twister + calendars: cancelled occurrence semantics - #130

Merged
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences
Apr 30, 2026
Merged

twister + calendars: cancelled occurrence semantics#130
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences

Conversation

@KrisBraun

Copy link
Copy Markdown
Contributor

Renames NewScheduleOccurrence.archived to cancelled, and updates the three calendar connectors (google, apple, outlook) to emit cancelled: true on per-instance cancellations. archived overloaded the meaning — elsewhere on schedules it means "hide this entity"; on occurrences it actually meant "this date won't happen in the series". The new field name matches upstream calendar APIs (Google status: "cancelled", Microsoft isCancelled, iCalendar STATUS:CANCELLED).

The Plot runtime keeps translating cancelled: true into an addition to the parent schedule's recurrence_exdates — the canonical storage representation for skipped dates — so connectors stay stateless about the parent series and don't need to compute exdate updates themselves. For one release, archived: true on an occurrence is still accepted as a deprecated alias and emits a console warning. The bulk NewSchedule.recurrenceExdates field is unchanged and remains the right shape for seeding a master schedule's full EXDATE list at initial sync (apple/outlook ICS/Graph master parse paths).

Also bundled here: order-independent end-of-batch pending_occ drain in google-calendar (and a flush-leftovers behavior at full-pass cleanup that forwards orphaned pending occurrences to saveLinks rather than silently discarding them). The previous inline drain at master-processing time missed instances that arrived after their master in the same batch, and after the cancelled-semantics switch every dropped cancellation is more user-visible.

Renames NewScheduleOccurrence.archived to cancelled, and updates the
three calendar connectors (google, apple, outlook) to emit `cancelled:
true` on per-instance cancellations. `archived` overloaded the meaning
— elsewhere on schedules it means "hide this entity"; on occurrences
it actually meant "this date won't happen in the series". The new
field name matches upstream calendar APIs (Google `status: "cancelled"`,
Microsoft `isCancelled`, iCalendar `STATUS:CANCELLED`).
The Plot runtime keeps translating `cancelled: true` into an addition
to the parent schedule's recurrence_exdates — the canonical storage
representation for skipped dates — so connectors stay stateless about
the parent series and don't need to compute exdate updates themselves.
For one release, `archived: true` on an occurrence is still accepted
as a deprecated alias and emits a console warning. The bulk
NewSchedule.recurrenceExdates field is unchanged and remains the
right shape for seeding a master schedule's full EXDATE list at
initial sync (apple/outlook ICS/Graph master parse paths).
Also bundled here: order-independent end-of-batch pending_occ drain
in google-calendar (and a flush-leftovers behavior at full-pass
cleanup that forwards orphaned pending occurrences to saveLinks
rather than silently discarding them). The previous inline drain at
master-processing time missed instances that arrived after their
master in the same batch, and after the cancelled-semantics switch
every dropped cancellation is more user-visible.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@KrisBraun
KrisBraun merged commit 83257b5 into mainApr 30, 2026
1 check passed
@KrisBraun
KrisBraun deleted the cancelled-occurrences branch April 30, 2026 02:54
@github-actionsgithub-actionsBot mentioned this pull request Apr 30, 2026
Sign up for freeto join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant

@KrisBraun
, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Add copy buttons to all
 blocks\n(function() {\n function addCopyButtons() {\n document.querySelectorAll('pre code').forEach(function(codeBlock) {\n if (codeBlock.parentElement.hasAttribute('data-copy-added')) return;\n codeBlock.parentElement.setAttribute('data-copy-added', 'true');\n \n var btn = document.createElement('button');\n btn.textContent = 'Copy';\n btn.style.cssText = 'position:absolute;top:4px;right:4px;padding:2px 8px;font-size:11px;background:#4ecdc4;border:none;border-radius:4px;color:#1a1a2e;cursor:pointer;opacity:0.7;transition:opacity 0.2s;';\n btn.onmouseover = function() { this.style.opacity = '1'; };\n btn.onmouseout = function() { this.style.opacity = '0.7'; };\n btn.onclick = function() {\n navigator.clipboard.writeText(codeBlock.textContent).then(function() {\n btn.textContent = 'Copied!';\n setTimeout(function() { btn.textContent = 'Copy'; }, 1500);\n });\n };\n codeBlock.parentElement.style.position = 'relative';\n codeBlock.parentElement.appendChild(btn);\n });\n }\n \n addCopyButtons();\n \n // Re-run on dynamic content\n var observer = new MutationObserver(addCopyButtons);\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "Add Copy Buttons to Code Blocks");
}
} catch(__e) { console.warn('[Userscript:Add Copy Buttons to Code Blocks]', __e); }
})();
(function(){
try {
var __m = "github.com";
var __re = new RegExp('^' + "github\\.com" + '
Skip to content

twister + calendars: cancelled occurrence semantics - #130

Merged
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences
Apr 30, 2026
Merged

twister + calendars: cancelled occurrence semantics#130
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences

