Issue #2226 - Fix Stale Inactivity Cutoff in Activity Metrics Updater
Goal
Make the activity metrics updater derive its peer-inactivity cutoff at each update so the inactive-peer and inactive-torrent gauges reflect the current time rather than the tracker startup time.
Background
Source inspection confirms a defect in the current updater wiring:
src/bootstrap/jobs/activity_metrics_updater.rs calls peer_inactivity_cutoff_timestamp once while constructing the periodic job.
That precomputed cutoff is passed to statistics::activity_metrics_updater::start_job and reused for every 15-second tick.
SwarmCoordinator::count_inactive_peers classifies a peer as inactive when peer.updated <= cutoff.
Consequently, a peer that announces after the tracker starts always has an updated time later than the frozen cutoff and can never be counted as inactive by the updater, even after max_peer_timeout elapses. The inactive gauges can therefore report too little inactivity for the lifetime of the process.
TorrentsManager::current_cutoff independently derives the equivalent cutoff immediately before cleanup. This confirms the intended time-relative policy, but it also exposes duplicated cutoff logic.
This bug is related to, but is not a child of, EPIC #1488. Its SI-5 draft changes the same updater's shutdown lifecycle. Coordinate implementation order with SI-5 to avoid conflicting edits to the job signature and loop.
Scope
In Scope
Derive the inactivity cutoff from the current clock and max_peer_timeout for every activity-metrics update.
Add deterministic Stopped-clock unit coverage proving that a peer which announced after job startup becomes inactive after max_peer_timeout without another announce.
Assess whether both the updater and TorrentsManager can use one appropriately owned cutoff helper without introducing an undesirable package dependency; implement the shared helper only if that assessment supports it.
Manually verify the inactive-peer gauge for a peer that becomes inactive after tracker startup.
Out of Scope
Making the 15-second updater interval configurable.
Changing metric names, labels, the statistics repository API, or metric semantics other than correcting the stale cutoff.
Changing cleanup-job behavior or the updater shutdown lifecycle; coordinate with SI-5 rather than duplicating its lifecycle migration.
ADRs to create: None known. If unifying cutoff computation requires a new dependency or changes extractable-package boundaries, stop and record that decision in an ADR at the appropriate scope.
Design and Ownership Review
Not applicable. The change affects a pure time-relative calculation in an existing periodic job. It must retain the job's existing weak-reference ownership behavior; this issue introduces no child process, readiness wait, or resource-lifetime policy.
Bug-Fix Process
This bug follows the repository's fixed sequence for defects. Each step must be complete, with evidence, before the next starts.
Step
Activity
Status
Evidence
B1
Analyse the defect at source level
DONE
Background section; source wiring captured in evidence.md step 7
B2
Reproduce the defect against the real artifact
DONE
evidence.md V1: post-startup peer still counted active ~267 s after its timeout expired
B3
Analyse which test type best protects against regression
DONE
Regression Test Strategy section below
B4
Write the failing regression test(s) first
TODO
T1
B5
Fix the defect
TODO
T2
B6
Recheck: rerun the regression test and the original reproduction
TODO
T4; manual-verification-evidence.md M1 repeats the evidence.md scenario against the fixed build
Regression Test Strategy
Where the defect lives
The defect is not inside count_inactive_peers (correctly tested in coordinator.rs and registry.rs); it is in who computes the cutoff and when. Today the caller (src/bootstrap/jobs/activity_metrics_updater.rs) computes it once and the library job (packages/swarm-coordination-registry/src/statistics/activity_metrics_updater.rs) treats it as a constant. No existing test observes this seam.
Test types considered
Candidate
Verdict
Reason
Unit test in swarm-coordination-registry on the per-update function, with the Stopped clock
Primary
Deterministic, milliseconds, exercises the exact seam (cutoff derived at update time). Requires the update function to receive the timeout policy rather than a precomputed cutoff, which is also the fix.
Unit test of the spawned loop with tokio::time::pause + advance
Optional secondary
Proves the loop calls the per-update path repeatedly with fresh cutoffs, but the hardcoded 15 s interval and spawned task make it less readable. Add only if the loop cannot be trivially inspected.
Bootstrap-level test in src/bootstrap/jobs/activity_metrics_updater.rs
Rejected as primary
Requires an AppContainer; wall-clock coupled; duplicates the library test at a heavier boundary.
