Skip to content

Promote Develop to Main - #1002

Merged
ptr727 merged 1 commit into
mainfrom
develop
Aug 25, 2026
Merged

Promote Develop to Main#1002
ptr727 merged 1 commit into
mainfrom
develop

Conversation

@ptr727

@ptr727ptr727 commented Aug 25, 2026

Copy link
Copy Markdown
Owner

Promotes develop to main.

Latest change: #1000 (date-stamp the stale carrier list in the validate-task.yml gap entry,
fixes#998).

🤖 Generated with Claude Code

Summary by CodeRabbit

  • Documentation
    • Updated divergence records to identify the carrier repository snapshot as of August 16, 2026.
    • Replaced ambiguous “current” or “today” wording with a specific snapshot date.
    • Confirmed the snapshot includes thirteen known carrier repositories.

…1000)
## What
`spec/divergences.json`'s `gaps` entry for
`.github/workflows/validate-task.yml` claimed
thirteen repos carry a copy "today," a sentence introduced on 2026-08-16
(commit `b192e3b`)
that has since drifted: the report's own live-generated carrier count
now reads nine (four of
the named thirteen, PhotoCleaner, Financial-Modeling, Blog, and
HomeAutomation-Config, have
already dropped their local copy).
## Fix
Date-stamped the claim the same way sibling gap entries already do (for
example
"the carriers, read from the fleet on 2026-08-15, are ..." on the
`get-version-task.yml` and
`publish-plan-task.yml` entries), and noted that the live carrier list
generated directly above
it in the report may have moved on since. Regenerated
`reports/divergences.md` via
`python3 spec/fidelity_honesty.py --report` to match.
Fixes#998
🤖 Generated with [Claude Code](https://claude.com/claude-code)
<!-- This is an auto-generated comment: release notes by coderabbit.ai
-->
## Summary by CodeRabbit
* **Documentation**
* Updated workflow retirement guidance with a dated list of repositories
carrying the workflow.
* Clarified that downstream projects should replace copied workflows
with the documented caller configuration.
* Noted that the recorded carrier list may change over time.
<!-- end of auto-generated comment: release notes by coderabbit.ai -->
@coderabbitai

coderabbitaiBot commented Aug 25, 2026

Copy link
Copy Markdown

Review Change Stack

No actionable comments were generated in the recent review. 🎉

ℹ️ Recent review info
⚙️ Run configuration

Configuration used: Organization UI

Review profile: ASSERTIVE

Plan: Pro Plus

Run ID: f8e7157e-e765-4816-9994-92d93f358d16

📥 Commits

Reviewing files that changed from the base of the PR and between df489f3 and f3ae0ff.

📒 Files selected for processing (2)
  • reports/divergences.md
  • spec/divergences.json

Included review availability: Your plan provides up to 10 included reviews per hour; 7 remain after this review.


📝 Walkthrough

Walkthrough

The pull request dates the thirteen-repository carrier snapshot for validate-task.yml to 2026-08-16 in the divergence specification and generated report. The retirement and replacement guidance remain unchanged.

Changes

Divergence records

Layer / File(s)Summary
Date the carrier snapshot
spec/divergences.json, reports/divergences.md
The divergence entry replaces “today” wording with the 2026-08-16 snapshot date. Retirement and hub-task adoption guidance remain unchanged.

Estimated code review effort: 1 (Trivial) | ~2 minutes

Merge Risk:⚪ Minimal · up to f3ae0

This PR makes a localized documentation/specification update, and no actionable merge-blocking risk remains beyond normal checks and review.

🚥 Pre-merge checks | ✅ 5
✅ Passed checks (5 passed)
Check nameStatusExplanation
Description Check✅ PassedCheck skipped - CodeRabbit’s high-level summary is enabled.
Title check✅ PassedThe title clearly describes the stated branch-promotion objective: promoting develop to main.
Linked Issues check✅ PassedThe changes satisfy issue #998. The carrier list is explicitly dated as of 2026-08-16, and the generated report reflects the same historical wording.
Out of Scope Changes check✅ PassedThe one-line updates to spec/divergences.json and reports/divergences.md directly address issue #998. No unrelated code changes are shown.
Docstring Coverage✅ PassedNo functions found in the changed files to evaluate docstring coverage. Skipping docstring coverage check. Docstring coverage is scoped to functions touched by this diff. Analyzed 0 functions across 0…
Full details: Docstring Coverage

Explanation

No functions found in the changed files to evaluate docstring coverage. Skipping docstring coverage check. Docstring coverage is scoped to functions touched by this diff. Analyzed 0 functions across 0 files. (2 skipped: 2 unsupported.)

✨ Finishing Touches
🧪 Generate unit tests (beta)
  • Create PR with unit tests
  • Commit unit tests in branch develop

Comment @coderabbitai help to get the list of available commands.

@qodo-code-review

Copy link
Copy Markdown

PR Summary by Qodo

Date-stamp the validate-task carrier snapshot

📝 Documentation🕐 Less than 5 minutes

Grey Divider

AI Description

• Date-stamps the thirteen-repository carrier snapshot as of 2026-08-16.
• Clarifies that the live generated carrier list may differ from the historical snapshot.
Diagram

graph TD
A["Divergence ledger"] -->|report input| B["Report generator"] -->|regenerates| C["Divergence report"] -->|provides context| D["Fleet reviewers"]
Loading
High-Level Assessment

Keeping the historical carrier claim in the curated ledger, explicitly dating it, and regenerating the report is the appropriate approach. Replacing it with only dynamic data would lose the original rollout snapshot, while leaving it undated would continue implying that a stale count is current.

Files changed (2) +2 / -2

Documentation (2) +2 / -2
divergences.mdPublish the dated validate-task carrier snapshot+1/-1

Publish the dated validate-task carrier snapshot

• Regenerates the divergence report with the carrier list identified as a 2026-08-16 snapshot. It also warns that the live carrier list shown in the same entry may have changed.

reports/divergences.md

divergences.jsonDate-stamp validate-task retirement guidance+1/-1

Date-stamp validate-task retirement guidance

• Updates the curated validate-task gap reason to date the thirteen-repository carrier list and distinguish it from current fleet data.

spec/divergences.json

@qodo-code-review

Copy link
Copy Markdown

Code Review by Qodo

🐞 Bugs (0)📘 Rule violations (0)📎 Requirement gaps (0)

Grey Divider

Great, no issues found!

Qodo reviewed your code and found no material issues that require review

Grey Divider

Tip of the day
💡 Did you know, you can hide the parts of a finding you never read, like the evidence or the agent prompt

More tips ↗ | Customize Qodo ↗ | Qodo docs ↗

Grey Divider

Qodo Logo

@ptr727
ptr727 merged commit eec53ea into mainAug 25, 2026
8 checks passed
Sign up for freeto join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

spec/divergences.json's validate-task.yml gap entry names a stale 13-repo carrier list

1 participant

@ptr727