Conversation

@KrisBraun

Copy link
Copy Markdown
Contributor

Renames NewScheduleOccurrence.archived to cancelled, and updates the three calendar connectors (google, apple, outlook) to emit cancelled: true on per-instance cancellations. archived overloaded the meaning — elsewhere on schedules it means "hide this entity"; on occurrences it actually meant "this date won't happen in the series". The new field name matches upstream calendar APIs (Google status: "cancelled", Microsoft isCancelled, iCalendar STATUS:CANCELLED).

The Plot runtime keeps translating cancelled: true into an addition to the parent schedule's recurrence_exdates — the canonical storage representation for skipped dates — so connectors stay stateless about the parent series and don't need to compute exdate updates themselves. For one release, archived: true on an occurrence is still accepted as a deprecated alias and emits a console warning. The bulk NewSchedule.recurrenceExdates field is unchanged and remains the right shape for seeding a master schedule's full EXDATE list at initial sync (apple/outlook ICS/Graph master parse paths).

Also bundled here: order-independent end-of-batch pending_occ drain in google-calendar (and a flush-leftovers behavior at full-pass cleanup that forwards orphaned pending occurrences to saveLinks rather than silently discarding them). The previous inline drain at master-processing time missed instances that arrived after their master in the same batch, and after the cancelled-semantics switch every dropped cancellation is more user-visible.

Renames NewScheduleOccurrence.archived to cancelled, and updates the
three calendar connectors (google, apple, outlook) to emit `cancelled:
true` on per-instance cancellations. `archived` overloaded the meaning
— elsewhere on schedules it means "hide this entity"; on occurrences
it actually meant "this date won't happen in the series". The new
field name matches upstream calendar APIs (Google `status: "cancelled"`,
Microsoft `isCancelled`, iCalendar `STATUS:CANCELLED`).
The Plot runtime keeps translating `cancelled: true` into an addition
to the parent schedule's recurrence_exdates — the canonical storage
representation for skipped dates — so connectors stay stateless about
the parent series and don't need to compute exdate updates themselves.
For one release, `archived: true` on an occurrence is still accepted
as a deprecated alias and emits a console warning. The bulk
NewSchedule.recurrenceExdates field is unchanged and remains the
right shape for seeding a master schedule's full EXDATE list at
initial sync (apple/outlook ICS/Graph master parse paths).
Also bundled here: order-independent end-of-batch pending_occ drain
in google-calendar (and a flush-leftovers behavior at full-pass
cleanup that forwards orphaned pending occurrences to saveLinks
rather than silently discarding them). The previous inline drain at
master-processing time missed instances that arrived after their
master in the same batch, and after the cancelled-semantics switch
every dropped cancellation is more user-visible.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@KrisBraun
KrisBraun merged commit 83257b5 into mainApr 30, 2026
1 check passed
@KrisBraun
KrisBraun deleted the cancelled-occurrences branch April 30, 2026 02:54
@github-actionsgithub-actionsBot mentioned this pull request Apr 30, 2026
Sign up for freeto join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant

@KrisBraun
, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Force GitHub README to respect dark mode\n(function() {\n var style = document.createElement('style');\n style.textContent = '\n .markdown-body {\n color-scheme: dark light;\n }\n .markdown-body pre { background: #161b22 !important; }\n .markdown-body code { background: rgba(110, 118, 129, 0.4) !important; }\n .markdown-body table th, .markdown-body table td { border-color: #30363d !important; }\n .markdown-body img { background: #0d1117; }\n .markdown-body blockquote { border-left-color: #8b949e; }\n .markdown-body hr { border-color: #30363d; }\n ';\n document.head.appendChild(style);\n})();", "GitHub Dark Mode README Fix"); } } catch(__e) { console.warn('[Userscript:GitHub Dark Mode README Fix]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
Skip to content

twister + calendars: cancelled occurrence semantics - #130

Merged
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences
Apr 30, 2026
Merged

twister + calendars: cancelled occurrence semantics#130
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences

Conversation

@KrisBraun

Copy link
Copy Markdown
Contributor

Renames NewScheduleOccurrence.archived to cancelled, and updates the three calendar connectors (google, apple, outlook) to emit cancelled: true on per-instance cancellations. archived overloaded the meaning — elsewhere on schedules it means "hide this entity"; on occurrences it actually meant "this date won't happen in the series". The new field name matches upstream calendar APIs (Google status: "cancelled", Microsoft isCancelled, iCalendar STATUS:CANCELLED).