Integration or E2E test waiting real max_peer_timeout + 15 s
Rejected
Slow, timing-fragile, and no better at exposing the causal state. Real-time verification stays a manual scenario (M1).
Primary regression test specification
Location: packages/swarm-coordination-registry/src/statistics/activity_metrics_updater.rs (#[cfg(test)] mod tests), using CurrentClock = Stopped per the write-unit-test skill.
Arrange: pin the stopped clock; create a Registry and stats Repository; construct the updater's per-update policy from max_peer_timeout (e.g. 20 s) at this instant (this models job creation). Then announce one peer after that instant and advance the clock by max_peer_timeout + 1 s. The single causal difference is: the peer announced after the policy was created, and more than max_peer_timeout has since elapsed.
Act: run one activity-metrics update through the production function.
A companion test asserts the complementary state (clock advanced by less than max_peer_timeout, gauge stays 0) so the pair fixes both boundaries of the behavior.
Obtaining a genuine red against the current API: the existing update_activity_metrics(..., inactivity_cutoff) can be called with a cutoff computed at job-creation time (before the peer is added and the clock advanced), exactly as the bootstrap does today. Asserting inactive_peers_total == 1 then fails, reproducing the defect at unit level. The green step changes the function to take the timeout policy and derive the cutoff itself; the test's Arrange, Act, and Assert intent does not change, only the argument passed. Record the red run output in task evidence. The test-design review (prose-first AAA) must confirm the post-startup announce and the elapsed time remain visible in the test body.
Why the manual reproduction is still required
The unit test proves the library computes the cutoff per update. Only the real tracker run (M1) proves the bootstrap wiring passes the policy, not a frozen value, into the job. M1 must reuse the exact scenario in evidence.md so the before/after comparison is like-for-like.
Implementation Plan
Status values: TODO, IN_PROGRESS, BLOCKED, DONE.
ID
Status
Task
Notes / Expected Output
T1
TODO
Write the failing regression tests (B4)
Add the two Stopped-clock tests from Regression Test Strategy against the current API; the "inactive after timeout" test must fail (red) with the frozen job-creation cutoff. Record the red output and the prose-first AAA review in task evidence.
T2
TODO
Fix: compute the cutoff for each update (B5)
Derive the cutoff immediately before get_activity_metadata from the current clock and max_peer_timeout; update the bootstrap call site to pass the policy; remove peer_inactivity_cutoff_timestamp's startup-time evaluation. Tests from T1 pass.
T3
TODO
Review cutoff-helper ownership
Decide whether a shared helper belongs at an existing dependency boundary; either use it in both consumers or document why two thin call sites are preferable.
T4
TODO
Recheck and record evidence (B6)
Run focused tests and linter all; repeat the evidence.md scenario against the fixed build and record it as M1 in manual-verification-evidence.md; update acceptance verification.
T5
TODO
Link the process follow-up issue
A separate follow-up issue for the fix-bug skill and bug-spec guardrails is being prepared (see Process Follow-up); once it exists, link its number here. No code change in this issue.
Commit Points
Task
Coherent change set
Commit policy
T1-T2
Regression tests plus the per-update cutoff fix that turns them green
One reviewed commit; never commit the red build. The recorded red output in task evidence is the proof that the test preceded the fix. Commit after focused validation, test-design review, and required review.
T3
Deliberate helper-ownership refactor or documented no-change decision
Commit separately if it crosses package boundaries; do not create an empty commit for a no-change decision.
T4
Completion evidence and specification progress
Commit separately when it improves reviewability.
T5
Follow-up issue link only
No code change in this issue.
For the test-producing task, use the write-unit-test skill. Complete a prose-first Arrange-Act-Assert review after the passing increment: make the post-startup announce the one visible causal state difference; keep incidental setup in the fixture; and keep the production Act and independently specified expected result visible. Record the review in task evidence before maintainer review and commit.
