Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
Show all changes
19 commits
Select commit Hold shift + click to select a range
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
4 changes: 2 additions & 2 deletions .gitignore
Original file line numberDiff line numberDiff line change
Expand Up@@ -75,12 +75,12 @@ mmif/ver
mmif/res
mmif/vocabulary
./VERSION*
VERSION
.hypothesis

# Documentation build artifacts
documentation/cli_help.rst
documentation/whatsnew.rst
documentation/whatsnew.md
documentation/autodoc
docs-test

# environments
Expand Down
76 changes: 73 additions & 3 deletions CONTRIBUTING.md
Original file line numberDiff line numberDiff line change
@@ -1,5 +1,60 @@
# Contributing to mmif-python

## Git Workflow

We follow a Gitflow-inspired branching model to maintain a stable `main` branch and a dynamic `develop` branch.

1. **Branch Roles**:
- `main`: Reserved for stable, production-ready releases.
- `develop`: The primary branch for ongoing development, feature integration, and bug fixes. This serves as the "staging" area for the next release.
2. **Issue Tracking**: Every contribution (bug fix or feature) must first be reported as a [GitHub Issue](https://github.com/clamsproject/mmif-python/issues). Issues should clearly define goals and, preferably, include an implementation plan.
3. **Branch Naming**: Create a dedicated working branch for each issue. Branches must be named using the format `NUM-short-description`, where `NUM` is the issue number (e.g., `113-fix-file-loading`).
4. **Pull Requests (PRs)**:
- Once work is complete, open a PR targeting the `develop` branch.
- **Communication**: High-level discussion and planning should occur in the issue thread. The PR conversation is strictly for code review and implementation-specific feedback.
5. **Releases**:
- When `develop` is ready for a new release, open a PR from `develop` to `main` using the "release" PR template.
- After merging the release candidate into `main`, manually tag the commit with the version number. This tag triggers the automated CI/CD pipeline for publishing.
6. **Branch Protection**: Both `main` and `develop` are protected branches. Direct pushes are disabled; all changes must be introduced via Pull Requests.

## CLI Scripts

The `mmif` command-line interface supports subcommands (e.g., `mmif source`, `mmif describe`). These are implemented as Python modules in `mmif/utils/cli/`.

### Adding a New CLI Script

To add a new CLI subcommand, create a Python module in `mmif/utils/cli/` with these three required functions:

1. **`prep_argparser(**kwargs)`** - Define and return an `argparse.ArgumentParser` instance for your subcommand. When called during discovery, the main CLI will pass `add_help=False` to this function to avoid duplicate help flags.

2. **`describe_argparser()`** - Return a tuple of two strings:
- A one-line description (shown in `mmif --help`)
- A more verbose description (shown in `mmif <subcommand> --help`)

3. **`main(args)`** - Execute the subcommand logic with the parsed arguments.

[!NOTE]
> CLI modules should typically act as thin wrappers. It is recommended to implement the core utility logic in other packages (e.g., `mmif.utils`) and import it into the CLI module. See existing modules like `summarize.py` (which imports from `mmif.utils.summarizer`) or `describe.py` for examples.

### How CLI Discovery Works

The CLI system automatically discovers subcommands at runtime. The entry point is configured in the build script (currently `setup.py`) as follows:

```python
entry_points={
'console_scripts': [
'mmif = mmif.__init__:cli',
],
},
```

The `cli()` function in `mmif/__init__.py` handles discovery and delegation. It uses `pkgutil.walk_packages` to find all modules within the top-level of the `mmif.utils.cli` package. For the discovery logic to work, a "cli module" should implement the requirements outlined above.

This means adding a properly structured module within the CLI package is all that's needed—the module name will automatically be registered as a subcommand. No modifications to `setup.py` or other configuration files are required.

> [!NOTE]
> Any "client" code (not shell CLI) wants to use a module in `cli` package should be able to directrly `from mmif.utils.cli import a_module`. However, for historical reasons, some CLI modules are manually imported in `mmif/__init__.py` (e.g., `source.py`) for backward compatibility for clients predateing the discovery system.

## Documentation

The documentation for `mmif-python` is built using Sphinx and published to the [CLAMS documentation hub](https://github.com/clamsproject/website-test).
Expand All@@ -9,12 +64,27 @@ The documentation for `mmif-python` is built using Sphinx and published to the [
To build the documentation for the current checkout:

```bash
make doc
# OR
python3 build-tools/docs.py
```

The output will be in `documentation/_build/html`.
The output will be in `docs-test`. For more options, run `python build-tools/docs.py --help`.