The Plot runtime keeps translating cancelled: true into an addition to the parent schedule's recurrence_exdates — the canonical storage representation for skipped dates — so connectors stay stateless about the parent series and don't need to compute exdate updates themselves. For one release, archived: true on an occurrence is still accepted as a deprecated alias and emits a console warning. The bulk NewSchedule.recurrenceExdates field is unchanged and remains the right shape for seeding a master schedule's full EXDATE list at initial sync (apple/outlook ICS/Graph master parse paths).

Also bundled here: order-independent end-of-batch pending_occ drain in google-calendar (and a flush-leftovers behavior at full-pass cleanup that forwards orphaned pending occurrences to saveLinks rather than silently discarding them). The previous inline drain at master-processing time missed instances that arrived after their master in the same batch, and after the cancelled-semantics switch every dropped cancellation is more user-visible.

Renames NewScheduleOccurrence.archived to cancelled, and updates the
three calendar connectors (google, apple, outlook) to emit `cancelled:
true` on per-instance cancellations. `archived` overloaded the meaning
— elsewhere on schedules it means "hide this entity"; on occurrences
it actually meant "this date won't happen in the series". The new
field name matches upstream calendar APIs (Google `status: "cancelled"`,
Microsoft `isCancelled`, iCalendar `STATUS:CANCELLED`).
The Plot runtime keeps translating `cancelled: true` into an addition
to the parent schedule's recurrence_exdates — the canonical storage
representation for skipped dates — so connectors stay stateless about
the parent series and don't need to compute exdate updates themselves.
For one release, `archived: true` on an occurrence is still accepted
as a deprecated alias and emits a console warning. The bulk
NewSchedule.recurrenceExdates field is unchanged and remains the
right shape for seeding a master schedule's full EXDATE list at
initial sync (apple/outlook ICS/Graph master parse paths).
Also bundled here: order-independent end-of-batch pending_occ drain
in google-calendar (and a flush-leftovers behavior at full-pass
cleanup that forwards orphaned pending occurrences to saveLinks
rather than silently discarding them). The previous inline drain at
master-processing time missed instances that arrived after their
master in the same batch, and after the cancelled-semantics switch
every dropped cancellation is more user-visible.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@KrisBraun
KrisBraun merged commit 83257b5 into mainApr 30, 2026
1 check passed
@KrisBraun
KrisBraun deleted the cancelled-occurrences branch April 30, 2026 02:54
@github-actionsgithub-actionsBot mentioned this pull request Apr 30, 2026
Sign up for freeto join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant

@KrisBraun
, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Highlight search terms from Google/DuckDuckGo/Bing referrer\n(function() {\n var ref = document.referrer;\n var terms = [];\n \n if (ref.includes('google.com') || ref.includes('duckduckgo.com') || ref.includes('bing.com')) {\n var url = new URL(ref);\n var q = url.searchParams.get('q') || url.searchParams.get('p');\n if (q) {\n terms = q.split(/\\s+/).filter(function(t) { return t.length > 2; });\n }\n }\n \n if (terms.length === 0) return;\n \n var style = document.createElement('style');\n style.textContent = '.userscript-highlight { background: #fbbf24; color: #1a1a2e; padding: 1px 3px; border-radius: 2px; }';\n document.head.appendChild(style);\n \n function highlight(node) {\n if (node.nodeType === 3) { // text node\n var text = node.textContent;\n var found = false;\n terms.forEach(function(term) {\n var regex = new RegExp('(' + term.replace(/[.*+?^${}()|[\\]\\\\]/g, '\\\\') + ')', 'gi');\n if (regex.test(text)) {\n found = true;\n var frag = document.createDocumentFragment();\n var parts = text.split(regex);\n parts.forEach(function(part, i) {\n if (i % 2 === 0) {\n frag.appendChild(document.createTextNode(part));\n } else {\n var span = document.createElement('span');\n span.className = 'userscript-highlight';\n span.textContent = part;\n frag.appendChild(span);\n }\n });\n node.parentNode.replaceChild(frag, node);\n }\n });\n } else if (node.nodeType === 1 && node.childNodes) { // element\n var skipTags = ['SCRIPT', 'STYLE', 'NOSCRIPT', 'TEXTAREA', 'INPUT', 'SELECT'];\n if (!skipTags.includes(node.tagName)) {\n Array.from(node.childNodes).forEach(highlight);\n }\n }\n }\n \n highlight(document.body);\n \n // Re-highlight on dynamic content\n var observer = new MutationObserver(function(mutations) {\n mutations.forEach(function(m) {\n m.addedNodes.forEach(function(node) {\n if (node.nodeType === 1 || node.nodeType === 3) highlight(node);\n });\n });\n });\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "Highlight Search Terms"); } } catch(__e) { console.warn('[Userscript:Highlight Search Terms]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
Skip to content

twister + calendars: cancelled occurrence semantics - #130

Merged
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences
Apr 30, 2026
Merged

twister + calendars: cancelled occurrence semantics#130
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences

Conversation

@KrisBraun

Copy link
Copy Markdown
Contributor

Renames NewScheduleOccurrence.archived to cancelled, and updates the three calendar connectors (google, apple, outlook) to emit cancelled: true on per-instance cancellations. archived overloaded the meaning — elsewhere on schedules it means "hide this entity"; on occurrences it actually meant "this date won't happen in the series". The new field name matches upstream calendar APIs (Google status: "cancelled", Microsoft isCancelled, iCalendar STATUS:CANCELLED).

The Plot runtime keeps translating cancelled: true into an addition to the parent schedule's recurrence_exdates — the canonical storage representation for skipped dates — so connectors stay stateless about the parent series and don't need to compute exdate updates themselves. For one release, archived: true on an occurrence is still accepted as a deprecated alias and emits a console warning. The bulk NewSchedule.recurrenceExdates field is unchanged and remains the right shape for seeding a master schedule's full EXDATE list at initial sync (apple/outlook ICS/Graph master parse paths).

Also bundled here: order-independent end-of-batch pending_occ drain in google-calendar (and a flush-leftovers behavior at full-pass cleanup that forwards orphaned pending occurrences to saveLinks rather than silently discarding them). The previous inline drain at master-processing time missed instances that arrived after their master in the same batch, and after the cancelled-semantics switch every dropped cancellation is more user-visible.

Renames NewScheduleOccurrence.archived to cancelled, and updates the
three calendar connectors (google, apple, outlook) to emit `cancelled:
true` on per-instance cancellations. `archived` overloaded the meaning
— elsewhere on schedules it means "hide this entity"; on occurrences
it actually meant "this date won't happen in the series". The new
field name matches upstream calendar APIs (Google `status: "cancelled"`,
Microsoft `isCancelled`, iCalendar `STATUS:CANCELLED`).
The Plot runtime keeps translating `cancelled: true` into an addition
to the parent schedule's recurrence_exdates — the canonical storage
representation for skipped dates — so connectors stay stateless about
the parent series and don't need to compute exdate updates themselves.
For one release, `archived: true` on an occurrence is still accepted
as a deprecated alias and emits a console warning. The bulk
NewSchedule.recurrenceExdates field is unchanged and remains the
right shape for seeding a master schedule's full EXDATE list at
initial sync (apple/outlook ICS/Graph master parse paths).
Also bundled here: order-independent end-of-batch pending_occ drain
in google-calendar (and a flush-leftovers behavior at full-pass
cleanup that forwards orphaned pending occurrences to saveLinks
rather than silently discarding them). The previous inline drain at
master-processing time missed instances that arrived after their
master in the same batch, and after the cancelled-semantics switch
every dropped cancellation is more user-visible.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@KrisBraun
KrisBraun merged commit 83257b5 into mainApr 30, 2026
1 check passed
@KrisBraun
KrisBraun deleted the cancelled-occurrences branch April 30, 2026 02:54
@github-actionsgithub-actionsBot mentioned this pull request Apr 30, 2026
Sign up for freeto join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant

@KrisBraun
, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Strip utm_, fbclid, gclid, etc. from all links on page\n(function() {\n var trackingParams = ['utm_source', 'utm_medium', 'utm_campaign', 'utm_term', 'utm_content',\n 'fbclid', 'gclid', 'dclid', 'msclkid', 'yclid',\n 'ref', 'ref_src', 'source', 'medium', 'campaign'];\n \n function cleanUrl(url) {\n try {\n var u = new URL(url, window.location.origin);\n var changed = false;\n trackingParams.forEach(function(p) {\n if (u.searchParams.has(p)) {\n u.searchParams.delete(p);\n changed = true;\n }\n });\n return changed ? u.toString() : url;\n } catch (e) {\n return url;\n }\n }\n \n function cleanLinks() {\n document.querySelectorAll('a[href]').forEach(function(a) {\n var clean = cleanUrl(a.href);\n if (clean !== a.href) a.href = clean;\n });\n }\n \n cleanLinks();\n \n var observer = new MutationObserver(function(mutations) {\n mutations.forEach(function(m) {\n m.addedNodes.forEach(function(node) {\n if (node.nodeType === 1) {\n if (node.tagName === 'A') cleanLinks();\n node.querySelectorAll('a[href]').forEach(function(a) {\n var clean = cleanUrl(a.href);\n if (clean !== a.href) a.href = clean;\n });\n }\n });\n });\n });\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "Remove Tracking Parameters from Links"); } } catch(__e) { console.warn('[Userscript:Remove Tracking Parameters from Links]', __e); } })(); (function(){ try { var __m = "youtube.com"; var __re = new RegExp('^' + "youtube\\.com" + '
Skip to content