Progress Tracking
Workflow Checkpoints
Folder-style spec drafted and promoted to docs/issues/open/2226-fix-stale-inactivity-cutoff-in-activity-metrics-updater/ISSUE.md
Source-level and local-runtime defect confirmation recorded in evidence.md
Spec-only PR merged into develop before implementation, if maintainers require it
Implementation completed
Automatic verification completed (linter all, relevant tests, and any pre-push checks)
Manual verification scenarios executed and recorded in issue-local manual-verification-evidence.md
Acceptance criteria reviewed after implementation and updated with evidence
Evidence-based implementation completion review recorded: issue-local retrospective created for material discoveries, or progress log states why none was needed
Reviewer validated acceptance criteria and updated checkboxes
Independent reviewer reports recorded in issue-local agent-review-reports.md when reviewers received this folder-style specification
Committer verified spec progress is up to date before commit
Issue closed and spec moved from docs/issues/open/ to docs/issues/closed/
Progress Log
2026-09-15 10:00 UTC - GitHub Copilot - Copied and refreshed the parked draft as a folder-style bug specification; source inspection confirmed that a startup-time cutoff is reused on every updater tick, while peer inactivity compares against that cutoff.
2026-09-15 10:11 UTC - GitHub Copilot - Reproduced the defect against an isolated local tracker: one peer announced after startup remained active in every metrics update for about 287 seconds after the announce (about 267 seconds past its expiry) despite max_peer_timeout = 20; see evidence.md.
2026-09-15 10:30 UTC - GitHub Copilot - Added the explicit bug-fix process table, regression-test strategy (unit test at the per-update seam with the Stopped clock), and a process follow-up assessment for repository guidance.
2026-09-15 10:45 UTC - GitHub Copilot - Review pass: clarified how a genuine red test is obtained against the current API, merged the T1/T2 commit point, and aligned the follow-up with the agreed .github/skills/dev/debugging/fix-bug location.
2026-09-15 11:00 UTC - josecelano - Approved this independent bug specification for GitHub issue creation - Chat approval.
AC1: Every activity-metrics update derives its inactivity cutoff from the current clock and configured max_peer_timeout.
AC2: A peer that announces after tracker startup is counted as inactive after more than max_peer_timeout without a subsequent announce.
AC3: Cutoff computation has deliberate ownership: both consumers use one suitable shared helper, or the implementation documents why existing package boundaries require separate thin call sites.
AC4: Deterministic Stopped-clock unit tests in swarm-coordination-registry cover both boundaries: a post-startup peer is counted inactive after max_peer_timeout elapses, and remains active before it. The inactive-case test's red run against the pre-fix code is recorded in task evidence.
AC5: The original reproduction scenario from evidence.md is repeated against the fixed build and the inactive-peer gauge changes to 1.
linter all exits with code 0.
Relevant tests pass.
Manual verification scenarios are executed and documented in issue-local manual-verification-evidence.md.
Acceptance criteria are re-reviewed after implementation and reflect actual behavior.
Documentation is updated when behavior or workflow changes.
Verification Plan
Automatic Checks
cargo test -p torrust-tracker-swarm-coordination-registry --lib statistics::activity_metrics_updater
cargo test -p torrust-tracker-swarm-coordination-registry --lib swarm::coordinator
cargo test -p torrust-tracker-core --lib torrent::manager
linter all
Pre-push checks when applicable
Manual Verification Scenarios
Status values: TODO, IN_PROGRESS, DONE, FAILED, BLOCKED.
ID
Scenario
Human-oriented command/steps
Expected Result
Status
Evidence
M1
Post-startup peer becomes inactive (recheck, B6)
Repeat the exact evidence.md V1 scenario against the fixed build: isolated tracker with max_peer_timeout = 20, cleanup disabled, usage statistics enabled; announce one peer with tracker_client; wait more than 35 seconds without another announce.
swarm_coordination_registry_peers_inactive_total changes from 0 to 1 in the metrics endpoint and the updater log reports inactive_peers_total=1.
TODO
manual-verification-evidence.md section V1
M2
Pre-fix behavior
Already executed against the pre-fix revision.
The inactive-peer gauge remained 0 for ~267 s after the timeout expired.
DONE
evidence.md V1
Create manual-verification-evidence.md from docs/templates/MANUAL-VERIFICATION-EVIDENCE.md when executing M1. Record actual prerequisites, commands, output, relevant tracker logs, and outcomes so it can be compared line-for-line with evidence.md.
Disposable Verification Scripts
None planned. The behavior must be covered by maintained Rust tests and a human-oriented tracker run, not a temporary script.
