docs: add intent, specifications and agent delivery packets (G1.3/G1.5) - #17
Merged
Merged
Conversation
mattdani21
marked this pull request as ready for review
September 5, 2026 14:31
Uh oh!
There was an error while loading. Please reload this page.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for freeto join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Existing plans and status notes do not consistently match the implemented repository. Agents need a reliable source map and bounded contracts before taking implementation tickets.
This documentation change adds intent, a dependency roadmap, reviewed context/findings, technical specifications and developer/test work packets under
docs/execution/. It adds two repository-scoped skills and links the package from root instructions. Historical evidence and existing domain constraints are preserved; stale status statements are qualified with a dated review checkpoint.The work packets identify implementation ownership, independent verification, input/output/error behavior, acceptance criteria, dependencies and rollback. Readiness is separate from future implementation completion. This PR does not implement the proposed application fixes or claim that their acceptance tests already pass.
Validation: 37 capsule/grader/pipeline tests passed with isolated CPU dependencies; 50 benchmark tasks passed structural validation. No hardware or API baseline run.
All 12 repository-scoped skills across this six-repository review passed the skill validator. New documentation links and bounded packet structure were checked locally. No merge, deployment, training, external send or customer-data operation is included.
Goal references: G1.3 and G1.5. Four-number impact: this user-requested documentation prepares quality, latency and hardware-floor measurements; it records no new numerical improvement. It preserves the frozen task/grader/baseline boundaries.