Skip to content

Pull requests: openshift/osdctl

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobodyLoading
Sort

Pull requests list

Adding r7i as approved infra type
#949 opened Aug 17, 2026 by PeterCSRELoading…
ROSAENG-65404: remove COPR from release automation approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. kind/cleanup Categorizes issue or PR as related to cleaning up code, process, or technical debt. requires-manual-review Review requires human judgment
#948 opened Aug 14, 2026 by dustman9000MemberLoading…
fix(#943): handle GCP PSC clusters in break-glass cleanup ok-to-test Indicates a non-member PR verified by an org member that is safe to test.
#944 opened Aug 4, 2026 by fullsend-ai-coderBotLoading…
5 tasks done
fix(#941): support PagerDuty incident lookup for HCP clusters ok-to-test Indicates a non-member PR verified by an org member that is safe to test.
#942 opened Aug 4, 2026 by fullsend-ai-coderBotLoading…
5 tasks done
fix: support PSC cluster cleanup in break-glass approved Indicates a PR has been approved by an approver from all required OWNERS files. kind/bug Categorizes issue or PR as related to a bug. ready-for-merge All reviewers approved — ready to merge
#929 opened Jul 6, 2026 by RaphaelButContributorLoading…
Make report-id optional for cluster reports get approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#926 opened Jun 24, 2026 by geowa4ContributorLoading…
add srelib poc approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#922 opened Jun 16, 2026 by petrkotasMember Draft
ROSAENG-14080: Support MC/SC cluster ID usage with hcp-mustgathers approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#914 opened Jun 9, 2026 by MateSaaryContributorLoading…
SREP-715: Using the new --dump-guest-cluster-through-kube-service option of the hypershift CLI when dumping dataplane content for must-gathers approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#883 opened Apr 30, 2026 by Nikokolas3270Contributor Draft
Fix Grafana log links in osdctl promote by discovering namespace and SaaS file names do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#853 opened Feb 22, 2026 by xiaoyu74ContributorLoading…
ProTip! Add no:assignee to see everything that’s not assigned.