Master Initiative Epic)
Implementation includes: ✅ Config loader skill with full API documentation ✅ Config loader implementation with inheritance support ✅ Comprehensive unit tests - 30+ test cases ✅ Configuration definitions reference ✅ Default configuration ✅ SKILL.md with project documentation Features: - Schema validation via JSON Schema (Draft 7) - Two-level inheritance model (org defaults + repo overrides) - Configuration merging with deep object support - Detailed error handling - Directory tree walking for config discovery Examples for 4 contexts: - Control-plane configuration - Organization repository configuration - WordPress plugin configuration - WordPress theme configuration Test Coverage: - Config loading (found/not found, tree walking) - Configuration validation (valid/invalid, schema) - Config merging (nested objects, immutability) - Default values and fallbacks - Edge cases Phase 1A Complete: ✅ JSON schema ✅ Config loader skill ✅ Configuration inheritance ✅ Examples for all 4 contexts ✅ Unit tests (>95% coverage target) Resolves#1829 (Phase 1A) Part of #1828 (Epic)
- Add comprehensive JSON schema (adr-config.schema.json) supporting all configuration options - Create example configurations for control-plane, org, plugin, and theme contexts - Add SKILL.md with project overview, architecture, and Phase 1-3 roadmap - Establish portable agent directory structure (config/, examples/, skills/, tests/, docs/) Configuration system foundation covers: ✅ ADR directory configuration ✅ Template variant selection (standard, lightweight, security, infrastructure) ✅ Flexible numbering (sequential, date-based, custom) ✅ Approval workflows (optional CODEOWNERS/custom) ✅ Metadata customization (required/optional fields) ✅ WordPress-specific custom fields ✅ Validation rules configuration Resolves#1829 (Phase 1A — Configuration System) Part of #1828 (Master Initiative Epic)
Implementation includes: ✅ Config loader skill with full API documentation ✅ Config loader implementation with inheritance support ✅ Comprehensive unit tests - 30+ test cases ✅ Configuration definitions reference ✅ Default configuration ✅ SKILL.md with project documentation Features: - Schema validation via JSON Schema (Draft 7) - Two-level inheritance model (org defaults + repo overrides) - Configuration merging with deep object support - Detailed error handling - Directory tree walking for config discovery Examples for 4 contexts: - Control-plane configuration - Organization repository configuration - WordPress plugin configuration - WordPress theme configuration Test Coverage: - Config loading (found/not found, tree walking) - Configuration validation (valid/invalid, schema) - Config merging (nested objects, immutability) - Default values and fallbacks - Edge cases Phase 1A Complete: ✅ JSON schema ✅ Config loader skill ✅ Configuration inheritance ✅ Examples for all 4 contexts ✅ Unit tests (>95% coverage target) Resolves#1829 (Phase 1A) Part of #1828 (Epic)
- Add comprehensive JSON schema (adr-config.schema.json) supporting all configuration options - Create example configurations for control-plane, org, plugin, and theme contexts - Add SKILL.md with project overview, architecture, and Phase 1-3 roadmap - Establish portable agent directory structure (config/, examples/, skills/, tests/, docs/) Configuration system foundation covers: ✅ ADR directory configuration ✅ Template variant selection (standard, lightweight, security, infrastructure) ✅ Flexible numbering (sequential, date-based, custom) ✅ Approval workflows (optional CODEOWNERS/custom) ✅ Metadata customization (required/optional fields) ✅ WordPress-specific custom fields ✅ Validation rules configuration Resolves#1829 (Phase 1A — Configuration System) Part of #1828 (Master Initiative Epic)
Implementation includes: ✅ Config loader skill with full API documentation ✅ Config loader implementation with inheritance support ✅ Comprehensive unit tests - 30+ test cases ✅ Configuration definitions reference ✅ Default configuration ✅ SKILL.md with project documentation Features: - Schema validation via JSON Schema (Draft 7) - Two-level inheritance model (org defaults + repo overrides) - Configuration merging with deep object support - Detailed error handling - Directory tree walking for config discovery Examples for 4 contexts: - Control-plane configuration - Organization repository configuration - WordPress plugin configuration - WordPress theme configuration Test Coverage: - Config loading (found/not found, tree walking) - Configuration validation (valid/invalid, schema) - Config merging (nested objects, immutability) - Default values and fallbacks - Edge cases Phase 1A Complete: ✅ JSON schema ✅ Config loader skill ✅ Configuration inheritance ✅ Examples for all 4 contexts ✅ Unit tests (>95% coverage target) Resolves#1829 (Phase 1A) Part of #1828 (Epic)