twister + calendars: cancelled occurrence semantics - #130

Merged
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences
Apr 30, 2026
Merged

twister + calendars: cancelled occurrence semantics#130
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences

Conversation

@KrisBraun

Copy link
Copy Markdown
Contributor

Renames NewScheduleOccurrence.archived to cancelled, and updates the three calendar connectors (google, apple, outlook) to emit cancelled: true on per-instance cancellations. archived overloaded the meaning — elsewhere on schedules it means "hide this entity"; on occurrences it actually meant "this date won't happen in the series". The new field name matches upstream calendar APIs (Google status: "cancelled", Microsoft isCancelled, iCalendar STATUS:CANCELLED).

The Plot runtime keeps translating cancelled: true into an addition to the parent schedule's recurrence_exdates — the canonical storage representation for skipped dates — so connectors stay stateless about the parent series and don't need to compute exdate updates themselves. For one release, archived: true on an occurrence is still accepted as a deprecated alias and emits a console warning. The bulk NewSchedule.recurrenceExdates field is unchanged and remains the right shape for seeding a master schedule's full EXDATE list at initial sync (apple/outlook ICS/Graph master parse paths).

Also bundled here: order-independent end-of-batch pending_occ drain in google-calendar (and a flush-leftovers behavior at full-pass cleanup that forwards orphaned pending occurrences to saveLinks rather than silently discarding them). The previous inline drain at master-processing time missed instances that arrived after their master in the same batch, and after the cancelled-semantics switch every dropped cancellation is more user-visible.

Renames NewScheduleOccurrence.archived to cancelled, and updates the
three calendar connectors (google, apple, outlook) to emit `cancelled:
true` on per-instance cancellations. `archived` overloaded the meaning
— elsewhere on schedules it means "hide this entity"; on occurrences
it actually meant "this date won't happen in the series". The new
field name matches upstream calendar APIs (Google `status: "cancelled"`,
Microsoft `isCancelled`, iCalendar `STATUS:CANCELLED`).
The Plot runtime keeps translating `cancelled: true` into an addition
to the parent schedule's recurrence_exdates — the canonical storage
representation for skipped dates — so connectors stay stateless about
the parent series and don't need to compute exdate updates themselves.
For one release, `archived: true` on an occurrence is still accepted
as a deprecated alias and emits a console warning. The bulk
NewSchedule.recurrenceExdates field is unchanged and remains the
right shape for seeding a master schedule's full EXDATE list at
initial sync (apple/outlook ICS/Graph master parse paths).
Also bundled here: order-independent end-of-batch pending_occ drain
in google-calendar (and a flush-leftovers behavior at full-pass
cleanup that forwards orphaned pending occurrences to saveLinks
rather than silently discarding them). The previous inline drain at
master-processing time missed instances that arrived after their
master in the same batch, and after the cancelled-semantics switch
every dropped cancellation is more user-visible.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@KrisBraun
KrisBraun merged commit 83257b5 into mainApr 30, 2026
1 check passed
@KrisBraun
KrisBraun deleted the cancelled-occurrences branch April 30, 2026 02:54
@github-actionsgithub-actionsBot mentioned this pull request Apr 30, 2026
Sign up for freeto join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant

@KrisBraun
, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Auto-enable theater mode on YouTube\n(function() {\n function tryTheater() {\n var btn = document.querySelector('button[aria-label=\"Theater mode\"], ytd-player #player button[title=\"Theater mode\"]');\n if (btn && !btn.classList.contains('activated')) {\n btn.click();\n }\n }\n \n // Try immediately\n tryTheater();\n \n // Try after navigation (SPA)\n var lastUrl = location.href;\n setInterval(function() {\n if (location.href !== lastUrl) {\n lastUrl = location.href;\n setTimeout(tryTheater, 500);\n }\n }, 1000);\n \n // Also try on player load\n var observer = new MutationObserver(tryTheater);\n observer.observe(document.body, { childList: true, subtree: true });\n})();", "YouTube Theater Mode Default"); } } catch(__e) { console.warn('[Userscript:YouTube Theater Mode Default]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
Skip to content

twister + calendars: cancelled occurrence semantics - #130

Merged
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences
Apr 30, 2026
Merged

twister + calendars: cancelled occurrence semantics#130
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences

Conversation

@KrisBraun

Copy link
Copy Markdown
Contributor

Renames NewScheduleOccurrence.archived to cancelled, and updates the three calendar connectors (google, apple, outlook) to emit cancelled: true on per-instance cancellations. archived overloaded the meaning — elsewhere on schedules it means "hide this entity"; on occurrences it actually meant "this date won't happen in the series". The new field name matches upstream calendar APIs (Google status: "cancelled", Microsoft isCancelled, iCalendar STATUS:CANCELLED).