Acceptance Verification
AC ID
Status (TODO/DONE)
Evidence
AC1
TODO
AC2
TODO
AC3
TODO
AC4
TODO
AC5
TODO
Risks and Trade-offs
Concurrent SI-5 edits: the lifecycle migration and this fix touch the updater API and loop. Mitigation: rebase the draft's paths and signature assumptions after SI-5, or implement the changes together only with explicit maintainer approval.
Wrong helper placement: sharing policy logic across tracker-core and swarm-coordination-registry could invert or expand package dependencies. Mitigation: assess the dependency direction before extracting a helper; retain two explicit call sites when that is the cleaner boundary.
Runtime timing: the fixed 15-second update interval means the manual scenario needs enough wait time after the timeout. Mitigation: wait for both the timeout and a subsequent update tick.
Process Follow-up
The bug-fix sequence used here (analyse, reproduce, choose the test type, write the failing test, fix, recheck) is not written down anywhere in the repository today: the create-issue skill and docs/templates/ISSUE.md are type-agnostic, and the Implementer agent describes TDD generically. Assessment of the three options:
Option
Assessment
Extend the create-issue skill
Partial fit. It can require bug specs to contain a Bug-Fix Process table and a Regression Test Strategy section, but the skill is about writing specs, not executing fixes. Keep it to the spec-shape requirement only.
New fix-bug skill at .github/skills/dev/debugging/fix-bug/
Best fit for the procedure itself: the six steps, what counts as a reproduction (real artifact, recorded commands and output, no throwaway scripts as evidence), how to choose the test type (unit at the causal seam first; integration or E2E only when the seam is not reachable), and the recheck rule (rerun the failing test and the original reproduction). It would link to write-unit-test, run-tracker-locally, use-tracker-client, and create-issue, and the Implementer agent would invoke it for issue-type: bug.
Change docs/templates/ISSUE.md
Add the two sections as bug-conditional blocks ("Required when issue-type: bug; delete otherwise"). Keeps a single template while making the process visible in every bug spec.
Decision: do all three in one small follow-up issue, with the new skill as the canonical source and the create-issue/template/Implementer changes as thin links to it (documentation single-source-of-truth policy). A parked draft for that issue already exists and will be opened after this issue is created; this bug's spec is cited there as the worked example. Do not expand this issue's scope to include that work.
Implementation Completion Review
After implementation, compare the observed behavior and validation evidence with this specification. Record reusable lessons, material design changes, and deviations from the plan in implementation-retrospective.md if warranted; otherwise record why none was needed in the progress log. Independent reviewers who receive this folder-style specification record their result in agent-review-reports.md using docs/templates/AGENT-REVIEW-REPORTS.md.
Related code: src/bootstrap/jobs/activity_metrics_updater.rs, packages/swarm-coordination-registry/src/statistics/activity_metrics_updater.rs, and packages/tracker-core/src/torrent/manager.rs
Issue #2226 - Fix Stale Inactivity Cutoff in Activity Metrics Updater
Goal
Make the activity metrics updater derive its peer-inactivity cutoff at each update so the inactive-peer and inactive-torrent gauges reflect the current time rather than the tracker startup time.
Background
Source inspection confirms a defect in the current updater wiring:
src/bootstrap/jobs/activity_metrics_updater.rscallspeer_inactivity_cutoff_timestamponce while constructing the periodic job.statistics::activity_metrics_updater::start_joband reused for every 15-second tick.SwarmCoordinator::count_inactive_peersclassifies a peer as inactive whenpeer.updated <= cutoff.Consequently, a peer that announces after the tracker starts always has an
updatedtime later than the frozen cutoff and can never be counted as inactive by the updater, even aftermax_peer_timeoutelapses. The inactive gauges can therefore report too little inactivity for the lifetime of the process.TorrentsManager::current_cutoffindependently derives the equivalent cutoff immediately before cleanup. This confirms the intended time-relative policy, but it also exposes duplicated cutoff logic.This bug is related to, but is not a child of, EPIC #1488. Its SI-5 draft changes the same updater's shutdown lifecycle. Coordinate implementation order with SI-5 to avoid conflicting edits to the job signature and loop.