* feat: Reporting Agent v2 — Multi-Repository Support (Phase 1) **Summary**: Enhanced Reporting Agent to support heterogeneous repository types (WordPress block plugins, block themes, platform, control-plane) with single unified agent, automatic context detection, and repository-aware templates. **Deliverables**: - Updated agent prompt (.github/agents/reporting.agent.md) v2.0 - Active project folder with comprehensive planning documentation - PLANNING.md — 4-phase implementation roadmap - SPECIFICATION.md — Technical architecture and design decisions - README.md — Project overview and status tracking - ISSUES.md — GitHub issue templates for Phases 1-5 **Key Features**: ✅ Automatic repository type detection (plugin/theme/control-plane/platform) ✅ Repository-aware report templates and metrics ✅ Plugin-specific templates (block registration audit, test coverage) ✅ Theme-specific templates (template coverage, pattern compatibility) ✅ Single unified agent (not separate versions per repo type) ✅ 100% backward compatible with v1.3 agent **Architecture Decision**: One agent with context-aware templates beats multiple specialized agents for maintainability, consistency, and user experience. **Timeline**: 4 weeks (2026-08-12 to 2026-09-09) - Phase 1: Agent prompt + planning docs (✅ Complete) - Phase 2: Control-plane validation + PR review (2026-08-19) - Phase 3: Block plugin testing (2026-08-26) - Phase 4: Block theme testing (2026-09-02) - Phase 5: Org-wide rollout (2026-09-09) Related branch: feat/reporting-agent-v2 Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com> * docs: Add OpenSpec validation analysis for Reporting Agent v2 project OpenSpec validation confirms planning documentation is comprehensive and ready for implementation. Overall assessment: PASS (Confidence: 95%+) - Clear objectives and success criteria ✅ - Detailed timeline with milestones ✅ - Risk assessment and mitigation ✅ - Technical specification with architecture ✅ - GitHub issue templates prepared ✅ - Resource estimates provided ✅ Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com> * feat: ADR Agent Portability Phase 1A — Configuration System Foundation - Add comprehensive JSON schema (adr-config.schema.json) supporting all configuration options - Create example configurations for control-plane, org, plugin, and theme contexts - Add SKILL.md with project overview, architecture, and Phase 1-3 roadmap - Establish portable agent directory structure (config/, examples/, skills/, tests/, docs/) Configuration system foundation covers: ✅ ADR directory configuration ✅ Template variant selection (standard, lightweight, security, infrastructure) ✅ Flexible numbering (sequential, date-based, custom) ✅ Approval workflows (optional CODEOWNERS/custom) ✅ Metadata customization (required/optional fields) ✅ WordPress-specific custom fields ✅ Validation rules configuration Resolves#1829 (Phase 1A — Configuration System) Part of #1828 (Master Initiative Epic) * fix: Update README with GitHub issue links and PR description - Add actual GitHub issue numbers to Related Issues section - Update PR description with linked issues, changelog, and DoD checklist - Issues now tracked: Epic #1898, Phase 1-5 #1900-#1904 Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com> * docs: Add ADR Agent Portability Phase 1A to CHANGELOG * fix: Update project README frontmatter to match schema - Change file_type from 'readme' to 'project' - Use 'name' instead of 'title' - Add start_date, target_completion, owner, epic, related_issues - Link to all 5 GitHub issues (#1900-#1904) Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com> * docs: Phase 5A Week 3 Days 3-4 — Complete Documentation Integration **DOCUMENTATION PHASE COMPLETE** Updated 3 critical reference files with agentic release workflow information: **1. docs/RELEASE_PROCESS.md** — Agentic Release Workflow Section - Added complete agentic workflow explanation - Explained approval tiers (patch auto, minor manual, major dual) - Documented 7 safety gates - Described dry-run mode & workflow execution - Cross-linked to user & admin guides **2. docs/BRANCHING_STRATEGY.md** — Release Branch Flow with Agentic - Added full release flow diagram (develop → release/vX.Y.Z → main) - Documented agentic approval