### API Documentation (autodoc)

As of 2026 (since the next version of 1.2.1), API documentation is **automatically generated** using `sphinx-apidoc`. When you run the documentation build:

1. The `run_apidoc()` function in `documentation/conf.py` runs automatically
2. It scans packages listed in `apidoc_package_names` (currently `mmif` and `mmif_docloc_http`)
3. RST files are generated in `documentation/autodoc/`
4. These files are **not tracked in git** - they're regenerated on each build

**When you add a new module or subpackage**, it will be automatically documented on the next build. No manual updates required.

**To add a new top-level package** (like `mmif_docloc_http`), add it to `apidoc_package_names` in `documentation/conf.py`.

**To exclude a subpackage** from documentation (like `mmif.res` or `mmif.ver`), add it to `apidoc_exclude_paths`.

**Module docstrings** in `__init__.py` files are used as package descriptions in the documentation. Keep them concise and informative.

### Building Documentation for Old Versions

Expand Down
21 changes: 8 additions & 13 deletions Makefile
Original file line numberDiff line numberDiff line change
Expand Up@@ -36,17 +36,12 @@ publish: distclean version package test
$(generatedcode): dist/$(sdistname)*.tar.gz

docs:
@echo "WARNING: The 'docs' target is deprecated and will be removed."
@echo "The 'docs' directory is no longer used. Documentation is now hosted in the central CLAMS documentation hub."
@echo "Use 'make doc' for local builds or 'make doc-version' for specific versions."
@echo "Nothing is done."
@echo "The 'docs' target is deprecated and will be removed."
@echo "Documentation is now managed by 'build-tools/docs.py'."
@echo "Please run 'python3 build-tools/docs.py --help' for usage."

doc: # for single version sphinx - builds current source
python3 build-tools/docs.py

doc-version: # interactive build for specific version
@read -p "Enter version/tag to build (e.g., v1.0.0): " ver; \
[ -n "$$ver" ] && python3 build-tools/docs.py --build-ver $$ver
doc: docs
doc-version: docs

package: VERSION dist/$(sdistname)*.tar.gz

Expand DownExpand Up@@ -85,15 +80,15 @@ version: VERSION; cat VERSION
# since the GH api will return tags in chronological order, we can just grab the last one without sorting
AUTH_ARG := $(if $(GITHUB_TOKEN),-H "Authorization: token $(GITHUB_TOKEN)")

VERSION.dev: devver := $(shell curl --silent $(AUTH_ARG) "https://api.github.com/repos/clamsproject/mmif-python/git/refs/tags" | grep '"ref":' | sed -E 's/.+refs\/tags\/([0-9.]+)",/\1/g' | tail -n 1)
VERSION.dev: specver := $(shell curl --silent $(AUTH_ARG) "https://api.github.com/repos/clamsproject/mmif/git/refs/tags" | grep '"ref":' | grep -v 'py-' | sed -E 's/.+refs\/tags\/(spec-)?([0-9.]+)",/\2/g' | tail -n 1)
VERSION.dev: devver := $(shell curl --silent $(AUTH_ARG) "https://api.github.com/repos/clamsproject/mmif-python/git/refs/tags" | grep '"ref":' | sed -E 's/.+refs\/tags\/([0-9.]+)",/\1/g' | sort -V | tail -n 1)
VERSION.dev: specver := $(shell curl --silent $(AUTH_ARG) "https://api.github.com/repos/clamsproject/mmif/git/refs/tags" | grep '"ref":' | grep -v 'py-' | sed -E 's/.+refs\/tags\/(spec-)?([0-9.]+)",/\2/g' | sort -V | tail -n 1)
VERSION.dev:
@echo DEVVER: $(devver)
@echo SPECVER: $(specver)
@if [ $(call macro,$(devver)) = $(call macro,$(specver)) ] && [ $(call micro,$(devver)) = $(call micro,$(specver)) ] ; \
then \
if [[ $(devver) == *.dev* ]]; then echo $(call increase_dev,$(devver)) ; else echo $(call add_dev,$(call increase_patch, $(devver))); fi \
else echo $(call add_dev,$(specver)) ; fi \
else if [[ $(devver) == *.dev* ]]; then echo $(call increase_dev,$(devver)) ; else echo $(call add_dev,$(call increase_patch, $(devver))); fi ; fi \
> VERSION.dev

VERSION: version := $(shell git tag | sort -t. -k 1,1nr -k 2,2nr -k 3,3nr -k 4,4nr | head -n 1)
Expand Down
19 changes: 9 additions & 10 deletions README.md
Original file line numberDiff line numberDiff line change
@@ -1,21 +1,20 @@
## MultiMedia Interchange Format
[MMIF](https://mmif.clams.ai) is a JSON(-LD)-based data format designed for transferring annotation data between computational analysis applications in [CLAMS project](https://clams.ai).