The Plot runtime keeps translating cancelled: true into an addition to the parent schedule's recurrence_exdates — the canonical storage representation for skipped dates — so connectors stay stateless about the parent series and don't need to compute exdate updates themselves. For one release, archived: true on an occurrence is still accepted as a deprecated alias and emits a console warning. The bulk NewSchedule.recurrenceExdates field is unchanged and remains the right shape for seeding a master schedule's full EXDATE list at initial sync (apple/outlook ICS/Graph master parse paths).

Also bundled here: order-independent end-of-batch pending_occ drain in google-calendar (and a flush-leftovers behavior at full-pass cleanup that forwards orphaned pending occurrences to saveLinks rather than silently discarding them). The previous inline drain at master-processing time missed instances that arrived after their master in the same batch, and after the cancelled-semantics switch every dropped cancellation is more user-visible.

Renames NewScheduleOccurrence.archived to cancelled, and updates the
three calendar connectors (google, apple, outlook) to emit `cancelled:
true` on per-instance cancellations. `archived` overloaded the meaning
— elsewhere on schedules it means "hide this entity"; on occurrences
it actually meant "this date won't happen in the series". The new
field name matches upstream calendar APIs (Google `status: "cancelled"`,
Microsoft `isCancelled`, iCalendar `STATUS:CANCELLED`).
The Plot runtime keeps translating `cancelled: true` into an addition
to the parent schedule's recurrence_exdates — the canonical storage
representation for skipped dates — so connectors stay stateless about
the parent series and don't need to compute exdate updates themselves.
For one release, `archived: true` on an occurrence is still accepted
as a deprecated alias and emits a console warning. The bulk
NewSchedule.recurrenceExdates field is unchanged and remains the
right shape for seeding a master schedule's full EXDATE list at
initial sync (apple/outlook ICS/Graph master parse paths).
Also bundled here: order-independent end-of-batch pending_occ drain
in google-calendar (and a flush-leftovers behavior at full-pass
cleanup that forwards orphaned pending occurrences to saveLinks
rather than silently discarding them). The previous inline drain at
master-processing time missed instances that arrived after their
master in the same batch, and after the cancelled-semantics switch
every dropped cancellation is more user-visible.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@KrisBraun
KrisBraun merged commit 83257b5 into mainApr 30, 2026
1 check passed
@KrisBraun
KrisBraun deleted the cancelled-occurrences branch April 30, 2026 02:54
@github-actionsgithub-actionsBot mentioned this pull request Apr 30, 2026
Sign up for freeto join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant

@KrisBraun
, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Remove or un-stick sticky/fixed headers that block content\n(function() {\n function unstick() {\n document.querySelectorAll('header, nav, [role=\"banner\"], .header, .navbar, .sticky, .fixed-top, [style*=\"position: fixed\"], [style*=\"position:sticky\"]').forEach(function(el) {\n if (el.style.position === 'fixed' || el.style.position === 'sticky' || \n getComputedStyle(el).position === 'fixed' || getComputedStyle(el).position === 'sticky') {\n el.style.position = 'static';\n el.style.top = 'auto';\n el.style.zIndex = 'auto';\n }\n });\n }\n \n unstick();\n \n var observer = new MutationObserver(unstick);\n observer.observe(document.body, { childList: true, subtree: true, attributes: true, attributeFilter: ['style', 'class'] });\n})();", "Kill Sticky Headers"); } } catch(__e) { console.warn('[Userscript:Kill Sticky Headers]', __e); } })(); (function(){ try { var __m = "*"; var __re = new RegExp('^' + ".*" + '
Skip to content

twister + calendars: cancelled occurrence semantics - #130

Merged
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences
Apr 30, 2026
Merged

twister + calendars: cancelled occurrence semantics#130
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences

Conversation

@KrisBraun

Copy link
Copy Markdown
Contributor

Renames NewScheduleOccurrence.archived to cancelled, and updates the three calendar connectors (google, apple, outlook) to emit cancelled: true on per-instance cancellations. archived overloaded the meaning — elsewhere on schedules it means "hide this entity"; on occurrences it actually meant "this date won't happen in the series". The new field name matches upstream calendar APIs (Google status: "cancelled", Microsoft isCancelled, iCalendar STATUS:CANCELLED).