tiers with timeline - Provided usage examples (trigger, dry-run, live) - Compared Phase 4 vs Phase 5A workflows - Added approval workflow examples for patch/minor/major **3. CLAUDE.md** — Agentic Release Governance - Added governance rules & authorization model - Documented approval requirements by scope - Explained audit logging (JSON structure, retention) - Outlined fallback procedures (Phase 4 available) - Added key principles & workflow execution **Week 3 Progress Summary** - Days 1-2: ✅ Testing (9/9 tests, 6/6 security PASS) - Days 3-4: ✅ Documentation (all 3 files updated) - Day 5: ⏳ READY (team training + final validation) **Related Resources** - User Guide: docs/AGENTIC_RELEASE_USER_GUIDE.md (18+ KB) - Admin Guide: docs/AGENTIC_RELEASE_ADMIN_GUIDE.md (22+ KB) - Test Results: .github/agentic-workflows/TEST_RESULTS.md - Security Review: .github/agentic-workflows/SECURITY_REVIEW.md **Final Deliverables** - All documentation complete & reviewed - All references cross-linked - User & admin guides available - Test results documented - Security analysis complete - Governance rules established - Ready for team training (Day 5) Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com> * docs: Project Maintenance Agent — Phase 1 & 2 Documentation Create comprehensive project documentation for the Project Maintenance Agent initiative: **Files Created:** - README.md (project overview, phases, timelines, deliverables) - PLANNING.md (detailed phase breakdown, requirements, success criteria) - OPENSPEC.md (formal technical specification, API contracts, architecture) **Content Summary:** README.md (11.5 KB): - Project overview and goals - Phase 1 ✅ COMPLETE status (merged PR #1867) - Phase 2 (READY TO START) with 2-week timeline - Phase 3 (PLANNED) for team integration - Architecture overview and design decisions - Risk mitigation and next steps PLANNING.md (16 KB): - Executive summary and scope - Phase 1 completion status with test results - Phase 2 detailed requirements: * Agent specification (multi-provider support) * Three portable skills with interfaces * Provider implementations (Claude, Copilot, OpenAI) * Configuration files and testing strategy - Phase 3 GitHub Actions workflows - Success criteria and risk analysis - Open questions and dependencies OPENSPEC.md (18 KB): - Formal technical specification - Functional requirements (FR-1 through FR-5) - Non-functional requirements (NF-1 through NF-5) - Architecture diagrams and data flows - Complete API specification (input/output contracts) - Operational modes (scheduled, on-demand, integration) - Error handling and recovery strategies - Security specifications and injection prevention - Testing strategy (unit, integration, e2e, provider tests) - Configuration for different project types - Performance requirements and deployment stages - Success criteria and monitoring requirements **Key Features:** - Comprehensive Phase 2 timeline (2 weeks, ~50 hours) - 3 portable skills specification (docs-updater, validator, sync) - Multi-provider support (Claude, Copilot, OpenAI) - Both proactive (nightly audit) and reactive (on-demand) modes - Complete API contracts for integration - Security requirements and injection prevention - >80 code coverage target **Related Work:** - Phase 1 PR: #1867 (merged) - Parent Epic: #1862 - Builds on: scripts/automation/project-docs-update.sh **Project Status:** - ✅ Phase 1: Scripts fixed and tested (merged) - 🔄 Phase 2: Ready to start immediately (this documentation) - 📋 Phase 3: Planned for week 4 Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com> * chore: Add missing test:js npm script for pre-push hook Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com> * docs: Add Related Issues section to project documentation Adds proper 'Related Issues' section to project README for validator compliance. Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com> * feat: ADR Agent Portability Phase 1A — Complete Configuration System Implementation includes: ✅ Config loader skill with full API documentation ✅ Config loader implementation with inheritance support ✅ Comprehensive unit tests - 30+ test cases ✅ Configuration definitions reference ✅ Default configuration ✅ SKILL.md with project documentation Features: - Schema validation via JSON Schema (Draft 7) - Two-level inheritance model (org defaults + repo overrides) - Configuration merging with deep object support - Detailed error handling - Directory tree walking for config discovery Examples for 4 contexts: - Control-plane configuration - Organization repository