Scope
In Scope
max_peer_timeoutfor every activity-metrics update.Stopped-clock unit coverage proving that a peer which announced after job startup becomes inactive aftermax_peer_timeoutwithout another announce.TorrentsManagercan use one appropriately owned cutoff helper without introducing an undesirable package dependency; implement the shared helper only if that assessment supports it.Out of Scope
Architectural Decisions
None known. If unifying cutoff computation requires a new dependency or changes extractable-package boundaries, stop and record that decision in an ADR at the appropriate scope.Design and Ownership Review
Not applicable. The change affects a pure time-relative calculation in an existing periodic job. It must retain the job's existing weak-reference ownership behavior; this issue introduces no child process, readiness wait, or resource-lifetime policy.
Bug-Fix Process
This bug follows the repository's fixed sequence for defects. Each step must be complete, with evidence, before the next starts.
Backgroundsection; source wiring captured inevidence.mdstep 7evidence.mdV1: post-startup peer still counted active ~267 s after its timeout expiredRegression Test Strategysection belowmanual-verification-evidence.mdM1 repeats theevidence.mdscenario against the fixed buildRegression Test Strategy
Where the defect lives
The defect is not inside
count_inactive_peers(correctly tested incoordinator.rsandregistry.rs); it is in who computes the cutoff and when. Today the caller (src/bootstrap/jobs/activity_metrics_updater.rs) computes it once and the library job (packages/swarm-coordination-registry/src/statistics/activity_metrics_updater.rs) treats it as a constant. No existing test observes this seam.Test types considered
swarm-coordination-registryon the per-update function, with theStoppedclocktokio::time::pause+advancesrc/bootstrap/jobs/activity_metrics_updater.rsAppContainer; wall-clock coupled; duplicates the library test at a heavier boundary.max_peer_timeout+ 15 sM1).Primary regression test specification
Location:
packages/swarm-coordination-registry/src/statistics/activity_metrics_updater.rs(#[cfg(test)] mod tests), usingCurrentClock = Stoppedper thewrite-unit-testskill.Registryand statsRepository; construct the updater's per-update policy frommax_peer_timeout(e.g. 20 s) at this instant (this models job creation). Then announce one peer after that instant and advance the clock bymax_peer_timeout + 1s. The single causal difference is: the peer announced after the policy was created, and more thanmax_peer_timeouthas since elapsed.swarm_coordination_registry_peers_inactive_totalgauge equals1(andtorrents_inactive_totalequals1).A companion test asserts the complementary state (clock advanced by less than
max_peer_timeout, gauge stays0) so the pair fixes both boundaries of the behavior.Obtaining a genuine red against the current API: the existing
update_activity_metrics(..., inactivity_cutoff)can be called with a cutoff computed at job-creation time (before the peer is added and the clock advanced), exactly as the bootstrap does today. Assertinginactive_peers_total == 1then fails, reproducing the defect at unit level. The green step changes the function to take the timeout policy and derive the cutoff itself; the test's Arrange, Act, and Assert intent does not change, only the argument passed. Record the red run output in task evidence. The test-design review (prose-first AAA) must confirm the post-startup announce and the elapsed time remain visible in the test body.Why the manual reproduction is still required
The unit test proves the library computes the cutoff per update. Only the real tracker run (
M1) proves the bootstrap wiring passes the policy, not a frozen value, into the job.M1must reuse the exact scenario inevidence.mdso the before/after comparison is like-for-like.Implementation Plan
Status values:
TODO,IN_PROGRESS,BLOCKED,DONE.Stopped-clock tests fromRegression Test Strategyagainst the current API; the "inactive after timeout" test must fail (red) with the frozen job-creation cutoff. Record the red output and the prose-first AAA review in task evidence.get_activity_metadatafrom the current clock andmax_peer_timeout; update the bootstrap call site to pass the policy; removepeer_inactivity_cutoff_timestamp's startup-time evaluation. Tests from T1 pass.linter all; repeat theevidence.mdscenario against the fixed build and record it asM1inmanual-verification-evidence.md; update acceptance verification.fix-bugskill and bug-spec guardrails is being prepared (seeProcess Follow-up); once it exists, link its number here. No code change in this issue.Commit Points
For the test-producing task, use the