The Plot runtime keeps translating cancelled: true into an addition to the parent schedule's recurrence_exdates — the canonical storage representation for skipped dates — so connectors stay stateless about the parent series and don't need to compute exdate updates themselves. For one release, archived: true on an occurrence is still accepted as a deprecated alias and emits a console warning. The bulk NewSchedule.recurrenceExdates field is unchanged and remains the right shape for seeding a master schedule's full EXDATE list at initial sync (apple/outlook ICS/Graph master parse paths).

Also bundled here: order-independent end-of-batch pending_occ drain in google-calendar (and a flush-leftovers behavior at full-pass cleanup that forwards orphaned pending occurrences to saveLinks rather than silently discarding them). The previous inline drain at master-processing time missed instances that arrived after their master in the same batch, and after the cancelled-semantics switch every dropped cancellation is more user-visible.

Renames NewScheduleOccurrence.archived to cancelled, and updates the
three calendar connectors (google, apple, outlook) to emit `cancelled:
true` on per-instance cancellations. `archived` overloaded the meaning
— elsewhere on schedules it means "hide this entity"; on occurrences
it actually meant "this date won't happen in the series". The new
field name matches upstream calendar APIs (Google `status: "cancelled"`,
Microsoft `isCancelled`, iCalendar `STATUS:CANCELLED`).
The Plot runtime keeps translating `cancelled: true` into an addition
to the parent schedule's recurrence_exdates — the canonical storage
representation for skipped dates — so connectors stay stateless about
the parent series and don't need to compute exdate updates themselves.
For one release, `archived: true` on an occurrence is still accepted
as a deprecated alias and emits a console warning. The bulk
NewSchedule.recurrenceExdates field is unchanged and remains the
right shape for seeding a master schedule's full EXDATE list at
initial sync (apple/outlook ICS/Graph master parse paths).
Also bundled here: order-independent end-of-batch pending_occ drain
in google-calendar (and a flush-leftovers behavior at full-pass
cleanup that forwards orphaned pending occurrences to saveLinks
rather than silently discarding them). The previous inline drain at
master-processing time missed instances that arrived after their
master in the same batch, and after the cancelled-semantics switch
every dropped cancellation is more user-visible.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@KrisBraun
KrisBraun merged commit 83257b5 into mainApr 30, 2026
1 check passed
@KrisBraun
KrisBraun deleted the cancelled-occurrences branch April 30, 2026 02:54
@github-actionsgithub-actionsBot mentioned this pull request Apr 30, 2026
Sign up for freeto join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant

@KrisBraun
, 'i'); if (__m === '*' || __re.test(location.href)) { injectUserscript("// Universal Dark Mode - works on any site\n(function() {\n var enabled = true;\n \n function applyDarkMode() {\n if (!enabled) return;\n \n // Create style element if it doesn't exist\n var style = document.getElementById('universal-dark-mode-style');\n if (!style) {\n style = document.createElement('style');\n style.id = 'universal-dark-mode-style';\n document.head.appendChild(style);\n }\n \n // Dark mode CSS - inverts colors but preserves images/video\n style.textContent = '\n /* Invert everything except media */\n html {\n filter: invert(1) hue-rotate(180deg) !important;\n background: #1a1a2e !important;\n }\n \n /* Restore images, videos, iframes, canvas */\n img, video, iframe, canvas, svg, picture, [style*=\"background-image\"] {\n filter: invert(1) hue-rotate(180deg) !important;\n }\n \n /* Preserve specific elements that should not be inverted */\n .no-dark-mode, .no-dark-mode *,\n [data-theme=\"light\"], [data-theme=\"light\"],\n .ace_editor, .ace_editor *,\n .CodeMirror, .CodeMirror *,\n .monaco-editor, .monaco-editor *,\n .markdown-body pre, .markdown-body pre *,\n .highlight, .highlight *,\n pre code, pre code * {\n filter: none !important;\n }\n \n /* Fix common UI elements */\n .modal, .popup, .dropdown-menu, .tooltip, .popover {\n filter: invert(1) hue-rotate(180deg) !important;\n background: #2d2d44 !important;\n border-color: #444 !important;\n }\n \n /* Scrollbars */\n ::-webkit-scrollbar { background: #1a1a2e !important; }\n ::-webkit-scrollbar-thumb { background: #444 !important; }\n ::-webkit-scrollbar-thumb:hover { background: #555 !important; }\n \n /* Selection */\n ::selection { background: #4ecdc4 !important; color: #1a1a2e !important; }\n ::-moz-selection { background: #4ecdc4 !important; color: #1a1a2e !important; }\n ';\n }\n \n function removeDarkMode() {\n var style = document.getElementById('universal-dark-mode-style');\n if (style) style.remove();\n }\n \n // Toggle with Alt+Shift+D\n document.addEventListener('keydown', function(e) {\n if (e.altKey && e.shiftKey && e.key === 'D') {\n e.preventDefault();\n enabled = !enabled;\n if (enabled) {\n applyDarkMode();\n console.log('[Universal Dark Mode] Enabled');\n } else {\n removeDarkMode();\n console.log('[Universal Dark Mode] Disabled');\n }\n }\n });\n \n // Apply on load\n applyDarkMode();\n \n // Re-apply on dynamic content\n var observer = new MutationObserver(function(mutations) {\n if (enabled && !document.getElementById('universal-dark-mode-style')) {\n applyDarkMode();\n }\n });\n observer.observe(document.head, { childList: true });\n \n console.log('[Universal Dark Mode] Loaded - Press Alt+Shift+D to toggle');\n})();", "Universal Dark Mode"); } } catch(__e) { console.warn('[Userscript:Universal Dark Mode]', __e); } })(); })();
Skip to content