[MMIF](https://mmif.clams.ai) is a JSON(-LD)-based data format designed for transferring annotation data between computational analysis applications of the [CLAMS project](https://clams.ai).


## mmif-python
`mmif-python` is a Python implementation of the MMIF data format.
`mmif-python` provides various helper classes and functions to handle MMIF JSON in Python,
including ;

1. de-/serialization of MMIF internal data structures to/from JSON
`mmif-python` is a Python implementation of the MMIF data format. It provides various helper classes and functions to handle MMIF JSON in Python, including:

1. serialization and de-serialization of MMIF internal data structures to/from JSON
2. validation of MMIF JSON
3. handling of CLAMS vocabulary types
4. navigation of MMIF object via various "search" methods (e.g. `mmif.get_all_views_contain(vocab_type))`)
4. navigation of MMIF objects via various "search" methods (e.g. `mmif.get_all_views_contain(vocab_type)`)

## For more ...

* [Version history and patch notes](https://github.com/clamsproject/mmif-python/blob/main/CHANGELOG.md)
* [MMIF Python API documentation](https://clamsproject.github.io/mmif-python)
* [MMIF Python API documentation](https://clamsproject.github.io/mmif-python/latest)
* [MMIF JSON specification and schema](https://clamsproject.github.io/mmif)

## For devs ...
* Build documentation: `python build-tools/docs.py --help`
* [Contributing guide](CONTRIBUTING.md)
25 changes: 25 additions & 0 deletions build-tools/docs.py
Original file line numberDiff line numberDiff line change
Expand Up@@ -40,13 +40,38 @@ def run_sphinx_build(self, *args, cwd=None, check=True):
return run_command([self.sphinx_build, *args], cwd=cwd, check=check)


def get_dummy_version():
"""Returns a dummy version based on current git branch and dirty status.
Falls back to 'unknown' if not in a git repository."""
try:
branch = subprocess.check_output(["git", "rev-parse", "--abbrev-ref", "HEAD"],
stderr=subprocess.DEVNULL, text=True).strip()
dirty = subprocess.run(["git", "diff", "--quiet"],
stderr=subprocess.DEVNULL, check=False).returncode != 0
return f"{branch}{'+dirty' if dirty else ''}"
except (subprocess.CalledProcessError, FileNotFoundError):
return "unknown"


def build_docs_local(source_dir: Path, output_dir: Path):
"""
Builds documentation for the provided source directory.
Assumes it's running in an environment with necessary tools.
"""
print("--- Running in Local Build Mode ---")

# Warning for user as VERSION file is critical
if sys.stdin.isatty():
import select
print("\nWARNING: The 'VERSION' file will be overwritten with a dummy version for this local build.")
print("Pausing for 3 seconds (press Enter to continue immediately)...")
select.select([sys.stdin], [], [], 3)

# Overwrite VERSION file with dummy version for local builds
version = get_dummy_version()
print(f"Generating dummy VERSION for local build: {version}")
(source_dir / "VERSION").write_text(version)

# 1. Generate source code and install in editable mode.
print("\n--- Step 1: Generating source code and installing in editable mode ---")
try:
Expand Down
37 changes: 0 additions & 37 deletions documentation/autodoc/mmif.serialize.rst

This file was deleted.

49 changes: 0 additions & 49 deletions documentation/autodoc/mmif.utils.rst

This file was deleted.

28 changes: 0 additions & 28 deletions documentation/autodoc/mmif.vocabulary.rst

This file was deleted.

11 changes: 0 additions & 11 deletions documentation/autodoc/mmif_docloc_http.rst

This file was deleted.

14 changes: 7 additions & 7 deletions documentation/cli.rst
Original file line numberDiff line numberDiff line change
@@ -1,16 +1,16 @@
.. _cli:

``mmif`` shell command
======================
The ``mmif`` shell command
==========================

``mmif-python`` comes with a command line interface (CLI) that allows you to handle MMIF files. Many of these commands are designed to handle MMIF files in the context of CLAMS workflows.

The CLI is installed as ``mmif`` shell command. To see the available commands, run
The CLI scripts are installed as subcommands of the ``mmif`` shell command. Run the following to see the available commands or the MMIF version:

.. code-block:: bash
.. include:: cli_help.rst

mmif --help
Please take a look at the individual command documentation for more details on each command:

The following documentation is automatically generated from the CLI help messages.
.. code-block:: text

.. include:: cli_help.rst
$ mmif <SUBCOMMAND> --help
Loading
Loading