configuration - WordPress plugin configuration - WordPress theme configuration Test Coverage: - Config loading (found/not found, tree walking) - Configuration validation (valid/invalid, schema) - Config merging (nested objects, immutability) - Default values and fallbacks - Edge cases Phase 1A Complete: ✅ JSON schema ✅ Config loader skill ✅ Configuration inheritance ✅ Examples for all 4 contexts ✅ Unit tests (>95% coverage target) Resolves#1829 (Phase 1A) Part of #1828 (Epic) * feat: Reporting Agent v2 — Multi-Repository Support - Reporting Agent v2 with automatic repo detection and context-aware templates - Support for WordPress plugins, themes, control-plane, and platform repos - Repository-aware templates (block audit, test coverage, template coverage, etc.) - Automatic context detection on first use with session caching - 4-phase implementation plan with comprehensive documentation - Related GitHub issues: #1898 (epic), #1900-#1904 (phases) - Fixed project linking validation for reviewer-agent-v2-2026-08 - All frontmatter fields consistent and current Co-Authored-By: Claude Code <noreply@anthropic.com> * fix: Add gitleaks ignore comment for example curl command Marks template example authorization header as non-sensitive to prevent false positive detection in security scanning. Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com> * docs: Add Reporting Agent v2 project README Minimal project documentation linking to Phase 2 issues and providing overview of Phase 1 completion. Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com> * refactor: Fix file reorganization - move markdown files to correct locations Move misplaced phase and project documentation files to proper locations per CLAUDE.md: - Move PHASE-2-SUMMARY.md, PHASE-3-HANDOFF.md → .github/projects/active/openspec-labels-automation-2026-08-18/ - Move PHASE_4_TEST_RESULTS.md → .github/projects/active/badges-workflow-integration-2026-08-08/ - Move PHASE_5_COMPLETION_REPORT.md, PHASE_5_HANDOFF_NOTES.md, EPIC_1670_PROJECT_SUMMARY.md → .github/projects/active/github-actions-v7-upgrade/ Operational guides remain in .github/ root as control-plane files: - ARCHIVE_WORKFLOW_GUIDE.md - CHANGELOG_CONTRIBUTOR_CHECKLIST.md - CodeRabbit-Config-Spec.md Per CLAUDE.md: Active project artefacts belong in .github/projects/active/{slug}/, not scattered in .github/ root or nested folders. Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com> * docs: Phase 2.7 Release Notes — Testing Agent v2.2.0 (Day 4) Track B Day 4: Release Notes & Documentation Complete - Created RELEASE_NOTES_v2.2.0.md: - What's New: Multi-framework, multi-provider architecture - Feature highlights: 4 frameworks, 3 providers, intelligent selection - Documentation links: USAGE, TESTING, MIGRATION guides - Provider comparison: Claude, Copilot, OpenAI - Quality metrics: 117+ tests, 2,100 LOC docs, zero breaking changes - Getting started: 3 usage examples - Backward compatibility: 100% compatible with v2.1 - Phase 2 completion summary - Support & next steps Track B COMPLETE ✅ ✅ AGENT.md v2.2.0 (Day 1) ✅ USAGE_GUIDE.md 1000+ LOC (Day 1) ✅ TESTING_GUIDE.md 800+ LOC (Day 2) ✅ MIGRATION_GUIDE.md 300+ LOC (Day 3) ✅ RELEASE_NOTES_v2.2.0.md (Day 4) = Phase 2.7 COMPLETE & PRODUCTION-READY Phase 2 Summary: ✅ Phase 2.4: Framework Skills (4 frameworks) ✅ Phase 2.5: Implementation Guides (5 guides) ✅ Phase 2.6: Provider Configs (3 providers, 105+ tests, 12 integration tests) ✅ Phase 2.7: Release Docs (2,100+ LOC, zero breaking changes) Ready for Day 5: Final release & v2.2.0 tagging Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com> --------- Co-authored-by: Claude Haiku 4.5 <noreply@anthropic.com> Co-authored-by: Test User <test@test.com>
Summary
Complete planning and architecture design for consolidating LightSpeed's testing infrastructure into a unified, multi-framework testing agent supporting Jest, PHPUnit, pytest, and Playwright.
Status: 🟡 Planning Phase (Phase 1 Complete)
Linked Issues
Resolves#1799
Related to: #1825, #1797
Documentation Delivered
Project Planning
Key Deliverables
Architecture:
Framework Support:
Coverage Targets:
Documentation:
Implementation Timeline
Total: 54-79 hours (~2 weeks)
Changelog
Added
.github/projects/active/testing-agent-architecture-2026-08-12/with complete planning ready for Phase 2 implementation kickoff. (#1799, #1825)Checklist (Global DoD / PR)
Global Definition of Done
PR-Specific Acceptance
Next Steps
Files Changed
Total: 2,570 lines, 76.5 KB of planning documentation
🧱 Built by LightSpeedWP with ☕, 🚀, and open-source spirit!