twister + calendars: cancelled occurrence semantics - #130

Merged
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences
Apr 30, 2026
Merged

twister + calendars: cancelled occurrence semantics#130
KrisBraun merged 1 commit into
mainfrom
cancelled-occurrences

Conversation

@KrisBraun

Copy link
Copy Markdown
Contributor

Renames NewScheduleOccurrence.archived to cancelled, and updates the three calendar connectors (google, apple, outlook) to emit cancelled: true on per-instance cancellations. archived overloaded the meaning — elsewhere on schedules it means "hide this entity"; on occurrences it actually meant "this date won't happen in the series". The new field name matches upstream calendar APIs (Google status: "cancelled", Microsoft isCancelled, iCalendar STATUS:CANCELLED).

The Plot runtime keeps translating cancelled: true into an addition to the parent schedule's recurrence_exdates — the canonical storage representation for skipped dates — so connectors stay stateless about the parent series and don't need to compute exdate updates themselves. For one release, archived: true on an occurrence is still accepted as a deprecated alias and emits a console warning. The bulk NewSchedule.recurrenceExdates field is unchanged and remains the right shape for seeding a master schedule's full EXDATE list at initial sync (apple/outlook ICS/Graph master parse paths).

Also bundled here: order-independent end-of-batch pending_occ drain in google-calendar (and a flush-leftovers behavior at full-pass cleanup that forwards orphaned pending occurrences to saveLinks rather than silently discarding them). The previous inline drain at master-processing time missed instances that arrived after their master in the same batch, and after the cancelled-semantics switch every dropped cancellation is more user-visible.

Renames NewScheduleOccurrence.archived to cancelled, and updates the
three calendar connectors (google, apple, outlook) to emit `cancelled:
true` on per-instance cancellations. `archived` overloaded the meaning
— elsewhere on schedules it means "hide this entity"; on occurrences
it actually meant "this date won't happen in the series". The new
field name matches upstream calendar APIs (Google `status: "cancelled"`,
Microsoft `isCancelled`, iCalendar `STATUS:CANCELLED`).
The Plot runtime keeps translating `cancelled: true` into an addition
to the parent schedule's recurrence_exdates — the canonical storage
representation for skipped dates — so connectors stay stateless about
the parent series and don't need to compute exdate updates themselves.
For one release, `archived: true` on an occurrence is still accepted
as a deprecated alias and emits a console warning. The bulk
NewSchedule.recurrenceExdates field is unchanged and remains the
right shape for seeding a master schedule's full EXDATE list at
initial sync (apple/outlook ICS/Graph master parse paths).
Also bundled here: order-independent end-of-batch pending_occ drain
in google-calendar (and a flush-leftovers behavior at full-pass
cleanup that forwards orphaned pending occurrences to saveLinks
rather than silently discarding them). The previous inline drain at
master-processing time missed instances that arrived after their
master in the same batch, and after the cancelled-semantics switch
every dropped cancellation is more user-visible.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@KrisBraun
KrisBraun merged commit 83257b5 into mainApr 30, 2026
1 check passed
@KrisBraun
KrisBraun deleted the cancelled-occurrences branch April 30, 2026 02:54
@github-actionsgithub-actionsBot mentioned this pull request Apr 30, 2026
Sign up for freeto join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant

@KrisBraun