Actions: mattdani21/ModelSwapper
Actions
Showing runs from all workflows
62 workflow runs
62 workflow runs
Merge pull request #17 from mattdani21/autopilot/agent-execution-2026…
CI
#62:
Commit 929fbdd
pushed
by
mattdani21
docs: add intent, specifications and agent delivery packets (G1.3/G1.5)
CI
#61:
Pull request #17
opened
by
mattdani21
page fix (review t_23f2732a): pipeline third failure refactor-11 -> r…
CI
#60:
Commit 379064e
pushed
by
mattdani21
STATE: G1.3 KV prefix cache lever measured + reviewer-approved (-91.8…
CI
#59:
Commit b762749
pushed
by
mattdani21
audit corrections (Addendum 4): retry claim retracted, bug-corrupted …
CI
#58:
Commit 0cb7152
pushed
by
mattdani21
docs: roadmap to revenue — two engines (validation services now, prod…
CI
#57:
Commit 6e7a6c3
pushed
by
mattdani21
docs: competitive note — FreeToken threat matrix + red line + response
CI
#56:
Commit 114ea86
pushed
by
mattdani21
hardware: t4_stack_run.sh — the 8GB-box swapper on any Mac >= 8GB
CI
#55:
Commit af20a4e
pushed
by
mattdani21
runbooks: caffeinate -dims -w during runs (overnight Macs must not sl…
CI
#54:
Commit 1b4829f
pushed
by
mattdani21
hardware: T4-16 tier — very-small-Mac coding stack (16GB)
CI
#53:
Commit 04015e0
pushed
by
mattdani21
hardware: T0 runbook (G1.5) — one-command 24GB Air pipeline run
CI
#52:
Commit aa7fde7
pushed
by
mattdani21
STATE: G2.1/G2.2 closed; G1.2 re-confirmed at 94.0%; G1.3 near-miss o…
CI
#51:
Commit 582277a
pushed
by
mattdani21
data: full-50 suite at 8192 — sequential 47/50 (94.0%), overlap 45/50…
CI
#50:
Commit 5d3fd0f
pushed
by
mattdani21
colab: phase2 notebook — overlap A/B on the FULL 50-task suite (AB_LI…
CI
#49:
Commit 2483dbb
pushed
by
mattdani21
STATE: G2.3 closed with 27B evidence; G2.2 mechanics proven; G2.1 met…
CI
#48:
Commit 9bf3f93
pushed
by
mattdani21
data: 8192-context rerun — G2.3 DECIDED (both halves TRUE at 27B scale)
CI
#47:
Commit f04fd8d
pushed
by
mattdani21
data: 27B Colab Phase 2 run — ablation + overlap A/B (RTX PRO 6000)
CI
#46:
Commit 364a831
pushed
by
mattdani21
ablation smoke 2: thesis mechanism holds at the floor (3/3 both, caps…
CI
#45:
Commit aa2c6f5
pushed
by
mattdani21
ablation: smoke run 1 data + written analysis (G2.3)
CI
#44:
Commit 1a35696
pushed
by
mattdani21
loop: bound critic feedback to 600 chars in the prompt (retry overflo…
CI
#43:
Commit f4c49ee
pushed
by
mattdani21
AGENTS.md: gate includes pipeline/tests; document Phase 2 commands
CI
#42:
Commit 0ca429e
pushed
by
mattdani21
colab: phase2 eval notebook — ablation (G2.3) + overlap A/B (G2.2) at…
CI
#41:
Commit 0050ab0
pushed
by
mattdani21
phase2: overlap backend wired into the pipeline (--backend overlap)
CI
#40:
Commit f3eaa96
pushed
by
mattdani21
docs: ADR-0005 (Phase 2 swap engineering) + STATE.md Phase 2 status
CI
#39:
Commit d9f3d66
pushed
by
mattdani21
results: drop overlap run with pre-fix load_s sentinel (112549)
CI
#38:
Commit f9b4114
pushed
by
mattdani21