write-unit-testskill. Complete a prose-first Arrange-Act-Assert review after the passing increment: make the post-startup announce the one visible causal state difference; keep incidental setup in the fixture; and keep the production Act and independently specified expected result visible. Record the review in task evidence before maintainer review and commit.Progress Tracking
Workflow Checkpoints
docs/issues/open/2226-fix-stale-inactivity-cutoff-in-activity-metrics-updater/ISSUE.mdevidence.mddevelopbefore implementation, if maintainers require itlinter all, relevant tests, and any pre-push checks)manual-verification-evidence.mdagent-review-reports.mdwhen reviewers received this folder-style specificationdocs/issues/open/todocs/issues/closed/Progress Log
max_peer_timeout = 20; seeevidence.md.Stoppedclock), and a process follow-up assessment for repository guidance..github/skills/dev/debugging/fix-buglocation.docs/issues/open/- fix(swarm-coordination-registry): calculate activity-metrics cutoff per update #2226Acceptance Criteria
max_peer_timeout.max_peer_timeoutwithout a subsequent announce.Stopped-clock unit tests inswarm-coordination-registrycover both boundaries: a post-startup peer is counted inactive aftermax_peer_timeoutelapses, and remains active before it. The inactive-case test's red run against the pre-fix code is recorded in task evidence.evidence.mdis repeated against the fixed build and the inactive-peer gauge changes to1.linter allexits with code0.manual-verification-evidence.md.Verification Plan
Automatic Checks
cargo test -p torrust-tracker-swarm-coordination-registry --lib statistics::activity_metrics_updatercargo test -p torrust-tracker-swarm-coordination-registry --lib swarm::coordinatorcargo test -p torrust-tracker-core --lib torrent::managerlinter allManual Verification Scenarios
Status values:
TODO,IN_PROGRESS,DONE,FAILED,BLOCKED.evidence.mdV1 scenario against the fixed build: isolated tracker withmax_peer_timeout = 20, cleanup disabled, usage statistics enabled; announce one peer withtracker_client; wait more than 35 seconds without another announce.swarm_coordination_registry_peers_inactive_totalchanges from0to1in the metrics endpoint and the updater log reportsinactive_peers_total=1.manual-verification-evidence.mdsection V10for ~267 s after the timeout expired.evidence.mdV1Create
manual-verification-evidence.mdfromdocs/templates/MANUAL-VERIFICATION-EVIDENCE.mdwhen executing M1. Record actual prerequisites, commands, output, relevant tracker logs, and outcomes so it can be compared line-for-line withevidence.md.Disposable Verification Scripts
None planned. The behavior must be covered by maintained Rust tests and a human-oriented tracker run, not a temporary script.
Acceptance Verification
TODO/DONE)Risks and Trade-offs
tracker-coreandswarm-coordination-registrycould invert or expand package dependencies. Mitigation: assess the dependency direction before extracting a helper; retain two explicit call sites when that is the cleaner boundary.Process Follow-up
The bug-fix sequence used here (analyse, reproduce, choose the test type, write the failing test, fix, recheck) is not written down anywhere in the repository today: the
create-issueskill anddocs/templates/ISSUE.mdare type-agnostic, and the Implementer agent describes TDD generically. Assessment of the three options:create-issueskillBug-Fix Processtable and aRegression Test Strategysection, but the skill is about writing specs, not executing fixes. Keep it to the spec-shape requirement only.fix-bugskill at.github/skills/dev/debugging/fix-bug/write-unit-test,run-tracker-locally,use-tracker-client, andcreate-issue, and the Implementer agent would invoke it forissue-type: bug.docs/templates/ISSUE.mdissue-type: bug; delete otherwise"). Keeps a single template while making the process visible in every bug spec.Decision: do all three in one small follow-up issue, with the new skill as the canonical source and the
create-issue/template/Implementer changes as thin links to it (documentation single-source-of-truth policy). A parked draft for that issue already exists and will be opened after this issue is created; this bug's spec is cited there as the worked example. Do not expand this issue's scope to include that work.Implementation Completion Review
After implementation, compare the observed behavior and validation evidence with this specification. Record reusable lessons, material design changes, and deviations from the plan in
implementation-retrospective.mdif warranted; otherwise record why none was needed in the progress log. Independent reviewers who receive this folder-style specification record their result inagent-review-reports.mdusingdocs/templates/AGENT-REVIEW-REPORTS.md.References
docs/issues/drafts/1488-si-5-migrate-activity-metrics-updater/ISSUE.mdevidence.mdsrc/bootstrap/jobs/activity_metrics_updater.rs,packages/swarm-coordination-registry/src/statistics/activity_metrics_updater.rs, andpackages/tracker-core/src/torrent/manager.rs